Pepco net metering in DC and Maryland

Published November 16, 2026. Rules checked November 16, 2026.

  • Net metering District of Columbia: Net energy metering (15 DCMR ch. 9). Monthly excess credited in kWh to the next bill.1
  • Net metering Maryland: Net energy metering (PUA §7-306). Billing-cycle kWh netting at retail.2

EIA counted 79,217 residential net-metering installations at Pepco at the end of 2025.3

Tariffs checked November 16, 2026; EIA-861 2025 final data, released October 7, 2026.

Where Pepco serves net-metered customers
States where Pepco reports net-metering customers

Source: Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data; Census Bureau, Cartographic boundary files, states. States shaded by their program type; EIA-861 2025 rows of the utility.

Show the numbers
StateResidential installations
District of Columbia (Potomac Electric Power Co)33,118
Maryland (Potomac Electric Power Co)46,099

Pepco buys back home solar through net metering on both sides of the District line: an exported kilowatt-hour becomes a kilowatt-hour credit on a later bill. What differs is the leftover. DC settles it each December at the generation rate, while Maryland customers choose an April payout or open-ended accrual, and Maryland's tariff stays open to new systems only until the earlier of 3,000 MW statewide or July 1, 2027.12

Potomac Electric Power Company, Pepco, reports net-metered customers in two jurisdictions, the District of Columbia and Maryland. Net metering applies in both, but under two different instruments: in DC, Chapter 9 of Title 15 of the District's municipal regulations, written by the DC Public Service Commission;1 in Maryland, Public Utilities §7-306 of the state code.2 Two Pepco solar homes on either side of the District line are billed by the same company under different year-end rules.

What Pepco credits for exported solar, side by side

In both jurisdictions an exported kilowatt-hour is credited as a kilowatt-hour, not at a separate export rate, so during the year it is worth what the home would have paid for that kWh of usage. Cash enters only for credits left over at the year-end point, and the two rulebooks set that point and its value differently.

District of ColumbiaMaryland
Rule15 DCMR ch. 9, Net Energy MeteringPublic Utilities §7-306
NettingMonthly; excess credited in kWh to the next billBilling cycle; a negative kWh reading is net excess generation
What credits offsetKilowatt-hour usage charges onlyUsage; in a month of net excess the bill carries customer charges only5
Year-end pointDecember, end of the calendar yearThe billing cycle completed just before the end of April, or none if the customer accrues indefinitely
Value of leftover kWhGeneration rate only, for excess above 100% of annual consumptionGeneration or commodity portion of the rate, averaged over the prior 12 months
SizeAllowable Generation Threshold of 200% of historical 12-month usage from 20241Up to 2 MW2

In neither case is the leftover valued at the full retail price: DC pays the generation rate only, and Maryland the generation or commodity portion of the rate.1 A Maryland household that buys supply from a competitive supplier has its payout valued at that supplier's rate.2

District of Columbia: one calendar year, settled in December

Pepco is the only utility reporting residential net-metered installations in the District: it reported 33,118 residential installations to EIA for 2025, 100%3 of the city's total. The rules it applies sit in 15 DCMR §§ 902–903, compiled April 7, 2025.1

Pepco in District of Columbia: solar export rules
RuleWhat applies
Program typeNet metering
ProgramNet energy metering (15 DCMR ch. 9)
Export creditMonthly excess credited in kWh to the next bill1
Netting intervalMonthly
Unused credits and chargesDecember: excess beyond 100% of annual use paid at the generation rate; credits over $25 refunded

Each month Pepco compares what the home drew from the grid with what the panels sent out. A surplus month ends with a kWh credit on the next bill, and that credit is limited in what it can pay: "Net energy billing applies only to kilowatt-hour usage charges." Charges recovered through fixed amounts or through units other than kilowatt-hours stay on the bill whatever the panels produce.1

December closes the year. Generation above 100% of the year's consumption is compensated "at the generation rate only, per kWh", and when the resulting credit is greater than $25, Pepco is directed to refund it to the customer.1

The sizing rule pulls in the other direction. The Commission raised its Allowable Generation Threshold each year, from 120% of historical 12-month usage in 2020 to 200% in 2024, subject to utility reliability filings. A DC system can therefore be built well beyond the home's annual use, but every kWh it produces past 100% of that use is valued at the December generation rate, below what the same kWh earns when it offsets usage.1

The District's net-metering base grew from 8,742 customers of all kinds in 2020 to 34,3203 in 2025, a rise of 293%6. The District of Columbia net metering page walks through the regulation in more detail.

Net-metering customers in District of Columbia, 2010–2025
Net-metering customers in District of Columbia, 2010–2025010K20K30K201020132016201920222025

Source: Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, net metering 2010–2025. Customers on a net-metering tariff, all sectors and technologies, end of each year. EIA counted meters in 2010–2012, customers in 2013–2024 and installations in 2025; customers on net billing may be reported outside this count.

Show the numbers
YearCustomers
2010277
2011418
2012638
20131,124
20141,522
20151,602
20162,985
20173,623
20184,741
20196,692
20208,742
202110,973
202212,958
202315,537
202429,387
202534,320

Maryland: April payout or credits that never settle

Pepco's Maryland customers are on the statutory net metering tariff that Maryland's investor-owned utilities offer: Baltimore Gas and Electric, Pepco and Delmarva Power. Net excess generation is defined by the meter: the electricity generated beyond what the home consumed, "that results in a negative kilowatt–hour reading at the end of the eligible customer–generator's billing cycle".2 In such a month the customer is billed only customer charges.5

Pepco in Maryland: solar export rules
RuleWhat applies
Program typeNet metering
ProgramNet energy metering (PUA §7-306)
Export creditBilling-cycle kWh netting at retail2
Netting intervalMonthly
Unused credits and chargesPaid each spring at the average generation rate, or accrued indefinitely

The statute then gives the customer a choice for the credits that pile up:2

  1. The 12-month option. Net excess generation accrues for up to 12 months, in a year that ends with the billing cycle completed immediately before the end of April. The leftover kWh are then multiplied by the generation or commodity portion of the rate the customer would have been charged, averaged over that 12-month period. The payment is due within 30 days.5
  2. Indefinite accrual. Credits carry forward with no annual settlement and are paid out within 15 days when the account closes.2

The choice is about when, if ever, kWh credits turn into cash. Indefinite accrual avoids converting kWh credits into cash at the supply-only rate, at the cost of leaving any surplus unpaid until the account closes.2

The statute caps a net-metered system at 2 MW, with exceptions for some categories.2

Maryland's net metering has an end date

The Maryland tariff is offered first come, first served "until the earlier of" the date customer-generators statewide reach 3,000 megawatts, or July 1, 2027.2 The Public Service Commission must approve a successor framework on or before February 1, 2027, to begin July 1, 2027, and the statute requires that its incentives for distributed generation be less than those of net metering under §7-306.7

What changed and when
DateWhereWhat changed
February 1, 2027MarylandDeadline for Maryland’s successor to net metering. The PSC must approve a successor framework, to begin July 1, 2027.7
July 1, 2027MarylandMaryland’s current net metering closes. The standard tariff is offered until the earlier of 3,000 MW statewide or July 1, 2027.25

The successor's terms, including how it treats systems already on net metering, will be set by the Commission's order or regulation; the current terms are in §7-306 and the successor mandate in §7-306.4, both on the General Assembly's site.72 The Maryland net metering page covers the statute for all of the state's utilities.

Connecting a system to Pepco

In DC, the net metering statute, D.C. Code §34-1518, refers to the interconnection procedures in Chapter 40 of Title 15 of the District's municipal regulations.8 The net metering terms themselves are in the Commission's compiled Chapter 9, which also holds the sizing threshold.1

In Maryland, timing is the main variable for a new application: a place on the net metering tariff goes in order of arrival until the program closes.2 Because the 3,000 MW statewide limit counts too, the program closes before July 1, 2027 if that capacity is reached first.5

Pepco solar in EIA's numbers

Counted together, Pepco's two territories had 79,217 residential net-metering installations (530 MW3) at the end of 2025. Maryland has more of them; the District figure is smaller but covers every net-metered home in the city:

Residential installationsShare of all net-metered homes thereAverage residential price, 12 months to August 2026
District of Columbia33,118100%24.48¢ per kWh
Maryland46,09936%321.18¢ per kWh9

The price column is EIA's average revenue per kWh, fixed charges included, so it is not the rate a kWh credit offsets on a Pepco bill. The District's average was the 10th highest in the country over that period, and Maryland's the 14th highest9.

Among Maryland utilities, Pepco's count is second to Baltimore Gas & Electric Co, with 52,0843:

Residential net-metering installations by utility, Maryland, 2025
Baltimore Gas & Electric Co52,084
Delmarva Power9,870
Southern Maryland Elec Coop Inc9,517
The Potomac Edison Company8,812
Choptank Electric Cooperative, Inc1,450

Source: Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data. EIA-861 utility rows, all technologies; utility names as reported to EIA.

Show the numbers
UtilityResidential installations
Baltimore Gas & Electric Co52,084
Potomac Electric Power Co46,099
Delmarva Power9,870
Southern Maryland Elec Coop Inc9,517
The Potomac Edison Company8,812
Choptank Electric Cooperative, Inc1,450
Easton Utilities Comm52
Hagerstown Light Department38

The federal tax credit for Pepco customers

A Maryland household applying before net metering closes by July 1, 2027, or a DC household sizing a system up to the 200% threshold, does so without the federal homeowner credit.21 Section 25D ended for expenditures made after December 31, 2025, and an expenditure counts as made when installation is completed. A 2025 credit that exceeded that year's tax liability carries forward.10

Ownership differs sharply between the two jurisdictions Pepco serves. Third-party owners reported residential solar customers equal to about 47% of Maryland's net-metered homes, against about 3%3 in the District. Where a company owns the panels, it is that company that may claim §48E, provided a system whose construction begins after July 4, 2026 is in service by December 31, 2027.1112 The household on the lease or PPA claims nothing, and any pass-through is set by contract. The federal solar tax credit page covers the details; this is not tax advice.

Questions and answers

How does Pepco net metering work?

Pepco nets each billing period. In DC, excess generation in a month is credited in kWh to the next bill and can offset only kilowatt-hour usage charges.1 In Maryland, net excess generation is the negative kilowatt-hour reading at the end of the billing cycle, which carries forward as a credit.2

How much does Pepco pay for excess solar in DC?

During the year an exported kWh offsets a kWh of usage. At the end of the calendar year, excess generation above 100% of the year's consumption is compensated at the generation rate only, and Pepco refunds a credit greater than $25.1

What is the Pepco net metering rate in Maryland?

Credits are kilowatt-hours carried from one billing cycle to the next, so they offset usage at the customer's own rate. Excess paid out under the 12-month option is valued at the generation or commodity portion of the customer's rate, averaged over the 12 months ending with the billing cycle completed just before the end of April.2

Can I still get net metering from Pepco in Maryland?

Until the earlier of two dates: when customer-generators statewide reach 3,000 megawatts, or July 1, 2027. The tariff is offered first come, first served until then.2 The Public Service Commission must approve a successor framework on or before February 1, 2027.7

How big can a Pepco solar system be in DC?

The Commission's Allowable Generation Threshold, measured against the customer's historical 12-month usage, rose in steps from 120% in 2020 to 200% in 2024.1

Related pages

Sources

  1. DC Municipal Regulations, Title 15, Chapter 9: Net Energy Metering (compiled, updated 4-7-25), DC PSC, 15 DCMR §§ 902–903 (compiled April 7, 2025). Net energy billing applies only to kilowatt-hour usage charges. Net energy billing customers are responsible for all other charges applicable to the customer’s rate class and recovered through fixed amounts or over units other than kilowatt-hours … At the end of the calendar year (December), excess … Checked November 16, 2026. dcpsc.org
  2. Md. Code Ann., Public Utilities § 7-306 (Maryland General Assembly statute text), PUA § 7-306 (current text as served 2026-11-16). make it available to eligible customer–generators on a first–come, first–served basis until the earlier of: (i) the date on which the rated generating capacity owned and operated by eligible customer–generators in the State reaches 3,000 megawatts; or (ii) July 1, 2027. … “Net excess generation” … Checked November 16, 2026. mgaleg.maryland.gov
  3. Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data, Net_Metering_2025.xlsx (f8612025.zip), released October 7, 2026. eia.gov
  4. Census Bureau, Cartographic boundary files, states, cb_2025_us_state_20m. census.gov
  5. Md. Code, Public Utilities §7-306. on a first–come, first–served basis until the earlier of: (i) the date on which the rated generating capacity owned and operated by eligible customer–generators in the State reaches 3,000 megawatts; or (ii) July 1, 2027. ... the dollar value of net excess generation shall be equal to the generation … Checked November 16, 2026. mgaleg.maryland.gov
  6. Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, net metering 2010–2025, Net_Metering sheets of the annual files, released October 7, 2026. eia.gov
  7. Md. Code, Public Utilities §7-306.4. Effective: successor to begin 2027-07-01. (c) On or before February 1, 2027, the Commission, by order or regulation, shall approve, as a successor program to the net energy metering program under § 7–306 of this subtitle, a framework for a net energy metering program to begin July 1, 2027, that: (1) provides incentives for the development … Checked November 16, 2026. mgaleg.maryland.gov
  8. D.C. Code §34-1518 Net metering; community renewable energy facilities. (4) If electricity generated by the customer-generator and fed back into the electric grid exceeds the electricity supplied by the electricity supplier, the customer generator may receive compensation based on the net metering rules established by the Commission. ... shall follow all procedures for … Checked November 16, 2026. code.dccouncil.gov
  9. Energy Information Administration, Electricity retail sales, residential average price, electricity/retail-sales, sector RES, released October 23, 2026. eia.gov
  10. 26 U.S.C. §25D, Residential clean energy credit, Text current through Public Law 119-142 (November 10, 2026). in the case of property placed in service after December 31, 2021, 30 percent … The credit allowed under this section shall not apply with respect to any expenditures made after December 31, 2025. … an expenditure with respect to an item shall be treated as made when the original installation of … Checked November 16, 2026. uscode.house.gov
  11. 26 U.S.C. §48E, Clean electricity investment credit, Text current through Public Law 119-142 (November 10, 2026). with a maximum net output of less than 1 megawatt (as measured in alternating current) … This section shall not apply to any qualified property placed in service by the taxpayer after December 31, 2027, which is part of an applicable facility. … This paragraph shall not apply with respect to any … Checked November 16, 2026. uscode.house.gov
  12. Public Law 119-21 (July 4, 2025), sections 70506 and 70513, 139 Stat. 72. Section 25D(h) is amended by striking ``to property placed in service after December 31, 2034'' and inserting ``with respect to any expenditures made after December 31, 2025'' … shall apply to facilities the construction of which begins after the date which is 12 months after the date of enactment of this Act Checked November 16, 2026. govinfo.gov

Rules are quoted from the official text and dated; how we check them: methodology. Not legal or tax advice. Found an error? Write to [email protected]; corrections are listed on the updates page.