Menu

APS solar buyback: the RCP export rate, tranche by tranche

Published November 16, 2026. Rules checked November 16, 2026.

  • Net billing Arizona: Rate Rider RCP (Resource Comparison Proxy export rate). $0.05554/kWh for the 2026 tranche, locked for 10 years.12

EIA counted 190,481 residential net-metering installations at APS at the end of 2025, 8,770 of them with a paired battery.3

Tariffs checked November 16, 2026; EIA-861 2025 final data, released October 7, 2026.

Where APS serves net-metered customers
States where APS reports net-metering customers

Source: Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data; Census Bureau, Cartographic boundary files, states. States shaded by their program type; EIA-861 2025 rows of the utility.

Show the numbers
StateResidential installations
Arizona (Arizona Public Service Co)190,481

APS buys back rooftop solar, but not through net metering for new systems: under Rate Rider RCP every kilowatt-hour that leaves the home earns a fixed export rate, $0.05554 per kWh for customers in the 2026 tranche, from September 1, 2026 through August 31, 2027. That rate stays with the customer for 10 years from interconnection; homes net metered before the RCP keep their old rider for up to 20 years.12

What APS credits for an exported kilowatt-hour

Arizona Public Service credits new solar customers under Rate Rider RCP, the Resource Comparison Proxy export rate (A.C.C. No. 6248, Revision No. 11, effective September 1, 2026). The rider's wording is plain: APS will "meter this Export Energy on an instantaneous basis and provide a monthly bill credit based on the purchase rate in this schedule."1

That makes the RCP net billing: each exported kWh earns a separate export rate instead of cancelling a kWh bought from APS. Solar power the home uses at the moment it is produced never reaches the meter as an import, so it avoids the full price of grid power. Only the surplus flowing out at that instant is credited at the RCP rate, and nothing is netted over the hour, day or month.1

For customers in the 2026 tranche, from September 1, 2026 through August 31, 2027, that rate is $0.05554 per kWh.1 For scale, Arizona households paid an average of 15.39¢ per kWh5 for grid power over the 12 months to August 2026, an average that includes fixed charges and is not an APS tariff rate.

APS in Arizona: solar export rules
RuleWhat applies
Program typeNet billing
ProgramRate Rider RCP (Resource Comparison Proxy export rate)
Export credit$0.05554/kWh for the 2026 tranche, locked for 10 years12
Netting intervalNone (instantaneous)
Unused credits and chargesCredits roll to the next bill; balances over $25 paid by check after December

Your tranche, not today's rate, sets your credit

APS sets a new RCP rate for each annual tranche of new solar customers, effective September 1, and the rate may not be reduced by more than 10% a year.1 Each household keeps the rate of its own tranche, so APS customers with identical systems on the same street can be credited different amounts for the same kWh.

TrancheRCP export rate per kWh, kept 10 years1
2017$0.12900
2018$0.11610
2019–2020$0.10450
2021$0.09405
2022$0.08465
2023$0.07619
2024$0.06857
2025 (September 1, 2025 through August 31, 2026)$0.06171
2026 (September 1, 2026 through August 31, 2027)$0.05554

One rate covered both 2019 and 2020; every other annual step has cut it, and the 2026 rate is the full 10% below the 2025 rate.1

The tranche you land in depends on when you submit the interconnection application, not when the panels switch on. The rate in effect at submission holds if installation and approval by the local permitting authority follow within 180 days, or 270 days when a third party or APS causes the delay.1 An application submitted in August, before the September 1 reset, can therefore secure the outgoing tranche's higher rate if that window is met.

The same home in two tranches

The two worked examples below run one illustrative APS household through the RCP. Its usage, solar output and share of output used at home are printed on each figure; they are our inputs, not typical values. The first figure uses the 2026 tranche rate of $0.05554 per kWh; the second keeps everything else equal and applies the 2019–2020 tranche rate of $0.10450.1 Both use the same code as our export credit calculator.

Worked example: APS RCP, 2026 tranche

Inputs: 1,000 kWh a month of use; 10,000 kWh a year of solar output spread over the months as PVWatts models for Arizona; 30% of output used at home as it is produced; energy price 15.39¢ per kWh (the Arizona average residential price over the 12 months to August 2026, which includes fixed charges).

Solar production in a year10,000 kWh
Used at home as it is produced3,000 kWh
Sent to the grid (exports)7,000 kWh
Bought from the grid (imports)9,000 kWh
Value of solar used at home, at your energy price$462
Value of exports under this tariff$389
Average credit per exported kWh5.554¢
Energy charges for a year without solar$1,847
Energy charges for a year with solar, before fixed charges$996

Source: National Laboratory of the Rockies (formerly NREL), PVWatts v8 model estimates; Energy Information Administration, Electricity retail sales, residential average price. Export treatment from the tariff cited in the text. An illustration of the crediting rule, not a quote or a savings estimate: fixed charges, minimum bills, taxes and time-of-use prices are not modelled. Try your own numbers in the export credit calculator.

Worked example: APS RCP, 2019–2020 tranche

Inputs: 1,000 kWh a month of use; 10,000 kWh a year of solar output spread over the months as PVWatts models for Arizona; 30% of output used at home as it is produced; energy price 15.39¢ per kWh (the Arizona average residential price over the 12 months to August 2026, which includes fixed charges); export value 10.45¢ per kWh.

Solar production in a year10,000 kWh
Used at home as it is produced3,000 kWh
Sent to the grid (exports)7,000 kWh
Bought from the grid (imports)9,000 kWh
Value of solar used at home, at your energy price$462
Value of exports under this tariff$732
Average credit per exported kWh10.45¢
Energy charges for a year without solar$1,847
Energy charges for a year with solar, before fixed charges$654

Source: National Laboratory of the Rockies (formerly NREL), PVWatts v8 model estimates; Energy Information Administration, Electricity retail sales, residential average price. Export treatment from the tariff cited in the text. An illustration of the crediting rule, not a quote or a savings estimate: fixed charges, minimum bills, taxes and time-of-use prices are not modelled. Try your own numbers in the export credit calculator.

The self-consumed share is valued identically in both, because it simply avoids buying power. The difference lies entirely in the exported kWh, which is why, for an APS customer applying today, the share of output used on site matters more than it did for one who applied in 2019.1 Moving loads such as pool pumps, laundry or car charging into sunny hours raises that share; a battery can carry midday output into the evening. APS reported 8,7703 residential batteries paired with net-metered solar at the end of 2025.

Where the credit goes on the bill

RCP credits are dollars, not kilowatt-hours. They apply against the month's APS bill, and any credit left over rolls to the next month's bill.7 The yearly settlement comes after the December bill: if the remaining export credits exceed $25, APS issues a check automatically; if not, they carry forward to the following year.1

Customers still on the frozen net metering rider, EPR-6 (A.C.C. No. 6194, effective March 8, 2024), are credited differently. Their exports are netted against kilowatt-hours used within the month, by on-peak and off-peak period on a time-of-use plan, and banked to later bills. After the December billing cycle, any export energy not yet netted is bought for a bill credit at $0.02895 per kWh.2 On EPR-6, a kWh exported in spring that offsets a summer kWh is worth the retail energy price; one still unused at year-end is bought for less than any RCP tranche rate.

Keeping your rate: 10 years, 20 years and system changes

The lock on an RCP rate runs for 10 years from interconnection. After that the customer's rate floats with the current annual RCP rate. The first tranche dates from 2017, so the earliest RCP customers reach the end of their locks from 2027 onward and move to whatever tranche rate is current at the time.12

The frozen Legacy EPR-6 rider covers homes that were net metered before the 2017 change. APS's transition page tells them their "current solar buyback rate lasts 20 years from the date your system was connected to the APS grid."8 The rider itself says a residential customer "may remain on this rate rider for up to 20 years from the date their solar generator was interconnected."12

Enlarging the system can cost an RCP customer the lock. A material increase in capacity, "increasing the capacity by 10% or 1 kW-ac, whichever is greater", resets the locked RCP rate.1

Eligibility and applying

The RCP rider covers solar photovoltaic generation located on the customer's premises, behind the billing meter, and serving the residential customer's own load. Systems are subject to the Arizona Administrative Code's distributed generation interconnection rules and APS's Interconnection Manual.1

The current Rate Rider RCP and the frozen Rider EPR-6 are published on APS's site, and its renewable energy riders page summarizes them.2798 Because the application date fixes the tranche, keep the date on which the interconnection application was submitted.1

The vacated grid access charge

The Arizona Corporation Commission had approved a solar-specific grid access charge for APS residential solar customers. In June 2026 the Arizona Court of Appeals vacated the Commission's December 2024 Rehearing Decision and the underlying charges, and remanded the matter to the Commission for further proceedings, as the Arizona Attorney General announced on June 16, 2026.10 What replaces the charge, if anything, is for the Commission to decide on remand.

What changed and when
DateWhereWhat changed
June 2026ArizonaCourt of Appeals vacates APS’s solar grid access charge. The Arizona Court of Appeals vacated the charge for APS residential solar customers and remanded it to the Corporation Commission.10
September 1, 2026ArizonaAPS sets its 2026 RCP export rate. The RCP export rate for the 2026 tranche is $0.05554/kWh, locked for 10 years.1

APS rooftop solar in numbers

More Arizona solar homes are on APS than on every other utility combined: 57% of the state's residential net-metered installations, 190,481 homes and 1,726 MW at the end of 2025. Ranked by utility and state, that count is the 4th3 largest in the country.

Residential net-metering installations by utility, Arizona, 2025
UNS Electric, Inc11,432
Trico Electric Cooperative Inc5,993
Electrical Dist No3 Pinal County3,713

Source: Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data. EIA-861 utility rows, all technologies; utility names as reported to EIA.

Show the numbers
UtilityResidential installations
Arizona Public Service Co190,481
Salt River Project63,437
Tucson Electric Power Co54,719
UNS Electric, Inc11,432
Trico Electric Cooperative Inc5,993
Electrical Dist No3 Pinal County3,713
Mohave Electric Cooperative, Inc.2,357
Sulphur Springs Valley E C Inc1,174
Navopache Electric Coop, Inc567
City of Mesa - (AZ)184
Garkane Energy Coop, Inc31
Ajo Improvement Co18
Dixie Escalante R E A, Inc10
Morenci Water and Electric1

APS's 2026 tranche rate sits among the export credits of other utilities' launch tariffs in the comparison below, each set against its state's average residential price.

Export credits per kWh compared with the average residential price
SMUD (California): Solar and Storage Rate9.60¢
California average residential price32.34¢
Nevada Power (NV Energy): Tier 4, from July 1, 20268.72¢
Nevada average residential price13.45¢
Georgia Power: instantaneous netting, 20267.22¢
Georgia average residential price15.17¢
Dominion Energy Virginia: NEM 2.0 (from about May 2027)5.83¢
Virginia average residential price16.64¢
APS (Arizona): RCP, 2026 tranche5.55¢
Arizona average residential price15.39¢
TEP (Arizona): RCP from October 1, 20264.62¢
Arizona average residential price15.39¢
Rocky Mountain Power (Utah): Schedule 1374.31¢ (year average)
Utah average residential price13.26¢
SRP (Arizona): export-rate plans from May 20261.87¢
Arizona average residential price15.39¢

Source: Energy Information Administration, Electricity retail sales, residential average price. Export credits from the utility tariffs cited on this page; seasonal credits shown as a 12-month average. Average price: revenue divided by kWh, 12 months to August 2026, all charges included.

Show the numbers
TariffExport credit (¢/kWh)State average price (¢/kWh)
SMUD (California): Solar and Storage Rate9.60032.34
Nevada Power (NV Energy): Tier 4, from July 1, 20268.71713.45
Georgia Power: instantaneous netting, 20267.21915.17
Dominion Energy Virginia: NEM 2.0 (from about May 2027)5.82916.64
APS (Arizona): RCP, 2026 tranche5.55415.39
TEP (Arizona): RCP from October 1, 20264.62015.39
Rocky Mountain Power (Utah): Schedule 1374.30713.26
SRP (Arizona): export-rate plans from May 20261.87015.39

Tax credits for APS customers

Arizona's own credit for a solar energy device on the taxpayer's residence "is equal to twenty-five percent of the cost of the device", and "the maximum credit in a taxable year may not exceed one thousand dollars", per A.R.S. §43-1083.11

That state credit is now the only income tax credit for a system an APS customer buys. Federal §25D stopped with expenditures made after December 31, 2025, and the IRS dates an expenditure by when installation is completed, so a 2026 tranche customer who paid in 2025 is still outside it.13 An unused federal credit from a 2025 system keeps rolling to the next tax year.12

Third-party-owned systems are common in Arizona: third-party owners reported 103,4513 Arizona homes in 2025. Under a lease or power purchase agreement the system owner, not the household, may claim the §48E investment credit; for solar that credit does not apply to property placed in service after December 31, 2027 when construction begins after July 4, 2026.1415 The lessee claims no federal credit, and whether any of the owner's credit is reflected in the payment depends on the contract. The federal solar tax credit page covers both credits; the Arizona page compares APS with TEP and SRP.

Questions and answers

Does APS buy back solar power?

Yes. APS meters the energy a solar home exports on an instantaneous basis and gives a monthly bill credit at the purchase rate in Rate Rider RCP.1

What was the APS solar buyback rate in 2025?

The 2025 tranche, for customers whose application fell between September 1, 2025 and August 31, 2026, is $0.06171 per kWh. The 2026 tranche, which began September 1, 2026, is $0.05554 per kWh.1

What is the APS net metering grandfather period?

A residential customer on the frozen net metering rider, EPR-6, may remain on it for up to 20 years from the date the solar generator was interconnected. RCP customers keep their initial RCP rate for 10 years from interconnection.12

Does APS send a check for unused solar credits?

After the December bill, if the remaining export credits exceed $25, APS issues a check automatically; otherwise the credits carry forward to the following year.1

Will adding panels change my APS export rate?

It can. A material increase in capacity, defined as 10% or 1 kW-ac, whichever is greater, resets the locked RCP rate.1

Related pages

Sources

  1. APS Rate Rider RCP – Partial Requirements Service for New On-Site Solar DG, Resource Comparison Proxy Export Rate, A.C.C. No. 6248, Revision No. 11, effective September 1, 2026 in ACC Decision No. 82122. The Company will meter this Export Energy on an instantaneous basis and provide a monthly bill credit based on the purchase rate in this schedule. … Tranche 2025 September 1, 2025 through August 31, 2026 $0.06171 per kWh Tranche 2026 September 1, 2026 through August 31, 2027 $0.05554 per kWh … An … Checked November 16, 2026. aps.com
  2. APS Rate Rider EPR-6 Legacy (Frozen) – Net Metering, A.C.C. No. 6194, Revision No. 2, effective March 8, 2024 in Decision No. 79293. Each Customer’s initial RCP rate will be applicable for 10 years from the time of their interconnection. ... A residential Customer may remain on this rate rider for up to 20 years from the date their solar generator was interconnected … After the December billing cycle, any export energy that has … Checked November 16, 2026. aps.com
  3. Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data, Net_Metering_2025.xlsx (f8612025.zip), released October 7, 2026. eia.gov
  4. Census Bureau, Cartographic boundary files, states, cb_2025_us_state_20m. census.gov
  5. Energy Information Administration, Electricity retail sales, residential average price, electricity/retail-sales, sector RES, released October 23, 2026. eia.gov
  6. National Laboratory of the Rockies (formerly NREL), PVWatts v8 model estimates, Typical-year weather (NSRDB), state mean center of population. pvwatts.nlr.gov
  7. APS, Renewable Energy Riders (RCP Export Rider, EPR-6, Legacy EPR-6). aps Resource Comparison Proxy (RCP) is a net billing solar purchase energy rider, it measures the excess power you don't use and gives you a monthly bill credit based on the current RCP purchase rate. The credit will apply towards your APS billed amount for that month, and any remaining credit will … Checked November 16, 2026. aps.com
  8. APS, Solar Energy Credit Transition. Effective: 2017 (ACC Decision No. 75859, Docket E-00000J-14-0023). In 2017, the Arizona Corporation Commission changed how customers are credited for excess energy sent to the grid from rooftop solar systems. ... Your current solar buyback rate lasts 20 years from the date your system was connected to the APS grid. Checked November 16, 2026. aps.com
  9. Tucson Electric Power, Resource Comparison Proxy Export Rate. Effective: 2026-10-01. customers are compensated for up to 10 years at the RCP export rate in place at the time they requested interconnection of a new solar power system. ... An energy export rate of $0.0462 per kWh will remain in effect from October 1, 2026 through September 30, 2027. ... Rules approved by the ACC call … Checked November 16, 2026. tep.com
  10. Arizona Attorney General press release, "Court of Appeals Sides with Attorney General Mayes, Vacates Corporation Commission’s Solar Surcharge on APS Customers" (June 16, 2026), Ariz. Ct. App. Div. One memorandum decision, June 2026. The Court vacated the Commission’s December 2024 Rehearing Decision and the underlying charges, and remanded to the Commission for further proceedings. Checked November 16, 2026. azag.gov
  11. A.R.S. §43-1083 Credit for solar energy devices. The credit is equal to twenty-five percent of the cost of the device. B. The maximum credit in a taxable year may not exceed one thousand dollars. Checked November 16, 2026. azleg.gov
  12. 26 U.S.C. §25D, Residential clean energy credit, Text current through Public Law 119-142 (November 10, 2026). in the case of property placed in service after December 31, 2021, 30 percent … The credit allowed under this section shall not apply with respect to any expenditures made after December 31, 2025. … an expenditure with respect to an item shall be treated as made when the original installation of … Checked November 16, 2026. uscode.house.gov
  13. IRS Fact Sheet FS-2025-05, FAQs for modification of sections 25C, 25D, 25E, 30C, 30D, 45L, 45W and 179D under Public Law 119-21, August 21, 2025. If installation is completed after December 31, 2025, the expenditure will be treated as made after December 31, 2025, which will prevent the taxpayer from claiming the section 25D credit. Checked November 16, 2026. irs.gov
  14. 26 U.S.C. §48E, Clean electricity investment credit, Text current through Public Law 119-142 (November 10, 2026). with a maximum net output of less than 1 megawatt (as measured in alternating current) … This section shall not apply to any qualified property placed in service by the taxpayer after December 31, 2027, which is part of an applicable facility. … This paragraph shall not apply with respect to any … Checked November 16, 2026. uscode.house.gov
  15. Public Law 119-21 (July 4, 2025), sections 70506 and 70513, 139 Stat. 72. Section 25D(h) is amended by striking ``to property placed in service after December 31, 2034'' and inserting ``with respect to any expenditures made after December 31, 2025'' … shall apply to facilities the construction of which begins after the date which is 12 months after the date of enactment of this Act Checked November 16, 2026. govinfo.gov

Rules are quoted from the official text and dated; how we check them: methodology. Not legal or tax advice. Found an error? Write to [email protected]; corrections are listed on the updates page.