TEP solar buyback: the RCP export rate and the October payout
Published November 16, 2026. Rules checked November 16, 2026.
- Net billing Arizona: Rider R-14 (Resource Comparison Proxy export rate). $0.0462/kWh for applications from October 1, 2026, locked for 10 years.12
EIA counted 54,719 residential net-metering installations at TEP at the end of 2025, 2,478 of them with a paired battery.3
Tariffs checked November 16, 2026; EIA-861 2025 final data, released October 7, 2026.
Source: Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data; Census Bureau, Cartographic boundary files, states. States shaded by their program type; EIA-861 2025 rows of the utility.
Show the numbers
| State | Residential installations |
|---|---|
| Arizona (Tucson Electric Power Co) | 54,719 |
Tucson Electric Power buys back rooftop solar, but new systems are not net metered: under Rider R-14, the Resource Comparison Proxy (RCP), exported energy earns a fixed export rate of $0.0462 per kWh for customers who request interconnection from October 1, 2026 through September 30, 2027.56 A household keeps the rate in place when it applied for 10 years, and once a year, on October bills, TEP pays out any unused credit balance above $10.00.2
What TEP pays for an exported kilowatt-hour in 2026
A new TEP solar customer is credited $0.0462 per kWh for exported energy. TEP's own RCP page states that the rate "will remain in effect from October 1, 2026 through September 30, 2027", and that customers "are compensated for up to 10 years at the RCP export rate in place at the time they requested interconnection".56 The Arizona Corporation Commission set the 2026 value in Decision No. 82172.1
The RCP is net billing: each exported kWh earns a separate export rate instead of cancelling a kWh bought from TEP. The rider says TEP "will meter this export power on an instantaneous basis and provide a monthly bill credit based on the purchase rate in this schedule."2 Solar power the home uses as it is produced never registers as an import and so avoids TEP's full price; only the surplus leaving the house at that moment earns the RCP rate.
For scale, Arizona households paid an average of 15.39¢ per kWh7 for grid power over the 12 months to August 2026. That average includes fixed charges and is not a TEP tariff rate, but it shows how far the export rate sits below the value of a kWh the home does not have to buy.
| Rule | What applies |
|---|---|
| Program type | Net billing |
| Program | Rider R-14 (Resource Comparison Proxy export rate) |
| Export credit | $0.0462/kWh for applications from October 1, 2026, locked for 10 years12 |
| Netting interval | None (instantaneous) |
| Unused credits and charges | Balances over $10 paid each October |
Nine RCP vintages since 2018
TEP's Statement of Charges lists every RCP rate since the first one, by the date it took effect for new applications:
| Rate in effect for new applications from | RCP export rate, kept 10 years1 |
|---|---|
| September 21, 2018 | $0.0964 per kWh |
| October 1, 2019 | $0.0868 per kWh |
| October 1, 2020 | $0.0868 per kWh |
| October 1, 2021 | $0.0781 per kWh |
| October 1, 2022 | $0.0703 per kWh |
| October 1, 2023 | $0.0633 per kWh |
| October 1, 2024 | $0.0570 per kWh |
| October 1, 2025 | $0.0513 per kWh |
| October 1, 2026 | $0.0462 per kWh |
The Commission's rules call for annual updates to reflect market prices for solar power, but "the RCP will not be allowed to fall more than 10 percent annually."56 Read against that limit, every change in the table is the full permitted step, to within rounding; the only pause was in 2020, when the rate stayed at $0.0868 per kWh.1 The 2026 rate is less than half the 2018 one.
Because each customer keeps the rate in place when they requested interconnection, the date of that request, not the day the panels switch on, decides which row applies. A request made in the last days of September 2026 fell in the October 1, 2025 vintage at $0.0513 per kWh; one made on October 1, 2026 got $0.0462.156
A worked example at the 2026 rate
The figure below runs one illustrative Tucson household through the RCP with the same code as our export credit calculator. Its monthly use, yearly solar output and the share of that output used in the home as it is produced are printed on the figure; they are our inputs, not typical values. The export rate is the October 1, 2026 RCP of $0.0462 per kWh;1 the price of avoided grid power is Arizona's 12-month average, which includes fixed charges, so put your own bill's numbers into the calculator.
Inputs: 950 kWh a month of use; 10,500 kWh a year of solar output spread over the months as PVWatts models for Arizona; 35% of output used at home as it is produced; energy price 15.39¢ per kWh (the Arizona average residential price over the 12 months to August 2026, which includes fixed charges).
| Solar production in a year | 10,500 kWh |
|---|---|
| Used at home as it is produced | 3,675 kWh |
| Sent to the grid (exports) | 6,825 kWh |
| Bought from the grid (imports) | 7,725 kWh |
| Value of solar used at home, at your energy price | $566 |
| Value of exports under this tariff | $315 |
| Average credit per exported kWh | 4.62¢ |
| Energy charges for a year without solar | $1,754 |
| Energy charges for a year with solar, before fixed charges | $874 |
Source: National Laboratory of the Rockies (formerly NREL), PVWatts v8 model estimates; Energy Information Administration, Electricity retail sales, residential average price. Export treatment from the tariff cited in the text. An illustration of the crediting rule, not a quote or a savings estimate: fixed charges, minimum bills, taxes and time-of-use prices are not modelled. Try your own numbers in the export credit calculator.
Most of the value in the example comes from the self-consumed share, because each of those kWh avoids a purchase at the full price, while each exported kWh earns $0.0462.1 That gap is why the share of output used on site carries so much weight under the RCP: running pool pumps, laundry or car charging in daylight raises it, and a battery can shift midday output to the evening. TEP reported 2,4783 residential batteries paired with net-metered solar at the end of 2025.
Credits through the year and the October check
RCP credits are dollars on the bill. Credits that exceed a month's charges roll forward to later bills, and the settlement comes once a year: "for the customer bills produced in October (September usage), the Company shall pay the Customer for any remaining balance of RCP export credits if the balance exceeds $10.00."2
The October settlement lines up with the rate calendar, which also turns over on October 1.156 Credits earned during the year are applied to bills up to September's usage first; only a balance of more than $10.00 left after that is paid out.2
The rider also adds a cost that customers without solar do not pay. All new residential and small general service DG systems "will be assessed an incremental monthly charge that reflects a portion of the incrementally higher costs associated with the bidirectional meter that is required to serve DG customers."2 TEP lists its current charges in its Statement of Charges.
Sizing: the 125% connected-load limit
Rider R-14 covers a system that "has a generating capacity less than or equal to 125% of the Customer's total connected load at the metered premise". Where TEP has no load data for the premises, the rider ties the limit to the capacity of the service drop instead.2
The limit is on capacity, not on yearly production. Within it, any output the home does not use at the moment leaves as exports at the RCP rate, and credits are paid in cash only once a year, for a balance above $10.00.2
Rider R-4 net metering and the 10-year lock
Homes that were net metered before the RCP stay on TEP's grandfathered net metering rider, Rider R-4. The RCP rider "may not be used in conjunction with the grandfathered net metering rate rider, TEP Rider-4", so a home is on one or the other.2
For RCP customers, "each Customer's initial RCP rate will be applicable for 10 years from the time of their interconnection." After that, the credit follows the RCP rate then in effect. The first RCP vintage dates from September 21, 2018, so the first of those locks end 10 years after the earliest RCP systems were interconnected.12
| Date | Where | What changed |
|---|---|---|
| October 1, 2026 | Arizona | TEP sets its 2026 RCP export rate. TEP’s RCP export rate for new applications became $0.0462/kWh.1 |
Applying to TEP for solar
TEP explains the export rate on its RCP page.56 The full terms are in Rider R-14, Sheet No. 714, effective September 1, 2023 under ACC Decision No. 79065,2 and the rate history is in the Statement of Charges.1
Two details from those documents matter when applying. The date the interconnection request is submitted fixes the RCP vintage, so keep a record of it.56 And a system sized above 125% of the home's connected load falls outside the rider.2
TEP solar homes in EIA data
Tucson's utility is the smallest of Arizona's three big solar utilities: 16% of the state's residential net-metered installations, behind APS (57%) and SRP (19%). At the end of 2025 it counted 54,719 homes and 380 MW, placing it 23rd3 on EIA's national list of utilities by state.
Source: Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data. EIA-861 utility rows, all technologies; utility names as reported to EIA.
Show the numbers
| Utility | Residential installations |
|---|---|
| Arizona Public Service Co | 190,481 |
| Salt River Project | 63,437 |
| Tucson Electric Power Co | 54,719 |
| UNS Electric, Inc | 11,432 |
| Trico Electric Cooperative Inc | 5,993 |
| Electrical Dist No3 Pinal County | 3,713 |
| Mohave Electric Cooperative, Inc. | 2,357 |
| Sulphur Springs Valley E C Inc | 1,174 |
| Navopache Electric Coop, Inc | 567 |
| City of Mesa - (AZ) | 184 |
| Garkane Energy Coop, Inc | 31 |
| Ajo Improvement Co | 18 |
| Dixie Escalante R E A, Inc | 10 |
| Morenci Water and Electric | 1 |
Arizona's count of net-metered customers of all kinds went from 186,999 in 2020 to 339,5823 in 2025, a change of 82%9.
Source: Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, net metering 2010–2025. Customers on a net-metering tariff, all sectors and technologies, end of each year. EIA counted meters in 2010–2012, customers in 2013–2024 and installations in 2025; customers on net billing may be reported outside this count.
Show the numbers
| Year | Customers |
|---|---|
| 2010 | 8,559 |
| 2011 | 11,450 |
| 2012 | 24,397 |
| 2013 | 38,488 |
| 2014 | 53,718 |
| 2015 | 71,352 |
| 2016 | 91,531 |
| 2017 | 120,803 |
| 2018 | 143,332 |
| 2019 | 163,996 |
| 2020 | 186,999 |
| 2021 | 219,904 |
| 2022 | 261,297 |
| 2023 | 300,252 |
| 2024 | 322,457 |
| 2025 | 339,582 |
Arizona and federal tax credits
Arizona's credit for solar energy devices under A.R.S. §43-1083 "is equal to twenty-five percent of the cost of the device", and "the maximum credit in a taxable year may not exceed one thousand dollars."10
A customer in the October 2026 vintage gets the lowest RCP rate yet and, for a purchased system, no federal homeowner credit: §25D ended for expenditures made after December 31, 2025, and an expenditure is dated by the completion of installation, not by payment. A 2025 system's unused credit still carries forward.11
Leased systems and PPAs belong to the solar company, whose §48E credit for solar begun after July 4, 2026 requires the system to be in service by December 31, 2027.1213 The household claims nothing; its contract sets whether any of that credit lowers its payment. The federal solar tax credit page covers both credits, and the Arizona page sets TEP beside APS and SRP.
Questions and answers
Does TEP buy back solar power?
Yes. TEP meters the power a solar home exports on an instantaneous basis and gives a monthly bill credit at the purchase rate in Rider R-14.2
What is TEP's solar buyback rate?
For new customers it is $0.0462 per kWh, in effect from October 1, 2026 through September 30, 2027.56 Customers who applied in earlier years keep the RCP rate of their own year, from $0.0964 per kWh for the first vintage of September 21, 2018 down to $0.0513 for October 1, 2025.1
Does TEP still offer net metering?
Not to new systems. Net metering survives as the grandfathered Rider R-4, and Rider R-14 may not be used in conjunction with it.2
Does TEP pay for unused solar credits?
Once a year. For the bills produced in October, which cover September usage, TEP pays the customer any remaining balance of RCP export credits if the balance exceeds $10.00.2
How big a solar system can I connect to TEP?
Under Rider R-14 the system's generating capacity must be less than or equal to 125% of the customer's total connected load at the metered premise.2
Related pages
Sources
- TEP Statement of Charges (Sheet 801 series), Rider R-14 RCP rate history with ACC Decision numbers; Oct 1, 2026 rate per Decision No. 82172.
Rider R-14 – Resource Comparison Proxy (RCP) $0.0964 per kWh $0.0868 per kWh $0.0868 per kWh $0.0781 per kWh $0.0703 per kWh $0.0633 per kWh $0.0570 per kWh $0.0513 per kWh $0.0462 per kWh September 21, 2018 October 1, 2019 October 1, 2020 October 1, 2021 October 1, 2022 October 1, 2023 October 1, …
Checked November 16, 2026. docs.tep.com - TEP Rider R-14, Resource Comparison Proxy Export Rate (RCP-PRS), Sheet No. 714, Original Sheet 714-0/714-1, effective September 1, 2023, ACC Decision No. 79065.
The Company will meter this export power on an instantaneous basis and provide a monthly bill credit based on the purchase rate in this schedule. ... 3. Each Customer’s initial RCP rate will be applicable for 10 years from the time of their interconnection. … Each calendar year, for the customer …
Checked November 16, 2026. docs.tep.com - Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data, Net_Metering_2025.xlsx (f8612025.zip), released October 7, 2026. eia.gov
- Census Bureau, Cartographic boundary files, states, cb_2025_us_state_20m. census.gov
- Tucson Electric Power, Resource Comparison Proxy Export Rate. Effective: 2026-10-01.
customers are compensated for up to 10 years at the RCP export rate in place at the time they requested interconnection of a new solar power system. ... An energy export rate of $0.0462 per kWh will remain in effect from October 1, 2026 through September 30, 2027. ... Rules approved by the ACC call …
Checked November 16, 2026. tep.com - APS, Renewable Energy Riders (RCP Export Rider, EPR-6, Legacy EPR-6).
aps Resource Comparison Proxy (RCP) is a net billing solar purchase energy rider, it measures the excess power you don't use and gives you a monthly bill credit based on the current RCP purchase rate. The credit will apply towards your APS billed amount for that month, and any remaining credit will …
Checked November 16, 2026. aps.com - Energy Information Administration, Electricity retail sales, residential average price, electricity/retail-sales, sector RES, released October 23, 2026. eia.gov
- National Laboratory of the Rockies (formerly NREL), PVWatts v8 model estimates, Typical-year weather (NSRDB), state mean center of population. pvwatts.nlr.gov
- Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, net metering 2010–2025, Net_Metering sheets of the annual files, released October 7, 2026. eia.gov
- A.R.S. §43-1083 Credit for solar energy devices.
The credit is equal to twenty-five percent of the cost of the device. B. The maximum credit in a taxable year may not exceed one thousand dollars.
Checked November 16, 2026. azleg.gov - 26 U.S.C. §25D, Residential clean energy credit, Text current through Public Law 119-142 (November 10, 2026).
in the case of property placed in service after December 31, 2021, 30 percent … The credit allowed under this section shall not apply with respect to any expenditures made after December 31, 2025. … an expenditure with respect to an item shall be treated as made when the original installation of …
Checked November 16, 2026. uscode.house.gov - 26 U.S.C. §48E, Clean electricity investment credit, Text current through Public Law 119-142 (November 10, 2026).
with a maximum net output of less than 1 megawatt (as measured in alternating current) … This section shall not apply to any qualified property placed in service by the taxpayer after December 31, 2027, which is part of an applicable facility. … This paragraph shall not apply with respect to any …
Checked November 16, 2026. uscode.house.gov - Public Law 119-21 (July 4, 2025), sections 70506 and 70513, 139 Stat. 72.
Section 25D(h) is amended by striking ``to property placed in service after December 31, 2034'' and inserting ``with respect to any expenditures made after December 31, 2025'' … shall apply to facilities the construction of which begins after the date which is 12 months after the date of enactment of this Act
Checked November 16, 2026. govinfo.gov