PG&E net metering and the Solar Billing Plan
Published November 16, 2026. Rules checked November 16, 2026.
- Net billing California: Net Billing Tariff (Schedule NBT, "Solar Billing Plan"). Hourly Avoided Cost Calculator export values; ACC Plus adder of $0.0088/kWh for 2026 applications.1
EIA counted 931,269 residential net-metering installations at PG&E at the end of 2025, 177,678 of them with a paired battery.2
Tariffs checked November 16, 2026; EIA-861 2025 final data, released October 7, 2026.
Source: Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data; Census Bureau, Cartographic boundary files, states. States shaded by their program type; EIA-861 2025 rows of the utility.
Show the numbers
| State | Residential installations |
|---|---|
| California (Pacific Gas & Electric Co.) | 931,269 |
PG&E still buys back solar, but new customers are not net metered. Since April 15, 2023, new systems go on the Net Billing Tariff, which PG&E calls the Solar Billing Plan;1 each exported kilowatt-hour earns an hourly export value instead of offsetting a purchased one. Customers who connected earlier stay on NEM 1.0 or NEM 2.0 for 20 years from their permission to operate.4
Which PG&E plan you are on
Your tariff depends on when you applied to connect your system.
| You applied to interconnect | Your plan | How exports are credited |
|---|---|---|
| Before April 15, 2023 | NEM 1.0 or NEM 2.0 (Schedule NEM2) | kWh netting against imports; non-bypassable charges on every kWh imported4 |
| April 15, 2023 to December 31, 2027 | Solar Billing Plan (Schedule NBT) with a nine-year lock | Hourly export values locked for nine years, plus the ACC Plus adder for your application year |
| After December 31, 2027 | Solar Billing Plan without the lock | Hourly export values from the current calculator1 |
Customers on NEM 1.0 or NEM 2.0 keep that tariff for 20 years from the year their system was first interconnected; then they move to the Solar Billing Plan.4 The California Public Utilities Commission's decision behind the change, and how it applies across the three big utilities, is explained on our California Net Billing Tariff page.
| Rule | What applies |
|---|---|
| Program type | Net billing |
| Program | Net Billing Tariff (Schedule NBT, "Solar Billing Plan") |
| Export credit | Hourly Avoided Cost Calculator export values; ACC Plus adder of $0.0088/kWh for 2026 applications1 |
| Netting interval | None |
| Unused credits and charges | Annual true-up; leftover credit rolls forward by default, check on request if over $1 |
How the Solar Billing Plan credits exports
On the Solar Billing Plan, PG&E's meter records imports and exports on separate channels and does not net them.1 Imports are billed at your E-ELEC time-of-use rate; exports earn an export compensation rate for the hour in which they leave your home.
Those rates come from the CPUC's Avoided Cost Calculator. For customers who submit a complete interconnection application between April 15, 2023 and December 31, 2027, PG&E locks in a nine-year schedule of hourly values from the calculator adopted as of January 1 of the application year.1 PG&E publishes the values on a price sheet for each vintage. In the 2026 sheet, the generation value of an exported kilowatt-hour runs from $0.00000 to $1.04281 depending on the hour and month, and the delivery value from $0.00001 to $0.35038, with the highest values on late-summer evenings.5
Panels produce most at midday, when the values are low. Power used at home avoids a purchase at the full time-of-use price instead, which is why the plan favors homes that use their own solar, shift use into sunny hours or store it in a battery.
The ACC Plus adder
Customers who join in the tariff's first five years also get a fixed bonus on every exported kilowatt-hour, which PG&E calls the Energy Export Bonus Credit. It depends on the year of your application and stays the same for nine years from your permission to operate.1
| Application year | Residential adder per exported kWh | Low-income residential adder |
|---|---|---|
| 2023 | $0.02201 | $0.0900 |
| 2024 | $0.0176 | $0.0720 |
| 2025 | $0.0132 | $0.0540 |
| 2026 | $0.0088 | $0.0360 |
| 2027 | $0.0044 | $0.0180 |
All values are from Schedule NBT.1 The adder is not available to non-residential customers or to NEM customers who move to the plan at the end of their legacy period.
Your rate, fixed charges and true-up
Residential Solar Billing Plan customers must take service on E-ELEC (Electric Home), a time-of-use rate.1 E-ELEC carries a Base Services Charge that depends on income: $0.79343 a day in Income Tier 3, where most customers are, $0.39688 in Tier 2 and $0.19713 for CARE customers in Tier 1. The plan itself adds no solar-specific monthly fee for a single account.6
You pay charges net of credits every month, and all charges and credits are trued up once a year. Export credits apply to the per-kWh charges on your imports, except the non-bypassable charges. Any Net Surplus Compensation left at true-up rolls forward to offset later charges unless you ask PG&E for a check, which it issues when the amount is more than $1.1
NEM 2.0 customers
If you applied before April 15, 2023 you are probably on Schedule NEM2, because the Solar Billing Plan's terms start with applications from that date.1 Exports still offset imports kilowatt-hour for kilowatt-hour within the time-of-use periods of your rate, but you pay the non-bypassable charges (public purpose programs, nuclear decommissioning, competition transition and the wildfire fund) on every kilowatt-hour you take from the grid in each metered interval, whatever you export.4 That is why a NEM2 true-up bill is rarely zero.
Community choice aggregation customers
Many PG&E customers buy their power supply from a community choice aggregator such as a city or county program. PG&E's export price sheet says its Energy Produced credits apply only to Solar Billing Plan customers who receive bundled generation service from PG&E.5 If an aggregator supplies your power, the generation part of your export credit comes from that provider's program; PG&E still credits the delivery part.
Applying to connect
PG&E connects rooftop systems under Electric Rule 21. You apply through PG&E's online portal, pay the Rule 21 application fee there, sign the Net Billing Application and Interconnection Agreement, and need final inspection clearance from your city or county before PG&E grants permission to operate. The system must be intended mainly to offset your own use, but you can size it for expected electrification, such as an electric car or heat pump, by signing an oversized generating facility attestation.1
A battery paired with a Solar Billing Plan system gets the same interconnection cost treatment as the solar generator it is paired with.1
PG&E solar by the numbers
PG&E reported 931,269 residential net-metering installations to EIA for 2025, more than any other utility in the country and 41% of all net-metered homes in California. It also reported 177,6782 residential batteries paired with solar. The count includes customers on the older tariffs; utilities may report Net Billing Tariff customers in a separate table.
Source: Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data. EIA-861 utility rows, all technologies; utility names as reported to EIA.
Show the numbers
| Utility | Residential installations |
|---|---|
| Pacific Gas & Electric Co. | 931,269 |
| Southern California Edison Co | 734,901 |
| San Diego Gas & Electric Co | 341,292 |
| Los Angeles Department of Water & Power | 95,898 |
| Sacramento Municipal Util Dist | 63,218 |
| Imperial Irrigation District | 14,066 |
| City of Roseville - (CA) | 13,542 |
| Modesto Irrigation District | 11,986 |
| City of Riverside - (CA) | 7,975 |
| Turlock Irrigation District | 5,418 |
| City of Anaheim - (CA) | 5,351 |
| City of Glendale - (CA) | 3,874 |
| City of Moreno Valley - (CA) | 3,653 |
| Merced Irrigation District | 3,623 |
| City of Pasadena - (CA) | 3,121 |
| City of Redding - (CA) | 2,332 |
| City of Burbank Water and Power - (CA) | 1,899 |
| City of Palo Alto - (CA) | 1,763 |
| Alameda Municipal Power | 1,235 |
| City of Santa Clara - (CA) | 1,233 |
| City of Colton - (CA) | 1,211 |
| PacifiCorp | 998 |
| Liberty Utilities | 931 |
| Bear Valley Electric Service | 684 |
| City of Lodi - (CA) | 643 |
| City of Azusa | 464 |
| City of Shasta Lake - (CA) | 146 |
| City & County of San Francisco - (CA) | 21 |
| City of Corona - (CA) | 20 |
| Surprise Valley Electrification | 18 |
| Date | Where | What changed |
|---|---|---|
| April 15, 2023 | California | Net billing applies to new California solar applications. Customers of the three large investor-owned utilities applying for interconnection on or after April 15, 2023 take service on the Net Billing Tariff.789 |
| December 31, 2027 | California | Last day to apply for California net billing with a nine-year lock. PG&E’s tariff locks nine years of export values for applications submitted through December 31, 2027.1 |
Federal tax credit
A PG&E household buying panels or a battery now weighs the Solar Billing Plan without any federal homeowner credit: §25D covers no expenditure made after December 31, 2025.10 See the federal solar tax credit page, and SCE and SDG&E for the other two utilities on the same tariff.
Questions and answers
Does PG&E buy back solar power?
Yes. On the Solar Billing Plan, exports are credited at hourly export compensation rates from the CPUC's Avoided Cost Calculator. If you end the year with surplus, you can ask PG&E for a check when the remaining Net Surplus Compensation is more than $1.1
What is the PG&E Solar Billing Plan?
It is PG&E's customer-facing name for Schedule NBT, the Net Billing Tariff. Residential customers on it must take the E-ELEC time-of-use rate.1
Will I be moved from NEM 2.0 to the Solar Billing Plan?
Only at the end of your legacy period. NEM2 customers can stay on that schedule for 20 years from the year their system was first interconnected, measured from the date they received permission to operate.4
I buy power from a community choice aggregator. How are my exports credited?
PG&E's 2026 export price sheet says its Energy Produced credits apply only to Solar Billing Plan customers who receive bundled generation service from PG&E.5 Customers of a community choice aggregator get the generation part of their export credit under that provider's own program.
Is there a monthly fixed charge for PG&E solar customers?
E-ELEC carries a Base Services Charge for all customers, solar or not, of $0.79343 a day for most households, lower for income-qualified tiers. The Solar Billing Plan adds no solar-specific monthly fee for a single account.6
Related pages
Sources
- PG&E Electric Schedule NBT – Net Billing Tariff (NBT) Service, Cal. P.U.C. Sheets 55440-E et seq.; Advice 6848-E (eff. 2023-03-01), Advice 7174-E (eff. 2024-02-15); CPUC D.22-12-056, D.23-11-068.
The NBT schedule may also be referred to as the Solar Billing Plan in customer-facing communications. Residential customers, including Load Aggregation Generating/Aggregated Accounts, taking service on NBT must take service on the E-ELEC (ELECTRIC HOME) rate schedule … For both residential and …
Checked November 16, 2026. pge.com - Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data, Net_Metering_2025.xlsx (f8612025.zip), released October 7, 2026. eia.gov
- Census Bureau, Cartographic boundary files, states, cb_2025_us_state_20m. census.gov
- PG&E Electric Schedule NEM2 – Net Energy Metering Service, Cal. P.U.C. Sheet 59228-E (Sheet 46) et seq.; CPUC D.16-01-044.
are eligible to continue receiving service on this NEM2 Schedule for a period of 20 years from the original year in which their Generating Facility was interconnected to PG&E’s grid, indicated by and measured from the date on which the Customer originally received Permission To Operate (PTO) … …
Checked November 16, 2026. pge.com - PG&E Solar Billing Plan – 2026 Energy Export Credit (EEC) Values price sheet, PDF "PGE_Solar Billing Plan_EEC Values Price Sheet 2026.pdf" inside the ZIP.
Pricing reflects the average EEC values determined by the California Public Utilities Commission. ... Energy Produced credits are only applicable to Solar Billing Plan customers who receive bundled generation service from PG&E.
Checked November 16, 2026. pge.com - PG&E Electric Schedule E-ELEC – Residential Time-of-Use (Electric Home), Rates sheet: Advice 7921-E, D.26-04-036, effective 2026-06-01; Special conditions Advice 7846-E effective 2026-03-01; Sheet 61118-E.
Base Services Charge Rates ($ per customer per day) Income Tier 1 $0.19713 (N) Income Tier 2 $0.39688 (N) Income Tier 3 $0.79343 (N)
Checked November 16, 2026. pge.com - CPUC, Net Energy Metering and Net Billing - Key Information. Effective: 2023-04-15.
Since April 15, 2023, customers applying for interconnection have taken service on the new net billing tariff (NBT) pursuant to D.22-12-056 . ... The IOUs refer to the NBT as the “Solar Billing Plan.” ... Pursuant to D.14-03-041 , customer-generators are allowed to remain on the NEM 2.0 tariff for …
Checked November 16, 2026. cpuc.ca.gov - CPUC Decision 22-12-056 (R.20-08-020), Ordering Paragraph 1. Effective: Decision 2022-12-15; tariff 2023-04-15.
A net billing tariff is adopted. Imports and exports will be calculated based on no netting of consumption and production and will be trued-up on an annual basis. ... The ACC Plus will be available to net billing tariff customers during the first five years of the successor tariff, as a glide path. …
Checked November 16, 2026. docs.cpuc.ca.gov - CPUC – Net Billing Tariff page, CPUC web page.
On December 15, 2022, the CPUC adopted D.22-12-056, establishing the Net Billing tariff (NBT) as a successor to NEM2. ... The NBT will apply to customers who submit an interconnection application on or after April 15, 2023.
Checked November 16, 2026. cpuc.ca.gov - 26 U.S.C. §25D, Residential clean energy credit, Text current through Public Law 119-142 (November 10, 2026).
in the case of property placed in service after December 31, 2021, 30 percent … The credit allowed under this section shall not apply with respect to any expenditures made after December 31, 2025. … an expenditure with respect to an item shall be treated as made when the original installation of …
Checked November 16, 2026. uscode.house.gov
Rules are quoted from the official text and dated; how we check them: methodology. Not legal or tax advice. Found an error? Write to [email protected]; corrections are listed on the updates page.