Menu

SCE net metering and solar export credits

Published November 16, 2026. Rules checked November 16, 2026.

  • Net billing California: Net Billing Tariff (Schedule NBT). Hourly Energy Export Credit prices from the Avoided Cost Calculator; ACC Plus adder of $0.016/kWh for the 2026 vintage.1

EIA counted 734,901 residential net-metering installations at SCE at the end of 2025, 130,185 of them with a paired battery.2

Tariffs checked November 16, 2026; EIA-861 2025 final data, released October 7, 2026.

Where SCE serves net-metered customers
States where SCE reports net-metering customers

Source: Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data; Census Bureau, Cartographic boundary files, states. States shaded by their program type; EIA-861 2025 rows of the utility.

Show the numbers
StateResidential installations
California (Southern California Edison Co)734,901

Southern California Edison still credits exported solar, but systems applying since April 15, 2023 are not net metered: they take service on the Net Billing Tariff, Schedule NBT, where each hour's exports earn an Energy Export Credit price from the CPUC's Avoided Cost Calculator.13 Those credits pay energy charges only, and any credit still unused at the annual settlement is forfeited.1

What SCE credits for an exported kilowatt-hour

Schedule NBT sets no flat buyback rate. Each billing period, SCE takes the energy your system sends to the grid in each hour, recorded on a separate export channel, and multiplies it by that hour's Energy Export Credit price, derived from the Avoided Cost Calculator the CPUC approves.1 Net billing means exactly this: an exported kWh earns its own export price instead of cancelling a kWh you bought.

Residential customers who connect in the tariff's early years get a second, fixed piece on top, the ACC Plus adder. For the 2026 vintage it is $0.016 per exported kWh, or $0.037 for residential equity customers, and it applies only to systems with an original permission-to-operate date between April 15, 2023 and December 31, 2027.1

For scale, the average California residential price over the September 2025 to August 2026 period was 32.34¢ per kWh, the 2nd highest4 of any state. That figure is revenue per kWh including fixed charges, not an SCE tariff rate; it is a rough benchmark for what a kilowatt-hour drawn from the grid costs, while an exported one earns the hourly export price.

SCE in California: solar export rules
RuleWhat applies
Program typeNet billing
ProgramNet Billing Tariff (Schedule NBT)
Export creditHourly Energy Export Credit prices from the Avoided Cost Calculator; ACC Plus adder of $0.016/kWh for the 2026 vintage1
Netting intervalNone
Unused credits and chargesLeftover export credits are forfeited at the annual settlement; net surplus kWh earn Net Surplus Compensation

What the credits can and cannot pay

Imports and exports are never netted against each other. SCE bills the import channel at the energy rates of your time-of-use period and credits the export channel hour by hour. Residential customers on Schedule NBT must take the Prime option of Schedule TOU-D (TOU-D-PRIME).1

The tariff draws a hard line around what export credits touch. They offset energy charges, and at no point can they offset non-bypassable charges, minimum charges, demand charges or any fixed charge on your rate.1 Under the Net Billing Tariff, non-bypassable charges apply to every kilowatt-hour imported.56

The fixed part of a residential bill is the Base Services Charge. SCE's rate page lists it at $0.79 a day for bundled customers, lower for income-qualified tiers, and says the minimum charge no longer applies; with zero usage you still receive the Base Services Charge.7 The CPUC's implementation schedule put the income-graduated charge in place at SCE in the fourth quarter of 2025, at $24.15 a month in the top income tier, $12.08 for FERA and $6.00 for CARE households.56 A household whose exports more than cover its energy charges therefore still has a bill every month.

The annual settlement, where SCE credits run out

Credits that exceed a month's energy charges are not lost right away. Unused Energy Export Credits carry forward within your 12-month Relevant Period. At the Annual Settlement, SCE applies the remaining credits against the year's charges, and any Energy Export Credit left after those offsets is forfeited.1

The only compensation at settlement is Net Surplus Compensation, and it is measured in kilowatt-hours, not dollars of credit. A customer who exported more energy over the year than it imported is paid for that Net Surplus Energy at the Net Surplus Compensation Rate, a 12-month rolling average of SCE's default load aggregation point (DLAP) prices for 7 a.m. to 5 p.m. Any unused ACC Plus balance is treated differently: it carries over.1

This is where SCE's terms differ from its northern neighbor. PG&E rolls leftover Net Surplus Compensation forward unless the customer asks for a check above one dollar,8 whereas SCE's tariff forfeits leftover export credit outright.1 At SCE, export credit beyond what the year's energy charges can absorb has no further use.

SCE's ACC Plus adder, year by year

When the CPUC adopted the Net Billing Tariff it set a different starting adder for each utility. SCE's was the largest of the three for both residential groups, and SDG&E's residential adder was zero.9

Customer segmentPG&ESDG&ESCE
Residential (non-CARE)$0.0229$0.000$0.040
Residential CARE$0.090$0.000$0.093
Commercialnot eligiblenot eligiblenot eligible

Initial adders per exported kWh, Table 7 of D.22-12-056.9

The adder then steps down for each new vintage. SCE's Schedule NBT lists it by Energy Export Credit vintage year, with a separate column for residential equity customers; non-residential customers get $0.1

EEC vintage yearResidential, non-equity ($ per kWh)Residential equity ($ per kWh)
2023$0.0401$0.093
2024$0.032$0.074
2025$0.024$0.056
2026$0.016$0.037
2027$0.008$0.019
2028 and later$0.000$0.000

To qualify, a system needs an original permission-to-operate date between April 15, 2023 and December 31, 2027.1 The Commission's decision holds a customer's adder constant for nine years from the interconnection date and locks a nine-year schedule of export values from the calculator in effect on January 1 of the interconnection year.105

Batteries on the SCE grid

SCE reported 130,185 residential batteries paired with net-metered solar for 2025, out of 328,4922 in California. Under hourly export pricing, a battery lets a household hold midday output and use it later instead of exporting it at that hour's price.

Schedule NBT also treats paired storage favorably at connection. Customers with NBT-Paired Storage Systems taking service under the tariff's Special Condition 5 are exempt from Supplemental Review fees, Detailed Study costs and the costs of distribution or network upgrades.1

NEM 2.0 customers and the nine-year NBT term

Customers who connected under NEM 1.0 or NEM 2.0 before the change may remain on that tariff for 20 years from the date they interconnected.510

Net Billing Tariff customers get a shorter term. They can remain on Schedule NBT for nine years from the Original PTO Date on which their system was interconnected to SCE's grid, running to the end of the Relevant Period after the ninth anniversary; the tariff's own example is a permission-to-operate date of May 31, 2023, which keeps the customer on through the Relevant Period ending on or after May 31, 2032.1 The CPUC links that legacy period to the customer who originally causes the system to be installed.51011 What that means for buyers and sellers of a home with panels is covered on our California net metering page.

Applying to connect with SCE

SCE connects customer generators under Electric Rule 21, the CPUC tariff that sets the interconnection, operating and metering requirements for generators on an investor-owned utility's distribution system.12 The one-time interconnection fee at SCE is $94 for systems up to 1 MW.56

The Net Billing Tariff allows a system sized to the customer's annual load, plus up to 50% if the customer attests to the need, for example for planned electrification.5 The full terms are in SCE's Schedule NBT, and the residential rates, including TOU-D-PRIME, are on SCE's time-of-use rate plans page.

SCE solar in EIA's numbers

Only PG&E has more solar homes than SCE. Edison's territory held 734,901 residential net-metering installations and 4,622 MW at the end of 2025, 33% of California's total and the 2nd2 largest utility-state count in the US. The count includes customers on the older tariffs, and utilities may report Net Billing Tariff customers outside the net metering table.

Utilities with the most net-metered homes in California, 2025
Pacific Gas & Electric Co.931,26941.3%5977.6177,678
Southern California Edison Co734,90132.6%4621.8130,185
San Diego Gas & Electric Co341,29215.1%1919.210,367
Los Angeles Department of Water & Power95,8984.3%603.14,305
Sacramento Municipal Util Dist63,2182.8%283.53,275

Source: Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data. Largest 5 of 30 utilities reporting residential net metering.

What changed and when
DateWhereWhat changed
April 15, 2023CaliforniaNet billing applies to new California solar applications. Customers of the three large investor-owned utilities applying for interconnection on or after April 15, 2023 take service on the Net Billing Tariff.51013

Federal tax credit for SCE customers

Systems that join Schedule NBT from 2026 on do so after the federal homeowner credit ended: §25D excludes expenditures made after December 31, 2025, and the expenditure date is when the original installation is completed. Owners of earlier systems who could not use their whole credit keep carrying the remainder forward.14

A lease or PPA leaves the homeowner without a credit of its own; the solar company that owns the system may claim §48E, and where construction begins after July 4, 2026 only for a system in service by December 31, 2027.1516 The contract decides whether any of it reaches the household. More on the federal solar tax credit page, and on SDG&E, the third utility on the same statewide tariff.

Questions and answers

Does SCE buy back solar power?

Yes, as bill credits. On Schedule NBT, hourly exports are multiplied by the hourly Energy Export Credit price derived from the Avoided Cost Calculator, and the credits offset energy charges. At the annual settlement, surplus kilowatt-hours earn Net Surplus Compensation and leftover export credit is forfeited.1

How much does SCE pay for solar energy?

There is no single buyback rate. The credit is the Energy Export Credit price for the hour of export, plus, for residential systems with an original permission-to-operate date between April 15, 2023 and December 31, 2027, an ACC Plus adder; the 2026 vintage adds $0.016 per kWh, or $0.037 for residential equity customers.1

Is SCE net metering 2.0 still available?

Not for new systems. Applications from April 15, 2023 go on the Net Billing Tariff, and customers already on NEM 2.0 may stay on it for 20 years from the date they interconnected.510

What is SCE net metering 3.0?

It is the common name for the Net Billing Tariff, which the California utilities call the Solar Billing Plan.510 At SCE it is Schedule NBT, and residential customers on it must take the Prime option of Schedule TOU-D.1

Do SCE solar customers pay a minimum charge?

SCE says the minimum charge no longer applies to its residential time-of-use plans. They carry a Base Services Charge of $0.79 a day for bundled customers, billed even with zero usage.7

Related pages

Sources

  1. SCE Schedule NBT – Net Billing Tariff, Cal. PUC Sheets 85375-E et seq. (e.g., Sheet 30 = 87700-E); Advice 4961-E/4961-E-A (eff. 2023-03-01), 5170-E-A (eff. 2023-12-14), 5228-E (eff. 2024-02-15), 5533-E (eff. 2025-04-23); D.22-12-056; D.23-11-068. Residential Customers taking service under this Schedule must be on the Prime Option of Schedule TOU-D. … multiplying the hourly-differentiated Customer’s Energy Export (channel 2) in kWh by the applicable Energy Export Credit Price (EEC Price), as defined below, derived from the approved Avoided … Checked November 16, 2026. sce.com
  2. Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data, Net_Metering_2025.xlsx (f8612025.zip), released October 7, 2026. eia.gov
  3. Census Bureau, Cartographic boundary files, states, cb_2025_us_state_20m. census.gov
  4. Energy Information Administration, Electricity retail sales, residential average price, electricity/retail-sales, sector RES, released October 23, 2026. eia.gov
  5. CPUC, Net Energy Metering and Net Billing - Key Information. Effective: 2023-04-15. Since April 15, 2023, customers applying for interconnection have taken service on the new net billing tariff (NBT) pursuant to D.22-12-056 . ... The IOUs refer to the NBT as the “Solar Billing Plan.” ... Pursuant to D.14-03-041 , customer-generators are allowed to remain on the NEM 2.0 tariff for … Checked November 16, 2026. cpuc.ca.gov
  6. CPUC Energy Division, Update on the Implementation of the BSC (LIOB, Dec 2025). Effective: Q4 2025 / Q1 2026. Implementation of BSC: Q4 2025 (SCE and SDG&E), Q1 2026 (PG&E) ... 1 $6.00 CARE Status ... 2 $12.08 FERA ... 3 $24.15 Non- CARE/FERA Checked November 16, 2026. liob.cpuc.ca.gov
  7. SCE Time-of-Use Residential Rate Plans (official rate page), SCE web page (not a tariff sheet). Base Services Charge: $0.79 Per day ... The minimum charge is no longer applicable. If you have 0 usage, you will still receive the Base Services Charge. Checked November 16, 2026. sce.com
  8. PG&E Electric Schedule NBT – Net Billing Tariff (NBT) Service, Cal. P.U.C. Sheets 55440-E et seq.; Advice 6848-E (eff. 2023-03-01), Advice 7174-E (eff. 2024-02-15); CPUC D.22-12-056, D.23-11-068. The NBT schedule may also be referred to as the Solar Billing Plan in customer-facing communications. Residential customers, including Load Aggregation Generating/Aggregated Accounts, taking service on NBT must take service on the E-ELEC (ELECTRIC HOME) rate schedule … For both residential and … Checked November 16, 2026. pge.com
  9. CPUC Decision 22-12-056, D.22-12-056 (issued Dec 19, 2022). Table 7. Adopted Initial ACC Plus Adders by Utility ($/kWh) Customer Segment PG&E SDG&E SCE Residential Non-CARE $0.022 $0.000 $0.040 Residential CARE $0.090 $0.000 $0.093 Commercial (not eligible) $0.000 $0.000 $0.000 Checked November 16, 2026. docs.cpuc.ca.gov
  10. CPUC Decision 22-12-056 (R.20-08-020), Ordering Paragraph 1. Effective: Decision 2022-12-15; tariff 2023-04-15. A net billing tariff is adopted. Imports and exports will be calculated based on no netting of consumption and production and will be trued-up on an annual basis. ... The ACC Plus will be available to net billing tariff customers during the first five years of the successor tariff, as a glide path. … Checked November 16, 2026. docs.cpuc.ca.gov
  11. Senate Energy, Utilities & Communications Committee analysis of AB 942 (hearing 7/15/2025). Effective: pending/unknown. This bill modifies the terms applicable to customer-generators participating in the Net Energy Metering (NEM) tariff, including by requiring customer-generators of electrical corporations to be transferred to a new tariff when the property has been sold Checked November 16, 2026. seuc.senate.ca.gov
  12. CPUC, Electric Rule 21: Generating Facility Interconnections. Electric Rule 21 (Rule 21) is a tariff that describes the interconnection, operating and metering requirements for generation facilities to be connected to an investor-owned utility’s (IOUs) distribution sy[stem] Checked November 16, 2026. cpuc.ca.gov
  13. CPUC – Net Billing Tariff page, CPUC web page. On December 15, 2022, the CPUC adopted D.22-12-056, establishing the Net Billing tariff (NBT) as a successor to NEM2. ... The NBT will apply to customers who submit an interconnection application on or after April 15, 2023. Checked November 16, 2026. cpuc.ca.gov
  14. 26 U.S.C. §25D, Residential clean energy credit, Text current through Public Law 119-142 (November 10, 2026). in the case of property placed in service after December 31, 2021, 30 percent … The credit allowed under this section shall not apply with respect to any expenditures made after December 31, 2025. … an expenditure with respect to an item shall be treated as made when the original installation of … Checked November 16, 2026. uscode.house.gov
  15. Public Law 119-21 (July 4, 2025), sections 70506 and 70513, 139 Stat. 72. Section 25D(h) is amended by striking ``to property placed in service after December 31, 2034'' and inserting ``with respect to any expenditures made after December 31, 2025'' … shall apply to facilities the construction of which begins after the date which is 12 months after the date of enactment of this Act Checked November 16, 2026. govinfo.gov
  16. 26 U.S.C. §48E, Clean electricity investment credit, Text current through Public Law 119-142 (November 10, 2026). with a maximum net output of less than 1 megawatt (as measured in alternating current) … This section shall not apply to any qualified property placed in service by the taxpayer after December 31, 2027, which is part of an applicable facility. … This paragraph shall not apply with respect to any … Checked November 16, 2026. uscode.house.gov

Rules are quoted from the official text and dated; how we check them: methodology. Not legal or tax advice. Found an error? Write to [email protected]; corrections are listed on the updates page.