Con Edison net metering and solar credits
Published November 16, 2026. Rules checked November 16, 2026.
- Net metering New York: VDER Phase One net energy metering. kWh net metering with a 20-year term; Customer Benefit Contribution of $1.29 per kW-DC a month in 2026.123
EIA counted 80,412 residential net-metering installations at Con Edison at the end of 2025, 665 of them with a paired battery.4
Tariffs checked November 16, 2026; EIA-861 2025 final data, released October 7, 2026.
Source: Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data; Census Bureau, Cartographic boundary files, states. States shaded by their program type; EIA-861 2025 rows of the utility.
Show the numbers
| State | Residential installations |
|---|---|
| New York (Consolidated Edison Co-NY Inc) | 80,412 |
Con Edison does not buy rooftop solar for cash. Under New York's Phase One net energy metering, each exported kilowatt-hour becomes a kWh credit on the bill, and credits carry over from month to month and year to year for a 20-year term.1 The cost side is a Customer Benefit Contribution: $1.29 per kW-DC a month in 2026 for systems interconnected since 2022.3
Consolidated Edison Company of New York, known as Con Edison, serves more net-metered homes than any other investor-owned utility in New York: 80,4124 residential installations at the end of 2025. Its solar customers follow the statewide rules the Public Service Commission set in its Value of Distributed Energy Resources (VDER) proceeding, so the answers below come from those rules, applied to a Con Edison account.
Does Con Edison buy back solar?
Not in dollars. Con Edison credits a home's surplus solar in kilowatt-hours under Phase One net energy metering (Phase One NEM), the residential compensation the commission adopted in its VDER Phase One order in Case 15-E-0751. NYSERDA's summary of that order describes Phase One NEM as similar to traditional net metering, with two differences: projects are subject to a 20-year term, and credits carry over from month to month and year to year.1
So the question "how much does Con Edison pay for solar" has a two-part answer. An exported kWh is worth whatever a purchased kWh would have cost on the household's rate, because it cancels one later. And a kWh that is never needed is worth nothing in cash: VDER Phase One does not permit the payout of credits at any time, including at the end of a project's annual period.2
| Rule | What applies |
|---|---|
| Program type | Net metering |
| Program | VDER Phase One net energy metering |
| Export credit | kWh net metering with a 20-year term; Customer Benefit Contribution of $1.29 per kW-DC a month in 2026123 |
| Netting interval | Monthly |
| Unused credits and charges | No payout; credits roll forward for the 20-year term |
How the kWh credit moves through a Con Edison bill
Picture the meter running in both directions. On a bright weekday afternoon, panels on a rowhouse roof may produce more than the house is using; the surplus flows to Con Edison's grid and the account gains kWh credits. In the evening, and through most of the winter, the house draws from the grid and those credits are used first. Because the credit is a kilowatt-hour, not a dollar amount, its value rises and falls with the price per kWh on the bill.
Credits that are not used in a month roll to the next month, and a balance left at the end of a year rolls into the following year. That annual carryover continues until the project's compensation term ends: 20 years for Phase One NEM and 25 years for the alternative Phase One Value Stack.2
Two consequences follow for the household:
- No spring reset. A sunny summer's surplus is not wiped out at an anniversary date, as it is in states with annual expiry. Credits banked one year can cover a darker winter or a higher bill later in the term.
- No payment for oversizing. Credits the home never uses are not paid out, so output beyond the home's long-run use earns no cash.2
The value per kWh is high by national standards. New York homes paid an average of 28.60¢ per kWh over the 12 months to August 2026, 6th highest6 among the states. That figure is revenue per kWh with fixed charges included, averaged across all of the state's utilities, so it is not Con Edison's tariff rate; the per-kWh charges on your own bill are what a credit offsets.
A worked year on Phase One NEM
The example below runs one illustrative household through kWh netting with the same code as our export credit calculator. Its usage, solar output and the share used at home are stated on the figure; they are round inputs chosen for a modest city system, not Con Edison data. The energy price is the New York average above, and leftover credits are given no cash value, as Phase One NEM pays none.2
Inputs: 650 kWh a month of use; 6,500 kWh a year of solar output spread over the months as PVWatts models for New York; 40% of output used at home as it is produced; energy price 28.60¢ per kWh (the New York average residential price over the 12 months to August 2026, which includes fixed charges).
| Solar production in a year | 6,500 kWh |
|---|---|
| Used at home as it is produced | 2,600 kWh |
| Sent to the grid (exports) | 3,900 kWh |
| Bought from the grid (imports) | 5,200 kWh |
| Value of solar used at home, at your energy price | $744 |
| Exports credited 1:1 against imports (kWh) | 3,900 kWh |
| Leftover exports at year end (kWh) | 0 kWh |
| Value of exports under this tariff | $1,115 |
| Average credit per exported kWh | 28.6¢ |
| Energy charges for a year without solar | $2,231 |
| Energy charges for a year with solar, before fixed charges | $372 |
Source: National Laboratory of the Rockies (formerly NREL), PVWatts v8 model estimates; Energy Information Administration, Electricity retail sales, residential average price. Export treatment from the tariff cited in the text (Enter what your utility pays for leftover credits, if anything.). An illustration of the crediting rule, not a quote or a savings estimate: fixed charges, minimum bills, taxes and time-of-use prices are not modelled. Try your own numbers in the export credit calculator.
In this case the panels produce less than the home uses over the year, so every exported kWh finds an imported kWh to cancel and none are left over. The figure covers energy charges only: it leaves out the monthly customer charge and the Customer Benefit Contribution described next. Enter your own numbers in the calculator to test a different system size.
The $1.29 Customer Benefit Contribution
Residential and small commercial customers who interconnect solar on or after January 1, 2022 are billed a Customer Benefit Contribution (CBC). It is calculated on the system's DC size, does not apply to systems interconnected before January 1, 2022, and its rate changes annually; customers do not lock in a rate when the system is connected.3
For 2026, the published Con Edison residential rate for net-metered systems is $1.29 per kW-DC per month.3 The monthly amount is that rate times the kilowatts of DC panel capacity, so it depends on how large the array is, not on how much it exported that month. A cloudy December carries the same CBC as a sunny June.
The rate differs across the state's utilities. NYSERDA's 2026 table of utility CBC rates lists Con Edison's $1.29 above LIPA's $1.13 and Orange & Rockland's $1.00, and below Central Hudson's $1.67 and RG&E's $1.31.3 The full utility-by-utility list is on the New York net metering page.
| Date | Where | What changed |
|---|---|---|
| January 1, 2022 | New York | New York adds a Customer Benefit Contribution for new solar. Residential solar interconnected on or after January 1, 2022 pays a monthly charge per kW-DC that changes every year.3 |
Systems connected before 2022
A Con Edison street can have two kinds of solar bill. The CBC does not apply to customers who interconnected solar before January 1, 2022.8 A system connected before that date pays no CBC; one connected on or after it pays the charge per kW-DC every month, at that year's rate.3
For Phase One NEM projects, the other date to note is the end of the 20-year term: annual carryover of credits is permitted until that term ends.12
Con Edison solar in numbers
Roughly a third of New York's net-metered homes (32%) are on Con Edison's system: 80,412 residential installations adding up to 464 MW at the end of 2025. Only the Long Island Power Authority territory on Long Island counts more, 96,0424.
| Long Island Power Authority | 96,042 | 38.0% | 696.8 | 2,371 |
|---|---|---|---|---|
| Consolidated Edison Co-NY Inc | 80,412 | 31.8% | 463.6 | 665 |
| Niagara Mohawk Power Corp. | 27,798 | 11.0% | 220.7 | 0 |
| Central Hudson Gas & Elec Corp | 18,227 | 7.2% | 150.7 | 0 |
| Orange & Rockland Utils Inc | 14,015 | 5.5% | 109.0 | 962 |
| New York State Elec & Gas Corp | 12,700 | 5.0% | 109.3 | 684 |
| Rochester Gas & Electric Corp | 3,419 | 1.4% | 28.8 | 104 |
| FirstEnergy Pennsylvania Electric Co | 13 | 0.0% | 0.1 | 0 |
Source: Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data. Largest 8 of 9 utilities reporting residential net metering.
Batteries are rare on Con Edison solar homes so far: 665 residential installations paired with storage, against 2,371 on Long Island and 4,7864 statewide. EIA counts installations, not customers on a particular rate, and the counts cover all net-metered systems regardless of when they were connected.
New York as a whole had 266,0594 net-metering customers at the end of 2025, up from 145,5689 in 2020. Only 41.2%10 of the state's occupied homes are owner-occupied single-family houses, which limits how many households can put panels on a roof they own.
Tax credits for Con Edison customers
New York's own income tax credit for solar equipment still applies. It equals 25% of qualified solar energy system equipment expenditures and is limited to $5,000; it is not refundable, but any amount above the tax due can be carried over for up to five years.11 The Department of Taxation and Finance page sets out who qualifies.
The state credit has outlived its federal counterpart. Federal §25D covers no expenditure made after December 31, 2025, and the IRS treats a deposit paid in 2025 on a system finished in 2026 as a 2026 expenditure.13 A 2025 federal credit too large for that year's tax rolls into the next year, much as the state credit's five-year carryover does.1211
Leased systems and PPAs are a large slice of New York solar: third-party owners reported residential customers equal to about 31%4 of the state's net-metered homes. For those households the tax position is the owner's, under §48E; a solar project whose construction starts after July 4, 2026 has to be in service by December 31, 2027 for the owner to claim it.1415 The household claims nothing, and any pass-through is a term of the contract. More on the federal solar tax credit page; this is not tax advice.
Questions and answers
Does Con Edison have net metering?
Yes. Residential solar at Con Edison and New York's other investor-owned utilities is compensated under VDER Phase One net energy metering, which is similar to earlier net metering except that projects are subject to a 20-year term and credits carry over from month to month and year to year.1
Does Con Edison pay for excess solar power?
No cash is paid. VDER Phase One does not permit the payout of credits at any time, including at the end of a project's annual period; unused credits carry over until the end of the 20-year Phase One NEM term.2
What is the Customer Benefit Contribution on a Con Edison solar bill?
It is a monthly billing item for residential and small commercial solar interconnected on or after January 1, 2022, calculated on the system's DC size. Con Edison's 2026 residential rate for net-metered systems is $1.29 per kW-DC per month, and the rate changes every year.3
What solar incentives can Con Edison customers use?
New York's solar energy system equipment credit equals 25% of qualified equipment expenditures, limited to $5,000, with any amount above the tax due carried over for up to five years.11 The federal homeowner credit under §25D does not apply to expenditures made after December 31, 2025.12
Related pages
Sources
- NYSERDA, "Value of Distributed Energy Resources – Phase 1 Order: Highlights for Mass Market and Residential", NY PSC VDER Phase One Order, Case 15-E-0751 (March 9, 2017).
Phase One NEM is similar to NEM compensation except: − Phase One NEM projects are subject to a 20-year term − Credits will carry over from month to month and year to year − After a 20-year peri[od] ...
Checked November 16, 2026. nyserda.ny.gov - NYSERDA, VDER Frequently Asked Questions, NYSERDA FAQ.
VDER Phase One does not permit the payout of credits at any time including at the end of a project’s annual period. Annual carryover of credits under VDER Phase One is permitted until the end of the project’s Phase One compensation term of 20 years for Phase One NEM and 25 years for Phase One Value Stack.
Checked November 16, 2026. nyserda.ny.gov - NYSERDA NY-Sun, "2026 Utility Published Customer Benefit Contribution Rates" (SUN-RSC-cbc-fs-1-v8, 4/26), NY PSC Order Addressing Customer Benefit Contribution Charges (Case 15-E-0751); utility statements filed with DPS.
Utility 2026 Final Residential CBC Rate $/kW-mo. ... Central Hudson $1.67 ... Con Edison $1.29 ... LIPA $1.13 ... National Grid $0.97 ... NYSEG $1.19 ... Orange & Rockland $1.00 ... RG&E $1.31 … Residential and small commercial customers who interconnect solar PV at their site on or after January …
Checked November 16, 2026. nyserda.ny.gov - Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data, Net_Metering_2025.xlsx (f8612025.zip), released October 7, 2026. eia.gov
- Census Bureau, Cartographic boundary files, states, cb_2025_us_state_20m. census.gov
- Energy Information Administration, Electricity retail sales, residential average price, electricity/retail-sales, sector RES, released October 23, 2026. eia.gov
- National Laboratory of the Rockies (formerly NREL), PVWatts v8 model estimates, Typical-year weather (NSRDB), state mean center of population. pvwatts.nlr.gov
- NYSERDA, Utility-Published 2026 Customer Benefit Contribution Rates (NYSERDA document SUN-RSC-cbc-fs-1-v8, April 2026). Effective: 2026.
Residential and small commercial customers who interconnect solar PV at their site on or after January 1, 2022 will be subject to a new Customer Benefit Contribution (CBC) billing item ... The CBC is calculated based on a project’s DC system size and will not apply to customers who interconnected …
Checked November 16, 2026. nyserda.ny.gov - Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, net metering 2010–2025, Net_Metering sheets of the annual files, released October 7, 2026. eia.gov
- Census Bureau, American Community Survey 2025 1-year estimates, table B25032, B25032, released September 10, 2026. data.census.gov
- NYS Dept. of Taxation and Finance, Solar energy system equipment credit. Effective: page updated 2019-12-16.
The credit is equal to 25% of your qualified solar energy system equipment expenditures and is limited to $5,000. The solar energy system equipment credit is not refundable. However, any credit amount in excess of the tax due can be carried over for up to five years.
Checked November 16, 2026. tax.ny.gov - 26 U.S.C. §25D, Residential clean energy credit, Text current through Public Law 119-142 (November 10, 2026).
in the case of property placed in service after December 31, 2021, 30 percent … The credit allowed under this section shall not apply with respect to any expenditures made after December 31, 2025. … an expenditure with respect to an item shall be treated as made when the original installation of …
Checked November 16, 2026. uscode.house.gov - IRS Fact Sheet FS-2025-05, FAQs for modification of sections 25C, 25D, 25E, 30C, 30D, 45L, 45W and 179D under Public Law 119-21, August 21, 2025.
If installation is completed after December 31, 2025, the expenditure will be treated as made after December 31, 2025, which will prevent the taxpayer from claiming the section 25D credit.
Checked November 16, 2026. irs.gov - Public Law 119-21 (July 4, 2025), sections 70506 and 70513, 139 Stat. 72.
Section 25D(h) is amended by striking ``to property placed in service after December 31, 2034'' and inserting ``with respect to any expenditures made after December 31, 2025'' … shall apply to facilities the construction of which begins after the date which is 12 months after the date of enactment of this Act
Checked November 16, 2026. govinfo.gov - 26 U.S.C. §48E, Clean electricity investment credit, Text current through Public Law 119-142 (November 10, 2026).
with a maximum net output of less than 1 megawatt (as measured in alternating current) … This section shall not apply to any qualified property placed in service by the taxpayer after December 31, 2027, which is part of an applicable facility. … This paragraph shall not apply with respect to any …
Checked November 16, 2026. uscode.house.gov
Rules are quoted from the official text and dated; how we check them: methodology. Not legal or tax advice. Found an error? Write to [email protected]; corrections are listed on the updates page.