Xcel Energy net metering in Colorado and Minnesota
Published November 16, 2026. Rules checked November 16, 2026.
- Net metering Colorado: Net Metering Service, Schedule NM. Excess kWh carried month to month at retail.12
- Net metering, reduced excess Minnesota: Rate Code A50 (systems under 40 kW AC). Monthly net excess paid at the average retail utility energy rate.34
EIA counted 137,317 residential net-metering installations at Xcel Energy at the end of 2025.5
Tariffs checked November 16, 2026; EIA-861 2025 final data, released October 7, 2026.
Source: Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data; Census Bureau, Cartographic boundary files, states. States shaded by their program type; EIA-861 2025 rows of the utility.
Show the numbers
| State | Residential installations |
|---|---|
| Colorado (Public Service Co of Colorado) | 121,127 |
| Minnesota (Northern States Power Co - Minnesota) | 16,190 |
Xcel Energy net meters rooftop solar in Colorado and Minnesota, but the leftover energy is handled in opposite ways. In Colorado, excess kilowatt-hours bank from month to month and whatever remains at year end is paid at a supply-cost rate rather than retail, unless you elect the roll-over option.1 In Minnesota, small systems are paid for each month's net excess at the average retail energy rate, so nothing waits for a year-end settlement.3
Xcel Energy is the brand of several regulated utilities. In Colorado it is Public Service Company of Colorado, which bills under the Colorado PUC No. 8 electric tariff; in Minnesota it is Northern States Power Company, which bills under the Minnesota rate book. Each state's commission sets the rules, so the answer to "does Xcel do net metering" depends on which bill you get.
| Colorado (Public Service Company of Colorado) | Minnesota (Northern States Power) | |
|---|---|---|
| Tariff | Schedule NM, Net Metering Service | Rate Code A50, Section 9 |
| Within the month | Imports and exports net; on time-of-use rates, by period | Imports and exports net over the billing period |
| Excess energy | Carried forward in kWh, credited 1:1 | Paid each month at the average retail energy rate |
| End of year | Cash-out at the Average Hourly Incremental Cost, or roll-over as a dollar credit | No year-end step for A50 payments |
| Size | Up to 120% of average annual use at the site1 | Under 40 kW AC for A503 |
Colorado: excess kWh bank until December
Public Service Company of Colorado's Net Metering Service is Schedule NM, on Sheets 112 to 112C of its electric tariff, effective March 10, 2018 under Advice Letter 1760.1 It follows the Colorado commission's Rule 3664, which requires investor-owned utilities to carry excess kWh forward from month to month and credit them at a ratio of 1:1 against the customer's retail kWh consumption in later months.2
So for most of the year an exported kilowatt-hour is worth whatever a purchased kilowatt-hour would have cost on your rate. Colorado's average residential price was 16.65¢ per kWh7 over the September 2025 to August 2026 period; that average includes fixed charges, so the energy rate on an Xcel bill differs.
| Rule | What applies |
|---|---|
| Program type | Net metering |
| Program | Net Metering Service, Schedule NM |
| Export credit | Excess kWh carried month to month at retail12 |
| Netting interval | Monthly (by time-of-use period on TOU rates) |
| Unused credits and charges | Year-end cash-out at the Average Hourly Incremental Cost, or a one-time roll-over option |
Time-of-use netting
On a time-of-use rate, Schedule NM tracks excess energy by the period in which it was generated. Inside a billing period, excess On Peak energy may offset Shoulder or Off Peak energy, and excess Shoulder energy may offset Off Peak energy;1 the tariff does not let cheaper Off Peak exports cancel On Peak use. Panels produce most of their surplus in daylight hours, so which periods your exports land in decides how much of your evening use they can cover.
The year-end cash-out and the roll-over option
Within 60 days of the end of each calendar year, an investor-owned utility in Colorado must pay for any accrued excess kWh at its average hourly incremental cost of electricity supply over the most recent calendar year.28 Xcel's tariff names this the Average Hourly Incremental Cost, or AHIC, and it is the default "Cash Out Option".1 Because AHIC reflects the cost of supply rather than the full retail price, a system that produces more than the home uses over a year earns less for the surplus than for the energy it offsets.
The alternative is the "Roll Over Option": a one-time election in writing to have Xcel carry forward excess energy as a dollar credit from month to month indefinitely. The trade-off is in the same sentence of the tariff: when the customer terminates service, no payment is made for any remaining balance.1 The choice matters most for a household that may move: under the roll-over, a balance still on the account when service ends is not paid out.
Size limit and the production meter
Schedule NM covers systems no larger than 120% of the customer's average annual consumption at the site, with a rated capacity that does not exceed the service entrance capacity.1 The commission's rule sets the same 120% sizing ceiling for investor-owned utilities.2
Xcel installs a production meter on the solar system. Customers in its SolarRewards program pay a Production Meter Charge; a customer who is net metered under Schedule NM but does not participate in SolarRewards is not assessed that charge.1
Colorado dates to watch
House Bill 26-1007, approved May 7, 2026, directs the Colorado commission to revise its rules on or before December 31, 2026 so that a qualifying retail utility such as Xcel posts and maintains on its website a public list of at least one meter collar adapter, and approves others within 90 days. The same law defines a "portable-scale solar generation device", meaning plug-in solar, and from January 1, 2027 bars homeowners' association rules from prohibiting one.9 The bill text is on the Colorado General Assembly's site. Colorado's statewide rules for all utilities, including co-ops, are on our Colorado net metering page.
Minnesota: monthly payment under Rate Code A50
In Minnesota, Xcel's Rate Code A50 is available to any qualifying facility of less than 40 kW AC capacity that receives non-time-of-day retail service and offsets energy delivered by Xcel. It applies to the extent the energy the customer delivers exceeds what Xcel supplies during the monthly billing period, and its rates are for that net excess generation. Energy used beyond what the system delivered in the same billing period is billed at the appropriate non-time-of-day retail rate.3
The design comes from Minnesota's statute, which lets a qualifying facility under 40 kilowatts elect compensation for its net input at the average retail utility energy rate. Under that statute, kilowatt-hour credits that a customer carries forward cancel at the end of the calendar year with no additional compensation, a provision that applies to cooperative and municipal kWh-credit arrangements and to larger systems that take kWh credits; an A50 customer is paid month by month instead.4
| Rule | What applies |
|---|---|
| Program type | Net metering, reduced excess |
| Program | Rate Code A50 (systems under 40 kW AC) |
| Export credit | Monthly net excess paid at the average retail utility energy rate34 |
| Netting interval | Monthly |
| Unused credits and charges | Paid monthly |
What A50 lists per kWh
The A50 sheet on Xcel's website is the 28th Revised Sheet No. 9-2, effective December 24, 2020 under Docket No. E002/M-20-606. It lists these payments per kWh delivered to Xcel in excess of energy used:3
| Retail service | October to May | June to September |
|---|---|---|
| Non-demand metered | $0.11402 | $0.11964 |
| Demand metered | $0.06302 | $0.065273 |
Values from Rate Code A50 as dated December 24, 2020.3 Because A50 pays the average retail energy rate, it moves when Minnesota retail rates change, so read the sheet in force when you apply; it is in Xcel's Minnesota rate book, Section 9. For comparison, Minnesota's average residential price, which includes fixed charges, was 16.28¢ per kWh7 over the September 2025 to August 2026 period. A50 is limited to non-time-of-day service, so a customer on a time-of-day rate should read the sheet that applies to that rate.
Size and standby charges
Minnesota law allows net metering for systems under 40 kW at every utility and up to 1,000 kW at public utilities such as Xcel, which may limit a solar system so its annual production is no more than 120% of on-site annual consumption. Public utilities may not impose standby charges on facilities of 100 kW or less; the statute's separate fixed-cost fee applies only to cooperative and municipal utilities. Systems from 40 kW to 1,000 kW at a public utility are compensated at an avoided-cost-based rate or with kWh credits carried forward instead of A50.4 The state's rules for every Minnesota utility are on our Minnesota net metering page.
Xcel Energy solar in EIA's 2025 data
Xcel serves most net-metered homes in both states, and Colorado is the bigger of the two by far: 121,127 homes there, 62% of Colorado's total and the 6th biggest utility-state count in the nation. With Minnesota added, the two companies had 137,317 residential installations and 843 MW5 at the end of 2025.
Source: Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data. EIA-861 utility rows, all technologies; utility names as reported to EIA.
Show the numbers
| Utility | Residential installations |
|---|---|
| Public Service Co of Colorado | 121,127 |
| United Power, Inc | 13,331 |
| CORE Electric Cooperative | 10,449 |
| City of Colorado Springs - (CO) | 10,347 |
| Black Hills Colorado Electric, LLC | 10,256 |
| City of Fort Collins - (CO) | 4,899 |
| Mountain View Elec Assn, Inc | 4,109 |
| La Plata Electric Assn, Inc | 3,543 |
| Poudre Valley REA, Inc | 2,893 |
| Holy Cross Electric Assn, Inc | 2,763 |
| Delta Montrose Electric Assn | 2,384 |
| San Isabel Electric Assn, Inc | 1,419 |
| Grand Valley Power | 1,418 |
| City of Longmont | 1,070 |
| City of Fountain | 1,004 |
| San Miguel Power Assn, Inc | 757 |
| Empire Electric Assn, Inc | 665 |
| City of Loveland - (CO) | 559 |
| Yampa Valley Electric Assn Inc | 551 |
| Mountain Parks Electric, Inc | 421 |
| San Luis Valley R E C, Inc | 308 |
| Southeast Colorado Power Assn | 114 |
| Morgan County Rural Elec Assn | 93 |
| Highline Electric Assn | 66 |
| Y-W Electric Assn Inc | 35 |
| City of Fort Morgan | 31 |
| K C Electric Association | 23 |
| White River Electric Assn, Inc | 21 |
| High West Energy, Inc | 11 |
| Moon Lake Electric Assn Inc | 4 |
In Minnesota, Northern States Power reported 16,190 residential installations, 58% of the state's total. Minnesota's net-metered customers of all kinds grew from 9,67010 in 2020 to 30,7135 in 2025.
Source: Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data. EIA-861 utility rows, all technologies; utility names as reported to EIA.
Show the numbers
| Utility | Residential installations |
|---|---|
| Northern States Power Co - Minnesota | 16,190 |
| Dakota Electric Association | 1,748 |
| Connexus Energy | 1,600 |
| ALLETE, Inc. | 1,313 |
| Rochester Public Utilities | 963 |
| East Central Energy | 685 |
| Minnesota Valley Electric Coop | 531 |
| MiEnergy Cooperative | 525 |
| People's Cooperative Services | 466 |
| Crow Wing Cooperative Power & Light Comp | 461 |
| Wright-Hennepin Coop Elec Assn | 390 |
| Shakopee Public Utilities Comm | 365 |
| Lake Country Power | 313 |
| Stearns Cooperative Elec Assn | 261 |
| Steele-Waseca Cooperative Electric | 247 |
| BENCO Electric Cooperative | 195 |
| City of Chaska - (MN) | 176 |
| Freeborn Mower Electric Cooperative | 170 |
| Lake Region Electric Cooperative - (MN) | 135 |
| Meeker Coop Light & Power Assn | 129 |
| Beltrami Electric Coop, Inc | 125 |
| City of Elk River | 115 |
| Itasca-Mantrap Co-op Electrical Assn | 90 |
| Otter Tail Power Co | 86 |
| Wild Rice Electric Coop, Inc | 82 |
| City of Owatonna - (MN) | 76 |
| Runestone Electric Assn | 72 |
| Mille Lacs Energy Cooperative | 65 |
| City of Anoka | 59 |
| South Central Electric Assn | 49 |
| Sioux Valley SW Elec Coop | 45 |
| Agralite Electric Coop | 43 |
| Minnesota Valley Coop L&P Assn | 43 |
| City of Austin - (MN) | 34 |
| City of Moorhead - (MN) | 32 |
| City of Alexandria - (MN) | 18 |
| Federated Rural Electric Assn | 13 |
| Willmar Municipal Utilities (MN) | 13 |
| Glencoe Light & Power Comm | 9 |
| City of Marshall - (MN) | 8 |
| City of Lake Crystal - (MN) | 5 |
| City of Worthington - (MN) | 2 |
| Heartland Power Coop | 1 |
EIA counts installations, not accounts on a given rate, so the figures do not show how many Colorado customers chose the roll-over option.
Applying and the federal credit
Xcel publishes its tariffs, including the full Colorado tariff with Schedule NM, on its own site: the PSCo electric tariff and the Minnesota Section 9 rate book linked above. Colorado's interconnection standards for investor-owned utilities are in the commission's rules, 4 CCR 723-3.9
On the tax side, Colorado and Minnesota households are in the same position. Federal §25D is closed to expenditures made after December 31, 2025, and an expenditure counts as made when installation is completed, so a system bought for a 2026 installation brings no homeowner credit, though an unused credit from an earlier one still carries forward.11 Leased systems and PPAs leave the credit with the solar company under §48E, which needs solar begun after July 4, 2026 in service by December 31, 2027.1213 The federal solar tax credit page covers both cases.
Questions and answers
Does Xcel Energy buy back solar power?
Yes, in both states, but in different ways. In Colorado, excess energy is credited kilowatt-hour for kilowatt-hour in later months and any remainder is cashed out at the Average Hourly Incremental Cost after the year ends.1 In Minnesota, systems under 40 kW AC on non-time-of-day service are paid for monthly net excess under Rate Code A50.3
How much does Xcel pay for solar in Minnesota?
Xcel's Rate Code A50 sheet effective December 24, 2020 lists $0.11402 per kWh from October to May and $0.11964 from June to September for customers with non-demand-metered service.3 Check the current Section 9 rate book before relying on a figure.
How much does Xcel pay for leftover solar credits in Colorado?
Excess energy still unused at the end of the year is compensated at the Average Hourly Incremental Cost, a figure based on the cost of electricity supply, not the retail rate.128
What is the Xcel Colorado roll-over option?
A one-time written election that turns your excess energy into a dollar credit carried from month to month indefinitely instead of being cashed out each year. When you end service, no payment is made for any remaining balance.1
Does Xcel charge net-metered customers for the solar production meter in Colorado?
Not unless you are in Solar*Rewards. A customer net metered under Schedule NM who does not participate in the program is not assessed a Production Meter Charge.1
Related pages
Sources
- PSCo Colo. PUC No. 8 Electric tariff – Net Metering Service, Schedule NM (in "Entire Tariff" PDF), Sheets 112, 112B, 112C – Advice Letter 1760, issued Feb 7, 2018, effective Mar 10, 2018.
that is no larger than one hundred and twenty percent (120%) of the average annual consumption of electricity by the Customer at that site, and that has a rated capacity that does not exceed the Customers service entrance capacity. … Inside of a billing period, excess On Peak energy may be utilized …
Checked November 16, 2026. xcelenergy.com - 4 CCR 723-3-3664 Net Metering (Colorado PUC electric rules; text via Cornell LII mirror of the Code of Colorado Regulations). Effective: rule notes list amendments effective 9/30/2015 onward.
(I) the retail renewable distributed generation shall be sized to supply no more than 120 percent of the customer's average annual electricity consumption at that site ... (b) ... the excess kWh shall be carried forward from month to month and credited at a ratio of 1:1 against the customer's …
Checked November 16, 2026. law.cornell.edu - Xcel Energy (NSP-Minnesota) Minnesota Electric Rate Book – MPUC No. 2, Section 9, Rate Code A50, 28th Revised Sheet No. 9-2, Sheet 9-2, filed 07-17-20, effective 12-24-20, Docket No. E002/M-20-606 (Order 11-24-20).
Available to any qualifying facility (QF) of less than 40 kW AC capacity who receives non-time of day retail electric service from Company and offsets energy delivered by Company. The A50 Rate Code applies to the extent the energy delivered by the customer exceeds that supplied by the Company …
Checked November 16, 2026. xcelenergy.com - Minn. Stat. §216B.164.
A cooperative electric association or municipal utility may charge an additional fee to recover the fixed costs not already paid for by the customer through the customer's existing billing arrangement. ... a qualifying facility having less than 40-kilowatt capacity may elect that the compensation …
Checked November 16, 2026. revisor.mn.gov - Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data, Net_Metering_2025.xlsx (f8612025.zip), released October 7, 2026. eia.gov
- Census Bureau, Cartographic boundary files, states, cb_2025_us_state_20m. census.gov
- Energy Information Administration, Electricity retail sales, residential average price, electricity/retail-sales, sector RES, released October 23, 2026. eia.gov
- C.R.S. §40-9.5-118 Net metering - rules (cooperatives) (copy hosted by Y-W Electric Association).
(a) Monthly excess generation. If a customer-generator generates electricity in excess of the customer-generator's monthly consumption, all such excess energy, expressed in kilowatt-hours, shall be carried forward from month to month and credited at a ratio of one to one against the customer- …
Checked November 16, 2026. ywelectric.coop - Colorado Session Laws 2026, Ch. 127, House Bill 26-1007. Effective: ~2026-08-12 (90 days after adjournment).
(1.3) ON OR BEFORE DECEMBER 31, 2026, THE COMMISSION SHALL REVISE EXISTING RULES TO: (a) REQUIRE A QUALIFYING RETAIL UTILITY TO POST AND MAINTAIN ON ITS WEBSITE A PUBLIC LIST OF AT LEAST ONE METER COLLAR ADAPTER ... (VII) ON AND AFTER JANUARY 1, 2027, A PORTABLE-SCALE SOLAR GENERATION DEVICE, AS …
Checked November 16, 2026. leg.colorado.gov - Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, net metering 2010–2025, Net_Metering sheets of the annual files, released October 7, 2026. eia.gov
- 26 U.S.C. §25D, Residential clean energy credit, Text current through Public Law 119-142 (November 10, 2026).
in the case of property placed in service after December 31, 2021, 30 percent … The credit allowed under this section shall not apply with respect to any expenditures made after December 31, 2025. … an expenditure with respect to an item shall be treated as made when the original installation of …
Checked November 16, 2026. uscode.house.gov - 26 U.S.C. §48E, Clean electricity investment credit, Text current through Public Law 119-142 (November 10, 2026).
with a maximum net output of less than 1 megawatt (as measured in alternating current) … This section shall not apply to any qualified property placed in service by the taxpayer after December 31, 2027, which is part of an applicable facility. … This paragraph shall not apply with respect to any …
Checked November 16, 2026. uscode.house.gov - Public Law 119-21 (July 4, 2025), sections 70506 and 70513, 139 Stat. 72.
Section 25D(h) is amended by striking ``to property placed in service after December 31, 2034'' and inserting ``with respect to any expenditures made after December 31, 2025'' … shall apply to facilities the construction of which begins after the date which is 12 months after the date of enactment of this Act
Checked November 16, 2026. govinfo.gov
Rules are quoted from the official text and dated; how we check them: methodology. Not legal or tax advice. Found an error? Write to [email protected]; corrections are listed on the updates page.