Menu

Arizona solar export rates: set by your utility and the year you applied

Published November 16, 2026. Rules checked November 16, 2026.

Net billingACC-approved RCP riders (APS Rider RCP, TEP Rider R-14) · Reset each year (APS September 1, TEP October 1)

Resource Comparison Proxy (RCP) export rate. Exports credited at a fixed RCP rate that is reset once a year, may not fall more than 10% a year and is kept for 10 years.2345 Credits roll forward; APS pays balances over $25 after December, TEP balances over $10 each October. EIA counted 334,117 homes on net metering in Arizona at the end of 2025.1

Rules checked November 16, 2026 against the official text; EIA-861 2025 final data, released October 7, 2026.

West region, Mountain division

Arizona's largest utilities no longer net meter new rooftop solar. APS and TEP credit each exported kilowatt-hour at a Resource Comparison Proxy (RCP) export rate that is reset every year and then locked for 10 years for the customers who applied that year, so two neighbors can earn different credits for the same kilowatt-hour.23 SRP sets its own, lower export rate each May.11

The RCP: an export rate, not net metering

The Resource Comparison Proxy is a net billing rider. APS describes its version as a rider that "measures the excess power you don't use and gives you a monthly bill credit based on the current RCP purchase rate".326 Net billing means each exported kilowatt-hour earns a separate export rate instead of cancelling a kilowatt-hour bought from the grid.

APS meters export energy "on an instantaneous basis" and gives a monthly bill credit at the rate in its schedule.4 TEP's Rider R-14 uses the same words for export power.5 Nothing is netted over the hour, the day or the month. Solar output used inside the home as it is produced simply reduces what the meter records as purchased; only the surplus that flows out at that moment earns the RCP rate.

Net metering rules in Arizona at a glance
RuleWhat applies
Program typeNet billing Exports are credited at a separate export rate, usually below the retail rate, with little or no netting.
ProgramResource Comparison Proxy (RCP) export rate
How exports are creditedExports credited at a fixed RCP rate that is reset once a year, may not fall more than 10% a year and is kept for 10 years2345
Netting intervalNone (exports metered instantaneously)
Unused creditsCredits roll forward; APS pays balances over $25 after December, TEP balances over $10 each October
InstrumentACC-approved RCP riders (APS Rider RCP, TEP Rider R-14)
In effectReset each year (APS September 1, TEP October 1)
CheckedNovember 16, 2026

The rate is reset once a year to reflect market prices for solar power, and the rules approved by the Arizona Corporation Commission do not allow it to fall more than 10 percent annually. A customer keeps, for up to 10 years, the RCP rate in place when they requested interconnection.23

Your application year sets your rate

Because each year's customers lock in that year's rate, Arizona's export credit is really a ladder of rates. These are the published tranches; a household's rate is the one in force when its interconnection application went in, not the one in force today.47

Tranche yearAPS tranche rate (per kWh)4TEP RCP rate (per kWh)7
2017$0.12900–
2018$0.11610$0.0964 (from September 21, 2018)
2019$0.10450$0.0868 (from October 1, 2019)
2020$0.10450$0.0868 (from October 1, 2020)
2021$0.09405$0.0781 (from October 1, 2021)
2022$0.08465$0.0703 (from October 1, 2022)
2023$0.07619$0.0633 (from October 1, 2023)
2024$0.06857$0.0570 (from October 1, 2024)
2025$0.06171$0.0513 (from October 1, 2025)
2026$0.05554 (September 1, 2026 through August 31, 2027)$0.0462 (from October 1, 2026)

Since 2021 both utilities have cut the rate by about the full 10% allowed in each annual step, so a 2026 APS applicant locks in less than half of what a 2017 applicant did. The new rates take effect on different dates: September 1 at APS and October 1 at TEP.47

The lock has conditions at APS. The rate in effect when the application is submitted holds only if installation and approval by the local permitting authority follow within 180 days, or 270 days when a third party or APS causes the delay. Adding capacity later can cost the lock: a "material increase in capacity means increasing the capacity by 10% or 1 kW-ac, whichever is greater", and it resets the locked rate. After 10 years from interconnection the customer's rate floats with the current annual RCP rate.48

A worked example at APS and at SRP

The gap between the export rate and the price of grid power drives a solar bill here. Against an average residential price of 15.39¢ per kWh9 in Arizona over the 12 months to August 2026, fixed charges included, the RCP credit is a fraction of what a purchased kilowatt-hour costs. The 2026 APS tranche credits $0.05554 per exported kWh.4

The two examples below run one illustrative household, with the inputs printed on each figure, through two tariffs. They use the same code as our export credit calculator, where you can enter your own numbers.

Worked example: APS (Arizona): RCP, 2026 tranche

Inputs: 1,100 kWh a month of use; 11,000 kWh a year of solar output spread over the months as PVWatts models for Arizona; 40% of output used at home as it is produced; energy price 15.39¢ per kWh (the Arizona average residential price over the 12 months to August 2026, which includes fixed charges).

Solar production in a year11,000 kWh
Used at home as it is produced4,400 kWh
Sent to the grid (exports)6,600 kWh
Bought from the grid (imports)8,800 kWh
Value of solar used at home, at your energy price$677
Value of exports under this tariff$367
Average credit per exported kWh5.554¢
Energy charges for a year without solar$2,031
Energy charges for a year with solar, before fixed charges$988

Source: National Laboratory of the Rockies (formerly NREL), PVWatts v8 model estimates; Energy Information Administration, Electricity retail sales, residential average price. Export treatment from the tariff cited in the text. An illustration of the crediting rule, not a quote or a savings estimate: fixed charges, minimum bills, taxes and time-of-use prices are not modelled. Try your own numbers in the export credit calculator.

SRP's export rate is $0.0187 per kWh as of the May 2026 billing cycle,11 so the same exports earn far less there.

Worked example: SRP (Arizona): export-rate plans from May 2026

Inputs: 1,100 kWh a month of use; 11,000 kWh a year of solar output spread over the months as PVWatts models for Arizona; 40% of output used at home as it is produced; energy price 15.39¢ per kWh (the Arizona average residential price over the 12 months to August 2026, which includes fixed charges).

Solar production in a year11,000 kWh
Used at home as it is produced4,400 kWh
Sent to the grid (exports)6,600 kWh
Bought from the grid (imports)8,800 kWh
Value of solar used at home, at your energy price$677
Value of exports under this tariff$123
Average credit per exported kWh1.87¢
Energy charges for a year without solar$2,031
Energy charges for a year with solar, before fixed charges$1,231

Source: National Laboratory of the Rockies (formerly NREL), PVWatts v8 model estimates; Energy Information Administration, Electricity retail sales, residential average price. Export treatment from the tariff cited in the text. An illustration of the crediting rule, not a quote or a savings estimate: fixed charges, minimum bills, taxes and time-of-use prices are not modelled. Try your own numbers in the export credit calculator.

Under both rate designs, a kilowatt-hour used at home is worth the retail price it avoids, and an exported one is worth the export rate. That is why evening use matters in Arizona: shifting laundry, dishwashing, pool pumps or car charging into sunny hours raises the share used on site, and a battery can move midday output to the evening. Utilities reported 17,7471 Arizona homes with a battery paired with net-metered solar at the end of 2025.

Leftover credits: a December check at APS, an October one at TEP

RCP credits are dollars. At APS they apply to that month's bill, and any remainder rolls to the next bill.3 After the December bill, if the remaining export credits exceed $25, APS issues a check automatically; a smaller balance carries forward to the following year.4

TEP settles on a different calendar. Each year, on the bills produced in October for September usage, TEP pays any remaining balance of RCP export credits above $10.00.5

Arizona and federal solar tax credits

Arizona's own credit remains in the statutes. Under A.R.S. §43-1083 the credit "is equal to twenty-five percent of the cost of the device", and "the maximum credit in a taxable year may not exceed one thousand dollars".12 The statute text is on the Arizona Legislature's site.

State solar incentives confirmed on official pages
StateProgram
ArizonaArizona residential solar energy credit (A.R.S. §43-1083)12

Programs open, close and change budgets often: check the linked official page before relying on one.

The federal residential clean energy credit (§25D) does not apply to expenditures made after December 31, 2025, and an expenditure counts as made when the original installation is completed, so a system finished in 2026 earns no federal homeowner credit even if it was paid for in 2025.14 A 2025 installation whose credit exceeded that year's tax can carry the unused amount to the next tax year.13

For leased systems and PPAs the system owner, not the household, may claim the §48E investment credit; a lessee claims no federal credit, and whether any of the owner's credit reaches the monthly payment depends on the contract. For solar, §48E does not apply to property placed in service after December 31, 2027 when construction begins after July 4, 2026.1516 With about a third of Arizona's home systems third-party owned, the federal guide to leases and PPAs is the next stop for a leased or PPA home; owners of systems finished in 2025 should see claiming a 2025 installation.

Who kept net metering

The 2017 change did not move existing solar homes. APS tells legacy customers that their "current solar buyback rate lasts 20 years from the date your system was connected".6 Its frozen Rider EPR-6 lets a residential customer stay for up to 20 years from interconnection.48

Legacy EPR-6 is kilowatt-hour net metering with a year-end settlement: exports are netted against kilowatt-hours used within the month and banked to later bills, and after the December billing cycle any export energy not yet netted is bought for a monetary bill credit at $0.02895 per kWh.8 At TEP the grandfathered net metering rider is Rider-4, and the RCP rider "may not be used in conjunction with" it.5

SRP plays by its own price plans

SRP's solar rules are not the RCP. It offers "demand- and export-based plans" for homes with rooftop solar and batteries, with options to move from a fixed export price to market-based pricing and a pathway to a capacity credit.17

On SRP's export-rate plans, use and exports are measured instantaneously. The Customer Generation and Average Demand plans work differently: there the excess kWh is subtracted from the delivered kWh to arrive at a net figure, which SRP itself calls net metering. SRP also bills a Monthly Service Charge by home type: likely $20 for an apartment, condominium or townhome and $30 for an average single-family home.11

Charges and size limits for solar customers

The solar-specific grid access charge approved for APS residential solar customers did not survive in court. In June 2026 the Arizona Court of Appeals vacated the Commission's December 2024 Rehearing Decision and the underlying charges and remanded them to the Commission for further proceedings, as the Arizona Attorney General announced.18

TEP assesses new residential solar customers an incremental monthly charge that reflects part of the higher cost of the bidirectional meter they need. TEP's rider covers systems with a generating capacity of no more than 125% of the customer's total connected load.5 APS's rider requires solar generation on site, behind the billing meter, serving the home's load, under the Arizona Administrative Code's distributed generation interconnection rules.43

What changed and when
DateWhereWhat changed
May 2026ArizonaSRP resets its solar export rate. SRP’s export rate became $0.0187/kWh from the May 2026 billing cycle.11
June 2026ArizonaCourt of Appeals vacates APS’s solar grid access charge. The Arizona Court of Appeals vacated the charge for APS residential solar customers and remanded it to the Corporation Commission.18
September 1, 2026ArizonaAPS sets its 2026 RCP export rate. The RCP export rate for the 2026 tranche is $0.05554/kWh, locked for 10 years.4
October 1, 2026ArizonaTEP sets its 2026 RCP export rate. TEP’s RCP export rate for new applications became $0.0462/kWh.7

Who is covered

The RCP riders are tariffs of the investor-owned utilities regulated by the Corporation Commission: APS's RCP Export Rider and TEP's Rider R-14.326 Arizona Public Service Co alone holds 57% of Arizona's residential net-metered installations. 141 Arizona utilities reported at least one to EIA, including UNS Electric, several co-operatives, Electrical District No. 3 of Pinal County and the City of Mesa; their customers should read their own utility's solar tariff.

Utilities with the most net-metered homes in Arizona, 2025
Arizona Public Service Co190,48157.0%1726.28,770
Salt River Project63,43719.0%435.45,912
Tucson Electric Power Co54,71916.4%379.92,478
UNS Electric, Inc11,4323.4%91.6549
Trico Electric Cooperative Inc5,9931.8%47.60
Electrical Dist No3 Pinal County3,7131.1%27.30
Mohave Electric Cooperative, Inc.2,3570.7%26.20
Sulphur Springs Valley E C Inc1,1740.4%8.60
Navopache Electric Coop, Inc5670.2%4.40
City of Mesa - (AZ)1840.1%1.134

Source: Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data. Largest 10 of 14 utilities reporting residential net metering.

Utility pages: APS, TEP and SRP.

Arizona solar in numbers

Arizona has 339,582 net-metering customers, 2nd highest of any state, up 82% from 186,99919 in 2020. Measured per household, Arizona solar is even more widespread: roughly 10.4 net-metered systems for every 100 residential electric accounts in 2025, 4th highest1 in the country.

Residential net-metering installations per 100 homes, 2025 (estimate): top 12

Source: Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data. Residential installations divided by residential accounts: two different counts, an indicative estimate. Bar colour: program type.

Show the numbers
StateResidential net-metering installations per 100 homes, 2025 (estimate)
Hawaii23.2
California15.7
Nevada10.7
Arizona10.4
District of Columbia10.2
Connecticut7.6
Colorado7.5
Massachusetts7.2
New Mexico6.9
Utah6.6
New Jersey5.8
Maryland5.2
Rhode Island4.3
New Hampshire3.8
New York3.4
Delaware3.3
Oregon3.3
Illinois3.2
Vermont3.1
Florida3.0
Idaho2.7
Maine2.6
Montana2.3
Virginia2.0
Washington2.0
Pennsylvania1.7
Louisiana1.7
South Carolina1.6
Iowa1.5
Arkansas1.3
Wyoming1.3
North Carolina1.3
Missouri1.1
Oklahoma1.1
Texas1.1
Minnesota1.1
Alaska1.0
Kansas0.8
Wisconsin0.8
Michigan0.7
Ohio0.7
West Virginia0.6
Kentucky0.5
Georgia0.5
Nebraska0.5
Indiana0.4
Mississippi0.1
South Dakota0.1
North Dakota0.1
Alabama0.0
Tennessee0.0

Arizona sunshine makes each panel productive: NLR's PVWatts model puts a typical system at the state's population center at 1,750 kWh10 a year per kilowatt of panels, and EIA estimates small-scale solar in Arizona generated 5.80 billion kWh in 2025, 2nd highest20 in the country. Berkeley Lab's median installed price for host-owned home systems installed in 2025 was $3.1 per watt in Arizona, against $3.6 per watt21 nationally.

Leasing and power purchase agreements are common: third-party owners reported 103,451 Arizona homes, about 31%1 of residential net-metered solar.

Solar and net metering in Arizona: the numbers
MeasureArizonaUnited States
Net-metering customers (2025)1339,5825,904,992
of which residential1334,1175,637,805
Net-metered capacity (2025)13,152 MW62,588 MW
Customers in 202019186,9992,801,727
Homes with a battery paired with solar (2025)117,747431,825
Residential solar reported by third-party owners (2025)1103,4511,375,479
Small-scale solar generation (2025, million kWh)205,79793,041
Average residential price, 12 months to August 2026915.39¢–
Modeled output per kW of panels (PVWatts)101,750 kWh a year–
Median installed price, 2025 home systems21$3.1/W$3.6/W

Questions and answers

Does Arizona have net metering?

Not for new customers of APS or TEP. Their RCP riders meter exports instantaneously and credit them at a fixed export rate.5 APS customers who were already net metered keep it for up to 20 years from the date their system was interconnected.48

How much does APS pay for solar in 2026?

Customers in the 2026 tranche, from September 1, 2026 through August 31, 2027, receive $0.05554 per kWh in bill credits, kept for 10 years from interconnection.8 Credits over $25 left after the December bill are paid by check.4

What is the Arizona solar tax credit?

Arizona's income tax credit for solar energy devices equals 25% of the cost of the device, and the maximum credit in a taxable year may not exceed $1,000.12

Is there still a federal solar tax credit for Arizona homeowners?

Not for new purchases. The federal residential clean energy credit does not apply to expenditures made after December 31, 2025, and an expenditure is made when installation is completed.13

What is SRP's solar export rate?

As of the May 2026 billing cycle, SRP's export rate is $0.0187 per kWh; it is recalculated each May.11

Related to Arizona

Sources

  1. Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data, Net_Metering_2025.xlsx (f8612025.zip), released October 7, 2026. eia.gov
  2. Tucson Electric Power, Resource Comparison Proxy Export Rate. Effective: 2026-10-01. customers are compensated for up to 10 years at the RCP export rate in place at the time they requested interconnection of a new solar power system. ... An energy export rate of $0.0462 per kWh will remain in effect from October 1, 2026 through September 30, 2027. ... Rules approved by the ACC call … Checked November 16, 2026. tep.com
  3. APS, Renewable Energy Riders (RCP Export Rider, EPR-6, Legacy EPR-6). aps Resource Comparison Proxy (RCP) is a net billing solar purchase energy rider, it measures the excess power you don't use and gives you a monthly bill credit based on the current RCP purchase rate. The credit will apply towards your APS billed amount for that month, and any remaining credit will … Checked November 16, 2026. aps.com
  4. APS Rate Rider RCP – Partial Requirements Service for New On-Site Solar DG, Resource Comparison Proxy Export Rate, A.C.C. No. 6248, Revision No. 11, effective September 1, 2026 in ACC Decision No. 82122. The Company will meter this Export Energy on an instantaneous basis and provide a monthly bill credit based on the purchase rate in this schedule. … Tranche 2025 September 1, 2025 through August 31, 2026 $0.06171 per kWh Tranche 2026 September 1, 2026 through August 31, 2027 $0.05554 per kWh … An … Checked November 16, 2026. aps.com
  5. TEP Rider R-14, Resource Comparison Proxy Export Rate (RCP-PRS), Sheet No. 714, Original Sheet 714-0/714-1, effective September 1, 2023, ACC Decision No. 79065. The Company will meter this export power on an instantaneous basis and provide a monthly bill credit based on the purchase rate in this schedule. ... 3. Each Customer’s initial RCP rate will be applicable for 10 years from the time of their interconnection. … Each calendar year, for the customer … Checked November 16, 2026. docs.tep.com
  6. APS, Solar Energy Credit Transition. Effective: 2017 (ACC Decision No. 75859, Docket E-00000J-14-0023). In 2017, the Arizona Corporation Commission changed how customers are credited for excess energy sent to the grid from rooftop solar systems. ... Your current solar buyback rate lasts 20 years from the date your system was connected to the APS grid. Checked November 16, 2026. aps.com
  7. TEP Statement of Charges (Sheet 801 series), Rider R-14 RCP rate history with ACC Decision numbers; Oct 1, 2026 rate per Decision No. 82172. Rider R-14 – Resource Comparison Proxy (RCP) $0.0964 per kWh $0.0868 per kWh $0.0868 per kWh $0.0781 per kWh $0.0703 per kWh $0.0633 per kWh $0.0570 per kWh $0.0513 per kWh $0.0462 per kWh September 21, 2018 October 1, 2019 October 1, 2020 October 1, 2021 October 1, 2022 October 1, 2023 October 1, … Checked November 16, 2026. docs.tep.com
  8. APS Rate Rider EPR-6 Legacy (Frozen) – Net Metering, A.C.C. No. 6194, Revision No. 2, effective March 8, 2024 in Decision No. 79293. Each Customer’s initial RCP rate will be applicable for 10 years from the time of their interconnection. ... A residential Customer may remain on this rate rider for up to 20 years from the date their solar generator was interconnected … After the December billing cycle, any export energy that has … Checked November 16, 2026. aps.com
  9. Energy Information Administration, Electricity retail sales, residential average price, electricity/retail-sales, sector RES, released October 23, 2026. eia.gov
  10. National Laboratory of the Rockies (formerly NREL), PVWatts v8 model estimates, Typical-year weather (NSRDB), state mean center of population. pvwatts.nlr.gov
  11. SRP – Conserve 6-9 p.m. and Save (solar price plan) page, SRP web page, checked 2026-11-16. As of the May 2026 billing cycle, the export rate is $0.0187/kWh. The export rate is recalculated annually, with adjustments taking effect each May billing cycle. … The amount of energy used in your home is instantaneously monitored and recorded by your meter. ... This is different from net … Checked November 16, 2026. srpnet.com
  12. A.R.S. §43-1083 Credit for solar energy devices. The credit is equal to twenty-five percent of the cost of the device. B. The maximum credit in a taxable year may not exceed one thousand dollars. Checked November 16, 2026. azleg.gov
  13. 26 U.S.C. §25D, Residential clean energy credit, Text current through Public Law 119-142 (November 10, 2026). in the case of property placed in service after December 31, 2021, 30 percent … The credit allowed under this section shall not apply with respect to any expenditures made after December 31, 2025. … an expenditure with respect to an item shall be treated as made when the original installation of … Checked November 16, 2026. uscode.house.gov
  14. IRS Fact Sheet FS-2025-05, FAQs for modification of sections 25C, 25D, 25E, 30C, 30D, 45L, 45W and 179D under Public Law 119-21, August 21, 2025. If installation is completed after December 31, 2025, the expenditure will be treated as made after December 31, 2025, which will prevent the taxpayer from claiming the section 25D credit. Checked November 16, 2026. irs.gov
  15. 26 U.S.C. §48E, Clean electricity investment credit, Text current through Public Law 119-142 (November 10, 2026). with a maximum net output of less than 1 megawatt (as measured in alternating current) … This section shall not apply to any qualified property placed in service by the taxpayer after December 31, 2027, which is part of an applicable facility. … This paragraph shall not apply with respect to any … Checked November 16, 2026. uscode.house.gov
  16. Public Law 119-21 (July 4, 2025), sections 70506 and 70513, 139 Stat. 72. Section 25D(h) is amended by striking ``to property placed in service after December 31, 2034'' and inserting ``with respect to any expenditures made after December 31, 2025'' … shall apply to facilities the construction of which begins after the date which is 12 months after the date of enactment of this Act Checked November 16, 2026. govinfo.gov
  17. SRP – Compare Solar Price Plans, SRP web page, checked 2026-11-16. SRP offers demand- and export-based plans for customers with on-site generation (e.g., rooftop solar systems) and battery energy storage systems. There are also options available to shift from a fixed price for each kilowatt-hour you send back to the grid (e.g., SRP’s export rate) to market-based … Checked November 16, 2026. srpnet.com
  18. Arizona Attorney General press release, "Court of Appeals Sides with Attorney General Mayes, Vacates Corporation Commission’s Solar Surcharge on APS Customers" (June 16, 2026), Ariz. Ct. App. Div. One memorandum decision, June 2026. The Court vacated the Commission’s December 2024 Rehearing Decision and the underlying charges, and remanded to the Commission for further proceedings. Checked November 16, 2026. azag.gov
  19. Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, net metering 2010–2025, Net_Metering sheets of the annual files, released October 7, 2026. eia.gov
  20. Energy Information Administration, Small-scale solar photovoltaic generation and capacity estimates, Electric Power Monthly Table 1.1; small_scale_solar files, released October 23, 2026. eia.gov
  21. Lawrence Berkeley National Laboratory, U.S. Distributed Solar and Storage, 2026 Data Update, Median installed prices of host-owned residential PV installed in 2025, released August 1, 2026. emp.lbl.gov

Rules are quoted from the official text and dated; how we check them: methodology. Not legal or tax advice. Found an error? Write to [email protected]; corrections are listed on the updates page.