Tennessee has no net metering rule; TVA buys solar at avoided cost

Published November 16, 2026. Rules checked November 16, 2026.

Utility buybackTVA Dispersed Power Price Schedule CSPP · November 1, 2026

No statewide net metering: TVA Dispersed Power Production. TVA buys output from qualifying facilities, including homes, at its avoided cost: 3.373¢/kWh for all kWh in November 2026.23 Paid monthly under a power purchase agreement. EIA counted 98 homes on net metering in Tennessee at the end of 2025.1

Rules checked November 16, 2026 against the official text; EIA-861 2025 final data, released October 7, 2026.

South region, East South Central division

Tennessee has no statewide net metering rule. The program open to Tennessee homeowners who want to sell solar power is the Tennessee Valley Authority's Dispersed Power Production program, which buys a qualifying system's output at TVA's avoided cost: 3.373¢ per kWh for all kilowatt-hours under Part A of the price schedule effective November 1, 2026.23 That price is a wholesale value, not the retail price of the power a home buys back, and TVA revises it.

Why there is no Tennessee net metering rule to look up

In most states a search for "net metering" ends at a statute or a commission rule that tells utilities how to credit a home's exports. Tennessee has none. What a Tennessee solar home can sell, and for how much, is set instead by the Tennessee Valley Authority's Dispersed Power Production (DPP) Guidelines and their price attachment, Dispersed Power Price Schedule CSPP.23

TVA describes the program on its Valley Renewable Energy page as open to industry, businesses and residents who meet the program requirements, for solar, wind, biomass or combined heat and power. The guidelines name two parties on the buying side: TVA itself, and the "Local Power Company", defined as an electric cooperative or municipal electric system that buys power from TVA under a wholesale power contract and distributes it to consumers.23 For a household, the co-op or city utility on the bill is the local power company, and it is part of the arrangement.

Net metering rules in Tennessee at a glance
RuleWhat applies
Program typeUtility buyback No statewide net metering requirement: each utility or retail provider sets its own buyback terms.
ProgramNo statewide net metering: TVA Dispersed Power Production
How exports are creditedTVA buys output from qualifying facilities, including homes, at its avoided cost: 3.373¢/kWh for all kWh in November 202623
Netting intervalSet by TVA and the local power company
Unused creditsPaid monthly under a power purchase agreement
InstrumentTVA Dispersed Power Price Schedule CSPP
In effectNovember 1, 2026
CheckedNovember 16, 2026

The difference from net metering is in the unit of credit. Under net metering an exported kilowatt-hour cancels a kilowatt-hour the home buys later, so it is worth the retail price. Under DPP, TVA buys the energy at a price of its own, set from its projected avoided costs, and nothing is banked against future purchases.23

TVA's buyback prices from November 1, 2026

The current Schedule CSPP took effect on November 1, 2026 and supersedes the schedule of October 1, 2026. It offers two ways to be paid:23

Schedule CSPP optionHow energy is pricedPrice per kWh
Part Aall kilowatt-hours in the month, one price3.373¢23
Part Bby time of day3.202¢ (super off-peak) to 3.571¢ (super peak)

The spread between the cheapest and dearest Part B periods is small: under half a cent. A seller choosing Part B is betting that its output falls more in the higher-priced hours than the flat Part A price assumes; the schedule's period definitions are in the DPP Guidelines, published on TVA's EnergyRight site.23

Neither price is fixed for the life of a system. The schedule says some or all of the prices are subject to revision by TVA at least annually, or at any other time, to reflect changes in TVA's then-current projections of avoided energy and capacity costs.3 The November schedule replacing the October one is an example of how often that can happen.2

What a TVA purchase price is worth against a Tennessee bill

Tennessee households paid an average of 13.61¢ per kWh over the 12 months to August 2026, all charges included, 8th lowest4 among the states. That average divides residential revenue by kilowatt-hours sold, so it includes fixed charges and is not a tariff rate. Even so, it is roughly four times the Part A purchase price of 3.373¢ per kWh.23

The arithmetic matters for how a system is used. Solar power consumed in the house at the moment it is produced is never bought from the local power company, so it is worth whatever that utility charges per kilowatt-hour. Power sold to TVA is worth the avoided-cost price. A household that sells most of its output gets the lower value for most of it; one that uses most of its output at home gets the higher value for most of it. A battery or shifting laundry and car charging into the sunny hours moves kilowatt-hours from the first group to the second. None of this is a savings estimate: the split depends on the home, the system and the local power company's rates.

Average residential price, 12 months to August 2026 (¢/kWh): top 10

Source: Energy Information Administration, Electricity retail sales, residential average price. Revenue divided by kWh, all charges included: not a tariff rate. Bar colour: program type.

Show the numbers
StateAverage residential price, 12 months to August 2026 (¢/kWh)
Hawaii44.27¢
California32.34¢
Massachusetts30.39¢
Maine29.60¢
Rhode Island29.44¢
New York28.60¢
Connecticut27.42¢
New Hampshire26.95¢
Alaska26.94¢
District of Columbia24.48¢
Vermont23.90¢
New Jersey23.74¢
Michigan21.28¢
Maryland21.18¢
Pennsylvania20.86¢
Illinois18.91¢
Wisconsin18.79¢
Ohio18.41¢
Delaware17.98¢
Indiana16.90¢
Colorado16.65¢
Virginia16.64¢
Alabama16.44¢
Minnesota16.28¢
Texas15.98¢
South Carolina15.77¢
New Mexico15.53¢
Oregon15.53¢
West Virginia15.53¢
Florida15.41¢
Arizona15.39¢
Georgia15.17¢
Kansas15.13¢
Mississippi14.85¢
North Carolina14.79¢
South Dakota14.28¢
Iowa14.20¢
Washington14.20¢
Wyoming14.01¢
Missouri13.97¢
Kentucky13.94¢
Montana13.94¢
Oklahoma13.81¢
Tennessee13.61¢
Arkansas13.57¢
Nevada13.45¢
Utah13.26¢
Louisiana13.02¢
Idaho12.77¢
Nebraska12.74¢
North Dakota12.35¢

The chart puts Tennessee's average price beside the states with the highest. Tennessee's low retail price narrows the gap between selling and self-use compared with a high-price state, but the gap is still large.

Costs and paperwork that fall on the seller

The DPP Guidelines put the connection costs on the producer. The seller makes the interconnection arrangements with the connecting electric system, TVA or the local power company, at its own expense, and bears interconnection, transmission and metering costs. A home that wants maintenance or emergency standby power from TVA's system takes it under TVA's Standby Power Rate, Schedule SP.2

Eligibility follows federal law, not a state size cap. A system qualifies if it is a cogeneration or small power production facility that meets the qualifications in FERC rules, 18 C.F.R. Part 292. Producers that contract to provide 500 kW or more of capacity may be offered Alternative Purchase Prices instead of Schedule CSPP, a size well beyond a home rooftop.2

The sale itself runs on a contract. Purchases under Part A and Part B are made under a power purchase agreement with a term of not less than one year, and representatives of TVA or the local power company read the meters at the connection point every month.2 There is no year-end true-up because there is no credit balance to settle: each month's energy is bought at the schedule price.

Kingsport Power: the only utility reporting net metering

EIA's annual survey shows how narrow net metering is in Tennessee. One utility, Kingsport Power Co, reported residential net-metering installations for 2025: 98 homes, which is 100% of the state total. Counting businesses, the state had 110 net-metering customers with 1.1 MW of capacity, 2nd lowest1 among the 50 states and the District of Columbia.

Utilities with the most net-metered homes in Tennessee, 2025
Kingsport Power Co98100.0%0.739

Source: Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data.

Kingsport Power's net metering terms are in its own tariff, and a Kingsport Power customer should read that tariff before relying on any credit. A customer of a co-op or city utility should ask that local power company how TVA's DPP program, and any program of its own, applies at their address; the utility finder shows which utility serves a location.

The Kingsport count grew from 35 customers in 2020 to 99 in 2024 and 110 at the end of 2025, an increase of 214%5 that adds up to a few dozen systems. The preliminary monthly survey counted 1156 solar net-metering customers in August 2026. Of the residential systems, 391 were paired with a battery.

Rooftop solar that EIA counts outside net metering

The net metering table is a small part of Tennessee's customer-sited solar. EIA's separate estimate of small-scale solar, which covers systems under 1 MW whether or not they are net metered, puts Tennessee at 58 MW of capacity in December 2025, against 1.1 MW1 reported as net metered. Those systems produced an estimated 87 million kWh in 2025, 9th lowest7 among the states. The estimate does not say how each system is billed; it does show that most small-scale solar in Tennessee operates outside a net metering arrangement.

Rooftop and other small-scale solar generation in Tennessee, 2017–2025
Rooftop and other small-scale solar generation in Tennessee, 2017–20250 GWh25 GWh50 GWh75 GWh20172019202120232025

Source: Energy Information Administration, Small-scale solar photovoltaic generation and capacity estimates. EIA estimates for photovoltaic systems under 1 MW (homes and businesses), million kWh (GWh) a year.

Show the numbers
YearMillion kWh
201787
201890
201994
202089
202189
202275
202372
202486
202587
Solar and net metering in Tennessee: the numbers
MeasureTennesseeUnited States
Net-metering customers (2025)11105,904,992
of which residential1985,637,805
Net-metered capacity (2025)11 MW62,588 MW
Customers in 20205352,801,727
Homes with a battery paired with solar (2025)139431,825
Small-scale solar generation (2025, million kWh)78793,041
Average residential price, 12 months to August 2026413.61¢–

Tennessee solar incentives and the federal credit

No statewide Tennessee incentive for home solar appears on solar incentives by state; for a home system the money questions are TVA's purchase price above and the federal rules below.

The federal residential clean energy credit, Section 25D, does not apply to expenditures made after December 31, 2025. An expenditure counts as made when the installation is completed, so a system finished in 2026 earns no federal homeowner credit even if it was paid for in 2025. A household whose 2025 credit exceeded its tax for that year carries the unused part forward to the next tax year.8

Under a lease or power purchase agreement with a solar company, the household claims no federal credit. The system's owner may claim the business credit under Section 48E; for solar whose construction begins after July 4, 2026, that credit is not available for property placed in service after December 31, 2027.910 Whether any of it reaches the household depends on the contract. The federal solar tax credit page covers the dates in full, and net metering by state shows how TVA's avoided-cost purchase compares with states that have a statewide rule.

Questions and answers

Does Tennessee have net metering?

There is no statewide net metering rule. TVA buys output from qualifying facilities under its Dispersed Power Production Guidelines and Dispersed Power Price Schedule CSPP, at its avoided cost rather than the retail price.23

How much does TVA pay for solar in Tennessee?

Under the Dispersed Power Price Schedule CSPP effective November 1, 2026, Part A pays 3.373¢ per kWh for all kilowatt-hours in the month. Part B pays by time of day, from 3.202¢ per kWh super off-peak to 3.571¢ per kWh super peak. TVA may revise the prices at least annually or at any other time.23

Does Tennessee have solar incentives?

The program open to a home that wants to sell solar output is TVA's Dispersed Power Production purchase at avoided cost.23 The federal homeowner credit has ended: the residential clean energy credit does not apply to expenditures made after December 31, 2025, and an expenditure counts as made when installation is completed.8

Is there a Tennessee solar tax credit in 2026?

Not the federal homeowner credit for a system completed in 2026: Section 25D does not apply to expenditures made after December 31, 2025. Credit left over from a 2025 installation carries forward to the next tax year.8

Who reads the meter and pays a Tennessee solar seller?

Representatives of TVA or the local power company read the meters at the connection point each month, and purchases run under a power purchase agreement with a term of not less than one year.2

Related to Tennessee

Sources

  1. Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data, Net_Metering_2025.xlsx (f8612025.zip), released October 7, 2026. eia.gov
  2. Tennessee Valley Authority, Dispersed Power Production Guidelines and Dispersed Power Price Schedule CSPP (effective November 1, 2026). Effective: November 1, 2026. This letter shall serve as notice that TVA is in the process of implementing changes to the Dispersed Power Production (DPP) Guidelines, specifically to Dispersed Power Price Schedule CSPP found in Attachment A to the DPP Guidelines, effective November 1, 2026. ... November 1, 2026 (Supersedes … Checked November 16, 2026. energyright.com
  3. Tennessee Valley Authority, Valley Renewable Energy. Renewable facilities - solar, wind, biomass or combined heat power - can sell power to TVA at TVA's monthly avoided cost. Open to industry, businesses and residents who meet program requirements. Checked November 16, 2026. tva.com
  4. Energy Information Administration, Electricity retail sales, residential average price, electricity/retail-sales, sector RES, released October 23, 2026. eia.gov
  5. Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, net metering 2010–2025, Net_Metering sheets of the annual files, released October 7, 2026. eia.gov
  6. Energy Information Administration, Form EIA-861M monthly net metering, 2026, net_metering2026.xlsx, released October 23, 2026. eia.gov
  7. Energy Information Administration, Small-scale solar photovoltaic generation and capacity estimates, Electric Power Monthly Table 1.1; small_scale_solar files, released October 23, 2026. eia.gov
  8. 26 U.S.C. §25D, Residential clean energy credit, Text current through Public Law 119-142 (November 10, 2026). in the case of property placed in service after December 31, 2021, 30 percent … The credit allowed under this section shall not apply with respect to any expenditures made after December 31, 2025. … an expenditure with respect to an item shall be treated as made when the original installation of … Checked November 16, 2026. uscode.house.gov
  9. Public Law 119-21 (July 4, 2025), sections 70506 and 70513, 139 Stat. 72. Section 25D(h) is amended by striking ``to property placed in service after December 31, 2034'' and inserting ``with respect to any expenditures made after December 31, 2025'' … shall apply to facilities the construction of which begins after the date which is 12 months after the date of enactment of this Act Checked November 16, 2026. govinfo.gov
  10. 26 U.S.C. §48E, Clean electricity investment credit, Text current through Public Law 119-142 (November 10, 2026). with a maximum net output of less than 1 megawatt (as measured in alternating current) … This section shall not apply to any qualified property placed in service by the taxpayer after December 31, 2027, which is part of an applicable facility. … This paragraph shall not apply with respect to any … Checked November 16, 2026. uscode.house.gov

Rules are quoted from the official text and dated; how we check them: methodology. Not legal or tax advice. Found an error? Write to [email protected]; corrections are listed on the updates page.