Georgia Power solar buyback: the 2026 rate and how netting works
Published November 16, 2026. Rules checked November 16, 2026.
- Net billing Georgia: Tariff RNR-11, Instantaneous Netting. Solar avoided energy cost of 3.2188¢/kWh for 2026 plus a 4¢/kWh adder.12
EIA counted 12,412 residential net-metering installations at Georgia Power at the end of 2025.3
Tariffs checked November 16, 2026; EIA-861 2025 final data, released October 7, 2026.
Source: Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data; Census Bureau, Cartographic boundary files, states. States shaded by their program type; EIA-861 2025 rows of the utility.
Show the numbers
| State | Residential installations |
|---|---|
| Georgia (Georgia Power Co) | 12,412 |
Georgia Power buys back rooftop solar as a bill credit, not at the retail price: for 2026, each exported kilowatt-hour earns the Solar Avoided Cost Rate of 3.2188¢ plus a 4¢ adder the Public Service Commission approved in the 2022 rate case.1 Exports are measured at every instant, so only the power leaving the house at the moment it is produced earns that credit; solar used inside the home simply never appears as a purchase.2
The 2026 buyback rate, in two parts
Georgia Power's own rooftop solar FAQ gives the answer to "how much does Georgia Power pay for solar". Excess energy from a customer's panels is credited at the annual Solar Avoided Cost Rate, "which is 3.2188 ¢/kWh for the year 2026", and on top of that comes "an additional 4¢/kWh" the Public Service Commission approved during the 2022 rate case.1 Tariff RNR-11 calls that second part the Renewable Generation Adder. Added together, an exported kilowatt-hour earns 7.2188¢ in 2026.
The two parts behave differently. The avoided-cost part is an annual figure: the 3.2188¢ value is stated for 2026 only. The 4¢ adder is a fixed amount per kWh.1 The avoided costs behind the first part are set under Georgia Public Service Commission Dockets 4822 and 16573, which the tariff names.2
The credits are summed against the monthly bill, and their rate is well below what a kilowatt-hour from the grid costs. Georgia households paid an average of 15.17¢ per kWh5 over the 12 months to August 2026; that average includes fixed charges and is not a Georgia Power tariff rate.2
| Rule | What applies |
|---|---|
| Program type | Net billing |
| Program | Tariff RNR-11, Instantaneous Netting |
| Export credit | Solar avoided energy cost of 3.2188¢/kWh for 2026 plus a 4¢/kWh adder12 |
| Netting interval | Instantaneous |
| Unused credits and charges | Credits summed monthly against the bill |
Next to the export credits of the other utilities we cover, Georgia Power's credit is one flat number with no season, hour or tranche, and its netting column reads "Instantaneous".
| APS | Arizona | Net billing | Rate Rider RCP (Resource Comparison Proxy export rate) | $0.05554/kWh for the 2026 tranche, locked for 10 years67 | None (instantaneous) |
|---|---|---|---|---|---|
| SRP | Arizona | Net billing | Solar export-rate price plans (such as Conserve 6-9 p.m. and Save) | $0.0187/kWh from the May 2026 billing cycle, recalculated each May89 | None on export-rate plans |
| TEP | Arizona | Net billing | Rider R-14 (Resource Comparison Proxy export rate) | $0.0462/kWh for applications from October 1, 2026, locked for 10 years1011 | None (instantaneous) |
| LADWP | California | Net metering | Service Rider NEM (Net Energy Metering) | Excess credited at the customer's own rate-schedule energy price12 | Monthly |
| PG&E | California | Net billing | Net Billing Tariff (Schedule NBT, "Solar Billing Plan") | Hourly Avoided Cost Calculator export values; ACC Plus adder of $0.0088/kWh for 2026 applications13 | None |
| SCE | California | Net billing | Net Billing Tariff (Schedule NBT) | Hourly Energy Export Credit prices from the Avoided Cost Calculator; ACC Plus adder of $0.016/kWh for the 2026 vintage14 | None |
| SDG&E | California | Net billing | Net Billing Tariff (Schedule NBT, "Solar Billing Plan") | Hourly Avoided Cost Calculator export values; no ACC Plus adder for residential customers15161718 | None |
| SMUD | California | Net billing | Rate Schedule SSR (Solar and Storage Rate) | $0.0960/kWh flat from June 1, 2026, updated every four years19 | None |
| Xcel Energy | Colorado | Net metering | Net Metering Service, Schedule NM | Excess kWh carried month to month at retail2021 | Monthly (by time-of-use period on TOU rates) |
| Eversource | Connecticut | Net billing | Residential Renewable Energy Solutions (RRES): Netting or Buy-All | Buy-All $0.3289/kWh for 2026 applications for 20 years; Netting at retail minus a $0.0402/kWh Solar Energy Adjustment on total production22 | Monthly (Netting) |
| Pepco | District of Columbia | Net metering | Net energy metering (15 DCMR ch. 9) | Monthly excess credited in kWh to the next bill23 | Monthly |
| Duke Energy | Florida | Net metering | Florida net metering rule (Rule 25-6.065, F.A.C.) | Excess generation credited as kWh against later usage2425 | Monthly |
| FPL | Florida | Net metering | Net Metering of Customer-Owned Renewable Generation (Tariff Sheet No. 10.010) | Excess kWh credited 1:1 to the next month2627 | Monthly |
| Georgia Power | Georgia | Net billing | Tariff RNR-11, Instantaneous Netting | Solar avoided energy cost of 3.2188¢/kWh for 2026 plus a 4¢/kWh adder12 | Instantaneous |
| Hawaiian Electric | Hawaii | Net billing | Smart Renewable Energy (SRE) Export, Rule No. 32 | Time-of-day export rates by island; Oahu 18.9¢ overnight, 13.5¢ daytime, 32.9¢ evening peak (2024–2026)2829 | By time of day |
| Idaho Power | Idaho | Net billing | Schedule 6 on-site generation: real-time net billing with an Export Credit Rate | Summer on-peak 15.6836¢, summer off-peak 3.3920¢, non-summer 2.9019¢ per kWh (from October 1, 2025)3031 | Real time |
| ComEd | Illinois | Net metering, reduced excess | Net metering under Rider POGNM (supply-only for systems from 2025) | Credits only against the energy-supply section of the bill3233 | Monthly (hourly for hourly-pricing customers) |
| Duke Energy | Indiana | Net billing | Excess Distributed Generation (IC 8-1-40) | 1.25 times the supplier's average marginal price of the prior calendar year34 | Instantaneous |
| Duke Energy | Kentucky | Net billing | Net metering under KRS 278.466 (Rider NM II) | Every exported kWh earns the Avoided Cost Excess Generation Credit of $0.074805/kWh, from July 10, 2026 (Kentucky PSC Case No. 2025-00258)3536 | Dollar values netted each billing period |
| Pepco | Maryland | Net metering | Net energy metering (PUA §7-306) | Billing-cycle kWh netting at retail37 | Monthly |
| Eversource | Massachusetts | Net metering | Net Metering tariff (M.D.P.U. No. 68N) | Excess kWh times basic service, distribution, transmission and transition charges38 | Monthly |
| National Grid | Massachusetts | Net metering | Net Metering Provision (M.D.P.U. No. 1625) | Standard Net Metering Credit: excess kWh times basic service, distribution, transmission and transition charges39 | Monthly |
| Xcel Energy | Minnesota | Net metering, reduced excess | Rate Code A50 (systems under 40 kW AC) | Monthly net excess paid at the average retail utility energy rate4041 | Monthly |
| NV Energy | Nevada | Net metering, reduced excess | Net Metering Rider NMR-405 (Tier 4 Excess Energy Credit) | $0.08717/kWh for Nevada Power single-family homes (75% of the $0.11622 base rate) from July 1, 202642 | Set by tariff |
| Eversource | New Hampshire | Net metering, reduced excess | Alternative Net Metering Tariff (NEM 2.0), NHPUC No. 10 | Net monthly exports credited at the Default Energy Service rate plus transmission charges plus 25% of distribution charges43 | Monthly |
| PSE&G | New Jersey | Net metering | Net metering (N.J.A.C. 14:8-4) | Credits carried through a 12-month annualized period44454647 | Annualized period |
| Con Edison | New York | Net metering | VDER Phase One net energy metering | kWh net metering with a 20-year term; Customer Benefit Contribution of $1.29 per kW-DC a month in 2026484950 | Monthly |
| National Grid | New York | Net metering | VDER Phase One net energy metering | kWh net metering with a 20-year term; Customer Benefit Contribution of $0.97 per kW-DC a month in 2026484950 | Monthly |
| PSEG Long Island | New York | Net metering | Phase One net metering (LIPA Tariff for Electric Service) | Net monthly exports credited at the full per-kWh rate of the service class5152 | Monthly (TOU periods banked separately) |
| Duke Energy | North Carolina | Successor netting | Residential Solar Choice (Rider RSC) and Net Metering Bridge (Rider NMB) | Net monthly exports credited at the Net Excess Energy Credit, based on avoided cost: 4.53¢/kWh (Duke Energy Carolinas) or 3.94¢/kWh (Duke Energy Progress)535455 | Monthly, by time-of-use period |
| Rocky Mountain Power | Oregon | Net metering | Pacific Power Schedule 135 Net Metering Service | Monthly net excess becomes a kWh credit at the full retail rate5657 | Monthly |
| Duke Energy | South Carolina | Successor netting | Solar choice metering (S.C. Code §58-40-20): Riders RNM, IRSC, RSC and NSC | Set in the utility's solar choice tariff5859 | Set by tariff |
| Rocky Mountain Power | Utah | Net billing | Schedule No. 137 Net Billing Service | 4.855¢/kWh June–September, 4.033¢/kWh October–May (from March 1, 2026)60 | None |
| Dominion Energy | Virginia | Net metering | Net energy metering (Va. Code §56-594); successor "NEM 2.0" approved April 30, 2026 | Current: kWh netting at retail over the year; NEM 2.0: annual net excess at $0.05829/kWh, 30-minute interval, $1.00 monthly charge6162 | 12-month period |
Checked November 16, 2026; each credit is footnoted to the tariff, order or official page with its effective date.
Why "netting" here is not net metering
Retail net metering lets an exported kilowatt-hour cancel one bought later, so both are worth the same. Georgia Power's open option works on a different clock. In RNR-11, in effect with bills for the billing month of January 2023, "Excess Energy" is "electricity delivered to the grid by a Customer's generation resource at any time, which exceeds the electricity supplied by the Company to the Customer."2
"At any time" is the operative phrase. The comparison is made instant by instant. When the panels produce more than the house draws, the surplus flows out and earns the export credit; when the house draws more than the panels produce, the shortfall is bought at the normal price. The export credits are then summed against the monthly bill.2 That is net billing: each exported kWh earns a separate export rate instead of offsetting a purchased kWh. Our guide to net billing vs net metering sets the two side by side.
The consequence for a household is about timing more than system size. A kilowatt-hour of solar used by an air conditioner running at midday displaces a purchased kWh. The same kilowatt-hour exported while nobody is home earns 7.2188¢.1
Two illustrative households with the same panels
The two worked examples below use the same code as our export credit calculator and the Georgia Power 2026 credit. The usage and annual solar output are identical and are our own illustrative inputs, not a typical Georgia system. The only change is the share of output used in the house as it is produced, which is twice as high in the second example; each figure states it.
Inputs: 1,000 kWh a month of use; 8,500 kWh a year of solar output spread evenly over the months; 30% of output used at home as it is produced; energy price 15.17¢ per kWh (the Georgia average residential price over the 12 months to August 2026, which includes fixed charges).
| Solar production in a year | 8,500 kWh |
|---|---|
| Used at home as it is produced | 2,550 kWh |
| Sent to the grid (exports) | 5,950 kWh |
| Bought from the grid (imports) | 9,450 kWh |
| Value of solar used at home, at your energy price | $387 |
| Value of exports under this tariff | $430 |
| Average credit per exported kWh | 7.219¢ |
| Energy charges for a year without solar | $1,820 |
| Energy charges for a year with solar, before fixed charges | $1,004 |
Source: Energy Information Administration, Electricity retail sales, residential average price. Export treatment from the tariff cited in the text (3.2188¢ solar avoided cost plus the 4¢ adder.). An illustration of the crediting rule, not a quote or a savings estimate: fixed charges, minimum bills, taxes and time-of-use prices are not modelled. Try your own numbers in the export credit calculator.
Inputs: 1,000 kWh a month of use; 8,500 kWh a year of solar output spread evenly over the months; 60% of output used at home as it is produced; energy price 15.17¢ per kWh (the Georgia average residential price over the 12 months to August 2026, which includes fixed charges).
| Solar production in a year | 8,500 kWh |
|---|---|
| Used at home as it is produced | 5,100 kWh |
| Sent to the grid (exports) | 3,400 kWh |
| Bought from the grid (imports) | 6,900 kWh |
| Value of solar used at home, at your energy price | $774 |
| Value of exports under this tariff | $245 |
| Average credit per exported kWh | 7.219¢ |
| Energy charges for a year without solar | $1,820 |
| Energy charges for a year with solar, before fixed charges | $801 |
Source: Energy Information Administration, Electricity retail sales, residential average price. Export treatment from the tariff cited in the text (3.2188¢ solar avoided cost plus the 4¢ adder.). An illustration of the crediting rule, not a quote or a savings estimate: fixed charges, minimum bills, taxes and time-of-use prices are not modelled. Try your own numbers in the export credit calculator.
The panels and the export credit are the same in both; what differs is how many kilowatt-hours reach the grid. Those are valued at the export credit, while the self-consumed share is valued at the energy price shown on each figure, the Georgia average including fixed charges. A real Georgia Power bill also has fixed charges and rate details the calculator does not model, so treat the figures as a way to see the crediting rule at work, not as a bill forecast.
The monthly netting pilot: closed, ending by 2038
Some Georgia Power solar homes are on a second option, RNR-Monthly Netting. It is limited to an existing pilot of 5,000 customers and is closed to new participants.2
| RNR-Instantaneous Netting | RNR-Monthly Netting | |
|---|---|---|
| Open to new solar customers | Yes, first come, until all renewable sources reach 0.2% of the prior year's peak demand | No; existing 5,000-customer pilot only |
| What counts as excess | Electricity delivered to the grid at any time beyond what Georgia Power is supplying | Excess energy beyond the customer's total monthly usage |
| Credit for the excess | Solar Avoided Cost Rate plus the 4¢ adder1 | Solar Avoided Energy cost rate |
| How long | Default, open option | 15-year term ending no later than December 31, 2038, then instantaneous netting2 |
Within a billing month, the pilot lets exports and purchases cancel each other, which is closer to classic net metering. Only the surplus above the month's total usage drops to the avoided-cost rate. Anyone buying a Georgia Power home that already has panels should ask which of the two options the account is on: the pilot does not reopen, and its terms run out by December 31, 2038 at the latest.2
Applying: the 10 kW AC limit and the interconnection fee
Approval of a home solar facility starts with its size. Residential customers may install a system with a peak generating capacity of up to 10 kW AC.1 The limit is stated in kW AC, the inverter's output, not the panels' DC rating.
Georgia Power charges an interconnection fee. According to the utility, it "covers the costs associated with processing and managing the application, Witness Testing, and reprogramming the meter for projects <250kW AC."1
Instantaneous netting is offered first come, first served until all renewable sources reach 0.2% of Georgia Power's prior-year peak demand. The application process and the fee are described on Georgia Power's rooftop solar FAQ page, and the crediting terms are in tariff RNR-11.12
Georgia Power's place in Georgia solar
Georgia Power had 12,412 residential net-metered installations at the end of 2025, totalling 82 MW. Nationally that count ranks only 65th among utility-state rows, yet it is 51%3 of Georgia's residential installations.
Almost half of the state's solar homes are not on RNR-11. In all, 393 Georgia utilities reported residential net-metered installations. RNR-11 is Georgia Power's tariff, so customers of an electric membership corporation or a city utility need their own utility's schedule.2 The chart shows how the count splits.
Source: Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data. EIA-861 utility rows, all technologies; utility names as reported to EIA.
Show the numbers
| Utility | Residential installations |
|---|---|
| Georgia Power Co | 12,412 |
| Walton Electric Member Corp | 2,411 |
| Jackson Electric Member Corp - (GA) | 1,253 |
| GreyStone Power Corporation | 1,185 |
| Coastal Electric Member Corp - (GA) | 995 |
| Sawnee Electric Membership Corporation | 868 |
| Flint Electric Membership Corp | 659 |
| Cobb Electric Membership Corp | 628 |
| Central Georgia El Member Corp | 536 |
| Okefenoke Rural El Member Corp | 309 |
| Satilla Rural Elec Member Corporation | 274 |
| Coweta-Fayette El Member Corp | 272 |
| Colquitt Electric Membership Corp | 265 |
| Carroll Electric Member Corp - (GA) | 223 |
| Canoochee Electric Member Corp | 215 |
| Amicalola Electric Member Corp | 209 |
| Jefferson Electric Member Corp | 205 |
| Habersham Electric Membership Corp | 146 |
| Hart Electric Member Corp | 134 |
| Southern Rivers Energy | 134 |
| Mitchell Electric Member Corp | 98 |
| Excelsior Electric Member Corp | 88 |
| Rayle Electric Membership Corp | 87 |
| Grady Electric Membership Corp | 74 |
| Sumter Electric Member Corp | 68 |
| Tri-County Elec Member Corp (GA) | 63 |
| Diverse Power Incorporated | 62 |
| Planters Electric Member Corp | 55 |
| Three Notch Elec Member Corp | 48 |
| Altamaha Electric Member Corp | 46 |
| Oconee Electric Member Corp | 46 |
| City of Marietta - (GA) | 40 |
| Albany Utility Board | 32 |
| Washington Elec Member Corp | 30 |
| City of Lawrenceville - (GA) | 19 |
| City of Calhoun - (GA) | 12 |
| City of Buford | 8 |
| Crisp County Power Comm | 6 |
| City of Thomasville - (GA) | 5 |
Across all utilities, Georgia's net-metering customers grew 398%63 between 2020 and 2025.
The full statewide picture, including adoption per household and small-scale solar generation, is on our Georgia page.
The federal tax credit for Georgia Power customers
The 2026 export credit applies to a system bought this year without any federal homeowner credit alongside it. Section 25D does not reach expenditures made after December 31, 2025, and the statute dates an expenditure by the completion of the original installation, so a deposit paid in 2025 on panels connected in 2026 does not qualify. Households with a 2025 system whose credit exceeded that year's tax use the remainder in later years.64
A leased system or PPA moves the tax question to the company that owns the panels. It may claim the §48E investment credit, but for solar whose construction begins after July 4, 2026 only if the system is in service by December 31, 2027.6566 The household claims nothing; its contract decides whether any of that credit lowers its payment. The federal solar tax credit page has the details.
Questions and answers
How much does Georgia Power pay for solar in 2026?
Each kWh of excess energy is credited at the annual Solar Avoided Cost Rate, 3.2188¢ per kWh for 2026, plus an additional 4¢ per kWh approved in the 2022 rate case: 7.2188¢ per exported kWh in total.1
Does Georgia Power have net metering?
Not retail net metering for new customers. The open option, RNR-Instantaneous Netting, counts any electricity a customer's system delivers to the grid beyond what Georgia Power is supplying at that moment as Excess Energy, and credits it at the export rate.2
Can I still join Georgia Power's monthly netting program?
No. RNR-Monthly Netting is limited to its existing 5,000-customer pilot and is closed to new participants; pilot customers move to instantaneous netting when their 15-year term ends, no later than December 31, 2038.2
What size solar system does Georgia Power allow on a home?
Residential customers may install a system with a peak generating capacity of up to 10 kW AC.1
What does the Georgia Power interconnection fee pay for?
Georgia Power says the fee covers processing and managing the application, witness testing and reprogramming the meter, for projects under 250 kW AC.1
Related pages
Sources
- Georgia Power – Residential Rooftop Solar FAQs, Georgia Power web page, checked 2026-11-16.
excess energy generated by a customer's solar panels are credited at the annual Solar Avoided Cost Rate per kilowatt hour (kWh), which is 3.2188 ¢/kWh for the year 2026. During the 2022 rate case, the Public Service Commission approved an additional 4¢/kWh that will be added to the annual solar …
Checked November 16, 2026. georgiapower.com - Georgia Power Electric Service Tariff: Renewable and Nonrenewable Resources, Schedule "RNR-11", Schedule RNR-11, Original 11.00, effective with bills rendered for the billing month of January 2023; avoided costs per GPSC Dockets 4822 and 16573.
“Excess Energy” is electricity delivered to the grid by a Customer’s generation resource at any time, which exceeds the electricity supplied by the Company to the Customer. … Excess Energy that exceeds the customers total monthly usage, will be credited at the Solar Avoided Energy cost rate.
Checked November 16, 2026. georgiapower.com - Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data, Net_Metering_2025.xlsx (f8612025.zip), released October 7, 2026. eia.gov
- Census Bureau, Cartographic boundary files, states, cb_2025_us_state_20m. census.gov
- Energy Information Administration, Electricity retail sales, residential average price, electricity/retail-sales, sector RES, released October 23, 2026. eia.gov
- APS Rate Rider RCP – Partial Requirements Service for New On-Site Solar DG, Resource Comparison Proxy Export Rate, A.C.C. No. 6248, Revision No. 11, effective September 1, 2026 in ACC Decision No. 82122.
The Company will meter this Export Energy on an instantaneous basis and provide a monthly bill credit based on the purchase rate in this schedule. … Tranche 2025 September 1, 2025 through August 31, 2026 $0.06171 per kWh Tranche 2026 September 1, 2026 through August 31, 2027 $0.05554 per kWh … An …
Checked November 16, 2026. aps.com - APS Rate Rider EPR-6 Legacy (Frozen) – Net Metering, A.C.C. No. 6194, Revision No. 2, effective March 8, 2024 in Decision No. 79293.
Each Customer’s initial RCP rate will be applicable for 10 years from the time of their interconnection. ... A residential Customer may remain on this rate rider for up to 20 years from the date their solar generator was interconnected … After the December billing cycle, any export energy that has …
Checked November 16, 2026. aps.com - SRP – Conserve 6-9 p.m. and Save (solar price plan) page, SRP web page, checked 2026-11-16.
As of the May 2026 billing cycle, the export rate is $0.0187/kWh. The export rate is recalculated annually, with adjustments taking effect each May billing cycle. … The amount of energy used in your home is instantaneously monitored and recorded by your meter. ... This is different from net …
Checked November 16, 2026. srpnet.com - SRP – Compare Solar Price Plans, SRP web page, checked 2026-11-16.
SRP offers demand- and export-based plans for customers with on-site generation (e.g., rooftop solar systems) and battery energy storage systems. There are also options available to shift from a fixed price for each kilowatt-hour you send back to the grid (e.g., SRP’s export rate) to market-based …
Checked November 16, 2026. srpnet.com - TEP Statement of Charges (Sheet 801 series), Rider R-14 RCP rate history with ACC Decision numbers; Oct 1, 2026 rate per Decision No. 82172.
Rider R-14 – Resource Comparison Proxy (RCP) $0.0964 per kWh $0.0868 per kWh $0.0868 per kWh $0.0781 per kWh $0.0703 per kWh $0.0633 per kWh $0.0570 per kWh $0.0513 per kWh $0.0462 per kWh September 21, 2018 October 1, 2019 October 1, 2020 October 1, 2021 October 1, 2022 October 1, 2023 October 1, …
Checked November 16, 2026. docs.tep.com - TEP Rider R-14, Resource Comparison Proxy Export Rate (RCP-PRS), Sheet No. 714, Original Sheet 714-0/714-1, effective September 1, 2023, ACC Decision No. 79065.
The Company will meter this export power on an instantaneous basis and provide a monthly bill credit based on the purchase rate in this schedule. ... 3. Each Customer’s initial RCP rate will be applicable for 10 years from the time of their interconnection. … Each calendar year, for the customer …
Checked November 16, 2026. docs.tep.com - LADWP Electric Rates (rate ordinance, consolidated PDF hosted by LADWP), Service Rider NEM, "Rate Effective September 1, 2008" (ordinance adopting Resolution No. 009-009 of July 2, 2008); later ordinances may have amended rates — check current ordinance.
Customer owns and operates a permanent solar or wind turbine electrical generating facility or a hybrid system with a capacity of not more than one megawatt that is located on the customers premises … A credit for the energy received will be calculated using the applicable Rate Schedule energy …
Checked November 16, 2026. ladwp.com - PG&E Electric Schedule NBT – Net Billing Tariff (NBT) Service, Cal. P.U.C. Sheets 55440-E et seq.; Advice 6848-E (eff. 2023-03-01), Advice 7174-E (eff. 2024-02-15); CPUC D.22-12-056, D.23-11-068.
The NBT schedule may also be referred to as the Solar Billing Plan in customer-facing communications. Residential customers, including Load Aggregation Generating/Aggregated Accounts, taking service on NBT must take service on the E-ELEC (ELECTRIC HOME) rate schedule … For both residential and …
Checked November 16, 2026. pge.com - SCE Schedule NBT – Net Billing Tariff, Cal. PUC Sheets 85375-E et seq. (e.g., Sheet 30 = 87700-E); Advice 4961-E/4961-E-A (eff. 2023-03-01), 5170-E-A (eff. 2023-12-14), 5228-E (eff. 2024-02-15), 5533-E (eff. 2025-04-23); D.22-12-056; D.23-11-068.
Residential Customers taking service under this Schedule must be on the Prime Option of Schedule TOU-D. … multiplying the hourly-differentiated Customer’s Energy Export (channel 2) in kWh by the applicable Energy Export Credit Price (EEC Price), as defined below, derived from the approved Avoided …
Checked November 16, 2026. sce.com - CPUC – Net Billing Tariff page, CPUC web page.
The NBT will apply to customers who submit an interconnection application on or after April 15, 2023.
Checked November 16, 2026. cpuc.ca.gov - CPUC Decision 22-12-056, Decision Revising Net Energy Metering Tariff and Subtariffs (R.20-08-020), issued Dec. 19, 2022, D.22-12-056, Table 7 and §8.
Table 7. Adopted Initial ACC Plus Adders by Utility ($/kWh) Customer Segment PG&E SDG&E SCE Residential Non-CARE $0.022 $0.000 $0.040 Residential CARE $0.090 $0.000 $0.093 … Because SDG&E net billing tariff customers will have payback periods of less than nine years, the graph does not indicate a glide path.
Checked November 16, 2026. docs.cpuc.ca.gov - SDG&E, Solar Billing Plan Export Pricing, page captured May 16, 2026 (2026 export pricing files).
The Energy Export Credits for a given installation vintage of customers in a given calendar year are based on the applicable vintage of Avoided Cost Calculator (ACC) forecast of values for that year. ... Take the straight-average ACC value across the Climate Zones for each hour. ... For each hour …
Checked November 16, 2026. sdge.com - CPUC, Net Energy Metering and Net Billing - Key Information. Effective: 2023-04-15.
Since April 15, 2023, customers applying for interconnection have taken service on the new net billing tariff (NBT) pursuant to D.22-12-056 . ... The IOUs refer to the NBT as the “Solar Billing Plan.” ... Pursuant to D.14-03-041 , customer-generators are allowed to remain on the NEM 2.0 tariff for …
Checked November 16, 2026. cpuc.ca.gov - SMUD Rate Schedule SSR – Solar and Storage Rate, Sheets SSR-1 to SSR-3; Resolution No. 21-09-07 (Sept 16, 2021) as amended by Resolution No. 26-04-04 (April 16, 2026); effective June 1, 2026.
This Rate Schedule SSR applies to residential, commercial/industrial, and agricultural customers who establish service at a premises that has an electrical generation facility that is fueled by a renewable fuel source on or after March 1, 2022 … The Export Compensation Rate effective June 1, 2026 …
Checked November 16, 2026. smud.org - PSCo Colo. PUC No. 8 Electric tariff – Net Metering Service, Schedule NM (in "Entire Tariff" PDF), Sheets 112, 112B, 112C – Advice Letter 1760, issued Feb 7, 2018, effective Mar 10, 2018.
that is no larger than one hundred and twenty percent (120%) of the average annual consumption of electricity by the Customer at that site, and that has a rated capacity that does not exceed the Customers service entrance capacity. … Inside of a billing period, excess On Peak energy may be utilized …
Checked November 16, 2026. xcelenergy.com - 4 CCR 723-3-3664 Net Metering (Colorado PUC electric rules; text via Cornell LII mirror of the Code of Colorado Regulations). Effective: rule notes list amendments effective 9/30/2015 onward.
(I) the retail renewable distributed generation shall be sized to supply no more than 120 percent of the customer's average annual electricity consumption at that site ... (b) ... the excess kWh shall be carried forward from month to month and credited at a ratio of 1:1 against the customer's …
Checked November 16, 2026. law.cornell.edu - Eversource – Residential Renewable Energy Solutions (Connecticut) program page, Eversource web page, checked 2026-11-16 (rates approved by PURA).
You'll be able to select from two incentive compensation options: Buy-all and Netting. … The Buy-All rate for approved applications submitting in 2025 is $0.3195 per kWh, and the Buy-All rate for approved applications submitting in 2026 is $0.3289 per kWh. This rate includes the REC value. Once …
Checked November 16, 2026. eversource.com - DC Municipal Regulations, Title 15, Chapter 9: Net Energy Metering (compiled, updated 4-7-25), DC PSC, 15 DCMR §§ 902–903 (compiled April 7, 2025).
Net energy billing applies only to kilowatt-hour usage charges. Net energy billing customers are responsible for all other charges applicable to the customer’s rate class and recovered through fixed amounts or over units other than kilowatt-hours … At the end of the calendar year (December), excess …
Checked November 16, 2026. dcpsc.org - Rule 25-6.065, F.A.C. (Florida PSC), text from flrules.org rule document.
(e) During any billing cycle, excess customer-owned renewable generation delivered to the investor-owned utility’s electric grid shall be credited to the customer’s [next] billing cycle. (f) Energy credits produced pursuant to paragraph (8)(e) shall accumulate and be used to offset the customer’s …
Checked November 16, 2026. flrules.org - Duke Energy Florida, Rate Schedule RS-1, Sheet Nos. 6.120-6.121, Sheet No. 6.120 effective October 1, 2026; Sheet No. 6.121 effective January 1, 2022.
EFFECTIVE: October 1, 2026 ... Customer Charge: $ 14.43 ... The Minimum Monthly Bill shall be $30.
Checked November 16, 2026. duke-energy.com - FPL Electric Tariff Section 10 – Eighteenth Revised Sheet No. 10.010 "Contract Provisions – Various" (Net Metering of Customer-Owned Renewable Generation), Sheet No. 10.010, effective January 1, 2026.
For Customers with renewable generation equipment up to a maximum of 2 MW that have executed an Interconnection Agreement for Customer-Owned Renewable Generation with the Company, the following billing parameters will apply. … If any excess customer-owned renewable generation is delivered to the …
Checked November 16, 2026. fpl.com - FPL Electric Tariff Section 8 – Sixty-Third Revised Sheet No. 8.201, Rate Schedule RS-1, Sheet No. 8.201, effective January 1, 2026.
MONTHLY RATE: Base Charge: $10.52 ... Minimum: $30.00
Checked November 16, 2026. fpl.com - Hawaiian Electric Rule No. 32 – Smart Renewable Energy Program, Revised Sheets 49.40-A/B, effective Feb 1, 2025; Docket No. 2019-0323, Order No. 41153 (Oct 31, 2024); Transmittal Letter Nov 8, 2024.
The Smart Renewable Energy Program (also known as the Smart DER Program), is available to customers of Hawaiian Electric Company, Inc. ("Company") who meet the ... Effective February 1, 2025, new Smart Renewable Energy Program Eligible Customer-Generators will be served on the Eligible …
Checked November 16, 2026. hawaiianelectric.com - Hawaiian Electric – Smart Renewable Energy Export program page, Hawaiian Electric web page, checked 2026-11-16.
Smart Renewable Energy (SRE) - Export rates for 2024-2026 Island Overnight (9pm - 9am) Daytime (9am - 5pm) Evening Peak (5pm - 9pm) Oahu 18.9 cents/kWh* 13.5 cents/kWh* 32.9 cents/kWh* Maui 13.1 cents/kWh* 6.6 cents/kWh* 18.2 cents/kWh* … Export credits will be trued-up on an annual basis and any …
Checked November 16, 2026. hawaiianelectric.com - Idaho PUC Final Order No. 36785, Case No. IPC-E-25-15 (service date Sept 30, 2025), Order No. 36785; builds on Order No. 36048 (Case IPC-E-23-14).
The Company stated the Order approved changes to its on-site generation service offerings including implementing, effective January 1, 2024, a seasonal and time-variant ECR with avoided cost-based value considerations for excess energy exported to the C[ompany] … an ECR update where the change in …
Checked November 16, 2026. puc.idaho.gov - Idaho Power, "Important Reminder For Your Renewable Energy System 2026" (customer generation brochure, 31180-I-0391), Idaho Power brochure (2026).
Export Credit Rate Summer On-Peak ..... 15.6836 per kilowatt-hour (kWh) Off-Peak ..... 3.3920 per kWh Non-Summer On-Peak ..... N/A Off-Peak ..... 2.9019 per kWh ... These rates are effective as of Oct. 1, 2025. … A Net Billing customer shall receive a credit for Exported Energy at the applicable …
Checked November 16, 2026. docs.idahopower.com - ComEd, "2025 Changes to Net Metering" (062024), ComEd customer document, 2024; implements CEJA (P.A. 102-0662).
Full retail rate net metering will no longer be available to customers interconnecting renewable energy systems after December 31, 2024. Customers receiving permission to operate after such date will be eligible to receive only energy supply credits for their excess energy sent back to the grid. … …
Checked November 16, 2026. azure-na-assets.contentstack.com - ComEd Green Power Connection – Net Metering FAQ (2026, doc 20099-1, 0616A), ComEd FAQ, June 2026.
Customers purchasing energy from ComEd at hourly prices receive net metering credits based on the price of power during the hours excess energy is produced and are reflected as a monetary credit on their energy bill. … Net metering credits, whether kWh or monetary, do not expire for customers who …
Checked November 16, 2026. comed.com - IURC Technical Conference handout reproducing IC 8-1-40 (P.L. 264-2017) (2017-07-20). Effective: P.L. 264-2017; EDG from 2022-07-01 at latest.
equals the product of: (1) the average marginal price of electricity paid by the electricity supplier during the most recent calendar year; multiplied by (2) one and twenty-five hundredths (1.25). ... IC 8-1-40-18 ... Any excess credit shall be carried forward and applied against fu[ture charges] …
Checked November 16, 2026. secure.in.gov - Kentucky PSC Order, Case No. 2023-00413 (Duke Energy Kentucky), 2024-10-11. Effective: SB 100 (2019); order 2024-10-11.
Pursuant to KRS 278.466(3), customers taking service under Rider NM -2 will be compensated for electricity fed into the grid over a billing period at a rate set by the Commission using ratemaking processes ... KRS 278.466(4) provides that compensation: [S]hall be in the form of a dollar-denominated …
Checked November 16, 2026. psc.ky.gov - Duke Energy Kentucky, KY P.S.C. Electric No. 2, First Revised Sheet No. 84, Rider NM II (Net Metering II Rider), issued and effective July 10, 2026; Kentucky PSC Order of June 1, 2026, Case No. 2025-00258.
Issued by authority of an Order of the Kentucky Public Service Commission dated June 1, 2026 in Case No. 2025-00258. ... Effective: July 10, 2026 ... Energy $0.056893 ... TOTAL $0.074805 … The dollar-denominated bill credit will be applied only to per kWh charges of the customer's electric bill. …
Checked November 16, 2026. psc.ky.gov - Md. Code Ann., Public Utilities § 7-306 (Maryland General Assembly statute text), PUA § 7-306 (current text as served 2026-11-16).
make it available to eligible customer–generators on a first–come, first–served basis until the earlier of: (i) the date on which the rated generating capacity owned and operated by eligible customer–generators in the State reaches 3,000 megawatts; or (ii) July 1, 2027. … “Net excess generation” …
Checked November 16, 2026. mgaleg.maryland.gov - NSTAR Electric Company d/b/a Eversource Energy – Net Metering, M.D.P.U. No. 68N (cancels 68M), M.D.P.U. No. 68N, filed Oct 31, 2025, effective January 1, 2026.
Nameplate Cap Exempt Facility means a Class I Net Metering Facility that is an eligible Renewable Energy Generating Facility pursuant to M.G.L. c. 164, § 138 … a. the basic service charge (in the ISO-NE load zone where the Host Customer is located); b. the distribution charge; c. the transmission …
Checked November 16, 2026. eversource.com - Massachusetts Electric Co./Nantucket Electric Co. – Net Metering Provision, M.D.P.U. No. 1625 (cancels No. 1598), M.D.P.U. No. 1625, issued Jan 15, 2026, effective March 1, 2026; D.P.U. 23-140-B (cap-exempt transition).
Nameplate Cap Exempt Facility means a Class I Net Metering Facility that is an eligible Renewable Energy Generating Facility pursuant to M.G.L. c. 164 § 138 ... and has a nameplate capacity rating equal to or less than 25 kilowatts AC. … The Standard Net Metering Credit shall be calculated for each …
Checked November 16, 2026. nationalgridus.com - Xcel Energy (NSP-Minnesota) Minnesota Electric Rate Book – MPUC No. 2, Section 9, Rate Code A50, 28th Revised Sheet No. 9-2, Sheet 9-2, filed 07-17-20, effective 12-24-20, Docket No. E002/M-20-606 (Order 11-24-20).
Available to any qualifying facility (QF) of less than 40 kW AC capacity who receives non-time of day retail electric service from Company and offsets energy delivered by Company. The A50 Rate Code applies to the extent the energy delivered by the customer exceeds that supplied by the Company …
Checked November 16, 2026. xcelenergy.com - Minn. Stat. §216B.164.
A cooperative electric association or municipal utility may charge an additional fee to recover the fixed costs not already paid for by the customer through the customer's existing billing arrangement. ... a qualifying facility having less than 40-kilowatt capacity may elect that the compensation …
Checked November 16, 2026. revisor.mn.gov - NV Energy (Nevada Power) – Electric Rate Schedules for Residential and General Service Customer Generation, effective July 1, 2026 (bill insert np_netmetering_rates-7_1_30), PUCN-authorized rates effective 2026-07-01.
The Public Utilities Commission of Nevada has authorized changes to Nevada Power Company d/b/a NV Energy rates effective July 1, 2026. … Basic Service Charge, per month ........... $ 18.00 Electric Consumption (BTGR + BTER) ... All kWh, per kWh ....................... $ 0.11622 ... NMR-405 (Tier 1) …
Checked November 16, 2026. nvenergy.com - Eversource (Public Service Company of New Hampshire) NHPUC No. 10, Terms and Conditions, Net Metering, 1st Revised Pages 24A-24C, issued November 27, 2024, effective January 1, 2025; authorized by NHPUC Order No. 27,074.
Customers receiving a net metering capacity allocation while this Alternative Net Metering Tariff is in effect will be entitled to the net metering design and structure then in effect through December 31, 2040. … If such net energy usage is less than zero, customers that receive Default Energy …
Checked November 16, 2026. puc.nh.gov - PSE&G Tariff for Electric Service, B.P.U.N.J. No. 17 Electric, Standard Terms and Conditions Section 15, Net Metering Installations (Original Sheet Nos. 38-40), sheets effective October 15, 2024; tariff compilation effective October 1, 2026.
the Qualified Customer-Generator shall be credited for the excess kilowatt-hours to the next billing period. At the end of the annualized period the Qualified Customer-Generator will be compensated for any remaining credits by the Qualified Customer-Generator's electric supplier or basic generation …
Checked November 16, 2026. nj.pseg.com - NJ BPU Order, Novitium Energy / Edgewater Borough remote net metering, BPU Docket No. QO22100635 (Agenda 11/9/22, Item 8D), cites N.J.A.C. 14:8-4.2 and 14:8-4.3(e).
Consistent with current net metering practice and N.J.A.C. 14:8-4.3(e), any individual receiving account holding credits at the end of an annualized period shall be trued up at the avoided cost of wholesale power as defined at N.J.A.C. 14:8-4.2.
Checked November 16, 2026. nj.gov - NJ BPU, N.J.A.C. 14:8 readoption proposal (courtesy copy, April 21, 2011) — definition of "annualized period", N.J.A.C. 14:8-4.2, 14:8-4.3 (proposal text; current codified text not checked).
"Annualized period" means a period of 12 consecutive monthly billing periods.
Checked November 16, 2026. nj.gov - NJ BPU, Net metering technical conference slides, Docket QO24090723 (2025-02-10). Effective: 2025-02-10.
the board may authorize an electric power supplier or basic generation service provider to cease offering net metering to customers that are not already net metered whenever the total rated generating capacity owned and operated by net metering customer -generators Statewide equals 5.8 percent of …
Checked November 16, 2026. nj.gov - NYSERDA, "Value of Distributed Energy Resources – Phase 1 Order: Highlights for Mass Market and Residential", NY PSC VDER Phase One Order, Case 15-E-0751 (March 9, 2017).
Phase One NEM is similar to NEM compensation except: − Phase One NEM projects are subject to a 20-year term − Credits will carry over from month to month and year to year − After a 20-year peri[od] ...
Checked November 16, 2026. nyserda.ny.gov - NYSERDA, VDER Frequently Asked Questions, NYSERDA FAQ.
VDER Phase One does not permit the payout of credits at any time including at the end of a project’s annual period. Annual carryover of credits under VDER Phase One is permitted until the end of the project’s Phase One compensation term of 20 years for Phase One NEM and 25 years for Phase One Value Stack.
Checked November 16, 2026. nyserda.ny.gov - NYSERDA NY-Sun, "2026 Utility Published Customer Benefit Contribution Rates" (SUN-RSC-cbc-fs-1-v8, 4/26), NY PSC Order Addressing Customer Benefit Contribution Charges (Case 15-E-0751); utility statements filed with DPS.
Utility 2026 Final Residential CBC Rate $/kW-mo. ... Central Hudson $1.67 ... Con Edison $1.29 ... LIPA $1.13 ... National Grid $0.97 ... NYSEG $1.19 ... Orange & Rockland $1.00 ... RG&E $1.31 … Residential and small commercial customers who interconnect solar PV at their site on or after January …
Checked November 16, 2026. nyserda.ny.gov - LIPA Tariff for Electric Service (June 2026 compiled PDF), Net Metering, Section I.C.15.h — Leaf 34F-1 (Sixth Revised, eff. June 1, 2024) and Leaf 34F-2 (Third Revised, eff. April 1, 2023).
For Mass Market Projects and Commercial Demand NEM Projects served under a rate code with multiple rate periods, peak and off-peak periods will be treated separately when calculating and applying any credits. … In the event that the amount of electricity provided to the Authority by an eligible …
Checked November 16, 2026. lipower.org - LIPA Statement No. 5 – Customer Benefit Contribution (CBC) Charge, Statement No. 5, effective January 1, 2026.
Daily Customer Benefit Contribution Rate ($/kW DC installed capacity) ... Residential $0.0372
Checked November 16, 2026. lipower.org - NC Public Staff – Net Metering (summary of NCUC Order Approving Revised Net Metering Tariffs, Docket E-100, Sub 180, March 23, 2023, and Order Granting Extension of Time, May 17, 2023), NCUC Docket No. E-100, Sub 180.
The current residential net metering rider (Rider NM) is closed to new customers as of September 30, 2023. The revised Net Metering riders (Residential Solar Choice (Rider RSC) and Net Metering Bridge (Rider NMB)) are effective October 1, 2023 for residential customers. … the excess energy you …
Checked November 16, 2026. publicstaff.nc.gov - Duke Energy Carolinas, Residential Solar Choice Rider RSC, NC Third Revised Leaf No. 141, effective January 1, 2025; NCUC Docket No. E-100, Sub 180.
Net Excess Energy Credit per month, per kWh 4.53¢ ... Effective for service rendered on and after January 1, 2025 ... Net Excess Energy Credit per month, per kWh 3.94¢ ... Effective for service rendered on and after April 1, 2026 … There shall be a monthly minimum bill of $22 specific to the …
Checked November 16, 2026. duke-energy.com - Duke Energy Progress, Residential Solar Choice Rider RSC, NC Fourth Revised Leaf No. 670, effective April 1, 2026; NCUC Docket No. E-2, Sub 1396, Order dated March 16, 2026.
Net Excess Energy Credit per month, per kWh 4.53¢ ... Effective for service rendered on and after January 1, 2025 ... Net Excess Energy Credit per month, per kWh 3.94¢ ... Effective for service rendered on and after April 1, 2026 … There shall be a monthly minimum bill of $22 specific to the …
Checked November 16, 2026. duke-energy.com - Pacific Power Oregon Schedule 135 – Net Metering Service Optional for Qualifying Customers, P.U.C. OR No. 36, Second Revision of Sheet 135-1 (Advice 25-013, effective Aug 1, 2025); Sheet 135-3 (Advice 11-015, effective Nov 1, 2011).
with a capacity of not more than twenty-five (25) kilowatts for residential customers and two (2) megawatts for non-residential customers that is located on the Customers’ premises … shall be credited for such Net Metering Energy with a cumulative kilowatt-hour credit to be applied at the full …
Checked November 16, 2026. pacificpower.net - ORS 757.300 Requirement to provide net metering (text via oregon.public.law).
An electric utility may value the excess kilowatt-hours at the avoided cost of the utility ... (d) For the billing cycle ending in March of each year ... any remaining unused kilowatt-hour credit accumulated during the previous year shall be granted to the electric utility for distribution to …
Checked November 16, 2026. oregon.public.law - S.C. Code §58-40-20 Net energy metering; solar choice metering. Effective: 2019-05-16; amended 2025-05-12.
(B) An electrical utility shall make net energy metering available to all customer-generators who apply before June 1, 2021, according to the terms and conditions provided to all parties in Commission Order No. 2015-194. Customer-generators who apply for net metering after the effective date of …
Checked November 16, 2026. scstatehouse.gov - Duke Energy Carolinas (South Carolina), Service Regulations, SC Original Leaf No. 401, effective August 1, 2024; PSCSC Docket No. 2023-388-E, Order No. 2024-445.
Net metering is available under Riders RNM, IRSC, RSC and NSC for installed customer generation systems and equipment that comply with the provisions outlined in the South Carolina Standard for Interconnecting Small Generation 100 kW or Less ... Effective August 1, 2024
Checked November 16, 2026. duke-energy.com - Rocky Mountain Power Utah Electric Service Schedule No. 137 – Net Billing Service, P.S.C.U. No. 52; Sheet 137.1 & 137.4 (Docket 24-035-04, eff. Apr 25, 2025); First Revision Sheet 137.3 (Docket 26-035-T03, filed Jan 26, 2026, eff. Mar 1, 2026).
with a capacity of not more than twenty-five (25) kilowatts for a residential facility or two (2) megawatts for a non-residential facility … Billing Months – June through September inclusive 4.855¢ per kWh for all exported kWh Billing Months – October through May inclusive 4.033¢ per kWh for all …
Checked November 16, 2026. rockymountainpower.net - Va. Code §56-594 Net energy metering provisions (both versions: until and from Jan 1, 2027).
(i) has a capacity of not more than 25 kilowatts for residential customers and not more than three megawatts for nonresidential customers ... "Net metering period" means the 12-month period following the date of final interconnection ... until the rated generating capacity ... reaches six percent, …
Checked November 16, 2026. law.lis.virginia.gov - Virginia SCC, Order on Clarification, Case No. PUR-2025-00079 (May 20, 2026), Doc. Con. Cen. No. 260550045 (copy hosted by Piedmont Environmental Council), SCC Case PUR-2025-00079; Final Order April 30, 2026; Order on Clarification May 20, 2026.
With respect to Dominion’s NEM 2.0 tariff, the April 30 Final Order did the following, among other things: (i) it maintained the existing energy-based accounting for netting imported and exported electricity over the net metering period; (ii) it set the export credit rate paid to …
Checked November 16, 2026. pecva.org - Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, net metering 2010–2025, Net_Metering sheets of the annual files, released October 7, 2026. eia.gov
- 26 U.S.C. §25D, Residential clean energy credit, Text current through Public Law 119-142 (November 10, 2026).
in the case of property placed in service after December 31, 2021, 30 percent … The credit allowed under this section shall not apply with respect to any expenditures made after December 31, 2025. … an expenditure with respect to an item shall be treated as made when the original installation of …
Checked November 16, 2026. uscode.house.gov - Public Law 119-21 (July 4, 2025), sections 70506 and 70513, 139 Stat. 72.
Section 25D(h) is amended by striking ``to property placed in service after December 31, 2034'' and inserting ``with respect to any expenditures made after December 31, 2025'' … shall apply to facilities the construction of which begins after the date which is 12 months after the date of enactment of this Act
Checked November 16, 2026. govinfo.gov - 26 U.S.C. §48E, Clean electricity investment credit, Text current through Public Law 119-142 (November 10, 2026).
with a maximum net output of less than 1 megawatt (as measured in alternating current) … This section shall not apply to any qualified property placed in service by the taxpayer after December 31, 2027, which is part of an applicable facility. … This paragraph shall not apply with respect to any …
Checked November 16, 2026. uscode.house.gov
Rules are quoted from the official text and dated; how we check them: methodology. Not legal or tax advice. Found an error? Write to [email protected]; corrections are listed on the updates page.