Menu

LADWP net metering and solar credits

Published November 16, 2026. Rules checked November 16, 2026.

  • Net metering California: Service Rider NEM (Net Energy Metering). Excess credited at the customer's own rate-schedule energy price.1

EIA counted 95,898 residential net-metering installations at LADWP at the end of 2025, 4,305 of them with a paired battery.2

Tariffs checked November 16, 2026; EIA-861 2025 final data, released October 7, 2026.

Where LADWP serves net-metered customers
States where LADWP reports net-metering customers

Source: Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data; Census Bureau, Cartographic boundary files, states. States shaded by their program type; EIA-861 2025 rows of the utility.

Show the numbers
StateResidential installations
California (Los Angeles Department of Water & Power)95,898

LADWP still offers net metering to rooftop solar customers: when a home generates more than it draws in a billing period, the excess is credited at the energy pricing of the customer's own rate schedule. As a municipal utility, LADWP is outside the CPUC's Net Billing Tariff, the "NEM 3.0" that new PG&E, SCE and SDG&E customers take. The credit is never paid out in cash: whatever balance is left when you close the account is set to zero.1

Does LADWP buy back solar?

It credits it, kilowatt-hour for kilowatt-hour, at your own energy price. The Los Angeles Department of Water and Power runs net metering under Service Rider NEM, part of its electric rate ordinance. When the electricity a customer generates in a month exceeds what LADWP supplies, "a credit for the energy received will be calculated using the applicable Rate Schedule energy pricing."1 Net metering, in this sense, means an exported kWh is valued at the same energy price as a kWh bought, rather than at a separate export rate.

That answer sets LADWP apart from the utilities around it. Since April 15, 2023, new rooftop systems at PG&E, SCE and SDG&E have gone on the Net Billing Tariff, which the investor-owned utilities call the "Solar Billing Plan".45 LADWP is a municipal utility, so the Net Billing Tariff does not apply to its customers.1

LADWP in California: solar export rules
RuleWhat applies
Program typeNet metering
ProgramService Rider NEM (Net Energy Metering)
Export creditExcess credited at the customer's own rate-schedule energy price1
Netting intervalMonthly
Unused credits and chargesNo annual cash-out; balance zeroed when service ends

Service Rider NEM, clause by clause

The rider is short. Four of its sentences decide how a solar home is billed.

Who qualifies. The customer "owns and operates a permanent solar or wind turbine electrical generating facility or a hybrid system with a capacity of not more than one megawatt that is located on the customers premises."1

What a surplus month earns. Excess kWh are credited at the energy pricing of the customer's rate schedule.1 On a time-of-use schedule the credit follows the price of the period, so a kWh exported in a higher-priced period is worth more than one exported in a lower-priced period.

What still gets billed. If LADWP supplies less electricity than the customer generates over the billing period, "all applicable monthly billing charges, except energy related charges or charges based upon kWh, shall apply."1 Netting wipes out the energy line; it does not touch the charges that are not priced per kWh.

What happens to a leftover balance. Credit balances roll forward to later bills, and they do not pay taxes or minimum charges. If a balance remains when the customer terminates service, "the balance will automatically be adjusted to zero and the customer shall be owed no further compensation for excess generation."1 There is no annual settlement that converts surplus kWh to cash, so a seller who has banked credit through a sunny spring and summer loses it when the account closes.

LADWP and the Net Billing Tariff, side by side

A solar home's rules in California depend first on which utility sends the bill. The table sets LADWP's rider beside the tariff of the three investor-owned utilities.

LADWP, Service Rider NEMPG&E, SCE, SDG&E: Net Billing Tariff
Value of an exported kWhYour rate schedule's energy priceHourly Avoided Cost Calculator value, averaged by month and day type
NettingWithin the billing periodNone: imports and exports counted separately5
Leftover creditRolls forward; set to zero when service endsRolls forward to an annual true-up
Size limitNot more than one megawatt1Annual load plus up to 50% with an attested need4

The first row is where the difference shows up on a bill. Under net billing, each exported kWh earns an hourly value from the CPUC's Avoided Cost Calculator.54 Under LADWP's rider, an exported kWh offsets a purchased one at the energy price of your own schedule.1 How that plays out in dollars depends on the schedule, the season and how much of the output the house uses as it is produced.

The third row cuts the other way. An investor-owned utility customer's surplus is settled once a year,4 while an LADWP balance simply carries on until the account closes, and then it is gone.1 A system sized to produce well beyond the home's yearly use builds a balance that can only be drawn down against later LADWP bills.

The statewide tariff is explained on our Net Billing Tariff page and, for the city utilities, on the California net metering page.

Batteries under monthly netting

LADWP reported 4,305 residential batteries paired with net-metered solar at the end of 2025, out of 95,898 residential net-metering installations. SCE, the neighboring investor-owned utility, reported 130,185 paired batteries against 734,9012 installations.

The two tariffs give a battery different jobs. Under net billing each exported kWh earns an hourly avoided-cost value,54 so storing midday output for the evening changes what it is worth. Under LADWP's rider, a surplus kWh is credited at the energy price of the period in which it is exported and nets within the billing period,1 so for bill credits a battery mainly shifts energy from one time-of-use period to another. Backup power during outages is a separate reason to own one and is not a tariff matter.

Applying to net meter with LADWP

The rider's own conditions are the starting point: a permanent solar or wind system, or a hybrid, owned and operated by the customer, located on the customer's premises and not larger than one megawatt. The full rider sits in LADWP's electric rate ordinance, alongside the rate schedules whose energy prices set the value of the credit.1

The CPUC's Electric Rule 21 describes interconnection to an investor-owned utility's distribution system,6 so its fees and timelines are not LADWP's. Application steps, inspections and any fees for an LADWP connection come from LADWP; confirm them with the department before signing a contract.

LADWP in California's solar count

In California terms LADWP is a small solar utility, 4% of the state's net-metered homes, but nationally its 95,898 residential installations (603 MW at the end of 2025) rank 13th2 among utility-state counts.

Residential net-metering installations by utility, California, 2025
Imperial Irrigation District14,066
City of Roseville - (CA)13,542
Modesto Irrigation District11,986

Source: Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data. EIA-861 utility rows, all technologies; utility names as reported to EIA.

Show the numbers
UtilityResidential installations
Pacific Gas & Electric Co.931,269
Southern California Edison Co734,901
San Diego Gas & Electric Co341,292
Los Angeles Department of Water & Power95,898
Sacramento Municipal Util Dist63,218
Imperial Irrigation District14,066
City of Roseville - (CA)13,542
Modesto Irrigation District11,986
City of Riverside - (CA)7,975
Turlock Irrigation District5,418
City of Anaheim - (CA)5,351
City of Glendale - (CA)3,874
City of Moreno Valley - (CA)3,653
Merced Irrigation District3,623
City of Pasadena - (CA)3,121
City of Redding - (CA)2,332
City of Burbank Water and Power - (CA)1,899
City of Palo Alto - (CA)1,763
Alameda Municipal Power1,235
City of Santa Clara - (CA)1,233
City of Colton - (CA)1,211
PacifiCorp998
Liberty Utilities931
Bear Valley Electric Service684
City of Lodi - (CA)643
City of Azusa464
City of Shasta Lake - (CA)146
City & County of San Francisco - (CA)21
City of Corona - (CA)20
Surprise Valley Electrification18

Statewide, California counted 2,309,938 net-metering customers, the highest2 count of any state, and its average residential price over September 2025 to August 2026 was 32.34¢ per kWh, the 2nd highest7 in the country. That average is revenue per kWh across all California utilities, including fixed charges; it is not an LADWP rate.

Incentives and tax credits for Los Angeles solar

California's property tax exclusion for active solar energy systems in new construction is scheduled to sunset on January 1, 2027, according to the Board of Equalization.8 It is a state tax rule, not a utility program, so it does not depend on LADWP.

An LADWP rooftop installed and paid for in 2026 gets nothing under §25D, which ended for expenditures made after December 31, 2025; the expenditure date is the completion of the original installation, so a 2025 payment does not rescue a 2026 completion. A credit from a 2025 system that was larger than that year's tax keeps carrying forward.9

Panels on a lease or PPA belong to the solar company, and so does any §48E credit; the household has nothing to claim. The company's credit for solar whose construction begins after July 4, 2026 needs the system in service by December 31, 2027, a deadline that does not bind energy storage.1011 Any pass-through is a contract term. The rest is on the federal solar tax credit page.

Questions and answers

Does LADWP have net metering?

Yes. Service Rider NEM in LADWP's electric rate ordinance covers customer-owned solar or wind systems, or hybrids, of not more than one megawatt located on the customer's premises.1

Is LADWP on NEM 3.0?

No. NEM 3.0 is the common name for the CPUC's Net Billing Tariff, which binds the investor-owned utilities. LADWP is a municipal utility, so it does not apply.1

Does LADWP buy back solar power?

Not for cash. Excess generation in a billing period becomes a bill credit calculated at the energy pricing of your rate schedule. If a credit balance remains when you terminate service, it is adjusted to zero and LADWP owes no further compensation.1

What is the LADWP net metering rate?

There is no separate buyback rate. The rider says the credit "will be calculated using the applicable Rate Schedule energy pricing", so it follows whatever energy price your own schedule charges, by period on a time-of-use schedule.1

Can I still claim the 30% federal tax credit for solar in Los Angeles?

Not as a homeowner for a new system. The §25D credit does not apply to expenditures made after December 31, 2025, and an expenditure is made when installation is completed. Unused credit from a 2025 installation can carry forward.9

Related pages

Sources

  1. LADWP Electric Rates (rate ordinance, consolidated PDF hosted by LADWP), Service Rider NEM, "Rate Effective September 1, 2008" (ordinance adopting Resolution No. 009-009 of July 2, 2008); later ordinances may have amended rates — check current ordinance. Customer owns and operates a permanent solar or wind turbine electrical generating facility or a hybrid system with a capacity of not more than one megawatt that is located on the customers premises … A credit for the energy received will be calculated using the applicable Rate Schedule energy … Checked November 16, 2026. ladwp.com
  2. Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data, Net_Metering_2025.xlsx (f8612025.zip), released October 7, 2026. eia.gov
  3. Census Bureau, Cartographic boundary files, states, cb_2025_us_state_20m. census.gov
  4. CPUC, Net Energy Metering and Net Billing - Key Information. Effective: 2023-04-15. Since April 15, 2023, customers applying for interconnection have taken service on the new net billing tariff (NBT) pursuant to D.22-12-056 . ... The IOUs refer to the NBT as the “Solar Billing Plan.” ... Pursuant to D.14-03-041 , customer-generators are allowed to remain on the NEM 2.0 tariff for … Checked November 16, 2026. cpuc.ca.gov
  5. CPUC Decision 22-12-056 (R.20-08-020), Ordering Paragraph 1. Effective: Decision 2022-12-15; tariff 2023-04-15. A net billing tariff is adopted. Imports and exports will be calculated based on no netting of consumption and production and will be trued-up on an annual basis. ... The ACC Plus will be available to net billing tariff customers during the first five years of the successor tariff, as a glide path. … Checked November 16, 2026. docs.cpuc.ca.gov
  6. CPUC, Electric Rule 21: Generating Facility Interconnections. Electric Rule 21 (Rule 21) is a tariff that describes the interconnection, operating and metering requirements for generation facilities to be connected to an investor-owned utility’s (IOUs) distribution sy[stem] Checked November 16, 2026. cpuc.ca.gov
  7. Energy Information Administration, Electricity retail sales, residential average price, electricity/retail-sales, sector RES, released October 23, 2026. eia.gov
  8. California BOE, Active Solar Energy System Exclusion. Effective: until 2027-01-01. Effective September 18, 2022, the sunset date for the active solar energy system new construction exclusion was extended through 2025-26 fiscal year. The statute is now scheduled to sunset on January 1, 2027. Checked November 16, 2026. boe.ca.gov
  9. 26 U.S.C. §25D, Residential clean energy credit, Text current through Public Law 119-142 (November 10, 2026). in the case of property placed in service after December 31, 2021, 30 percent … The credit allowed under this section shall not apply with respect to any expenditures made after December 31, 2025. … an expenditure with respect to an item shall be treated as made when the original installation of … Checked November 16, 2026. uscode.house.gov
  10. Public Law 119-21 (July 4, 2025), sections 70506 and 70513, 139 Stat. 72. Section 25D(h) is amended by striking ``to property placed in service after December 31, 2034'' and inserting ``with respect to any expenditures made after December 31, 2025'' … shall apply to facilities the construction of which begins after the date which is 12 months after the date of enactment of this Act Checked November 16, 2026. govinfo.gov
  11. 26 U.S.C. §48E, Clean electricity investment credit, Text current through Public Law 119-142 (November 10, 2026). with a maximum net output of less than 1 megawatt (as measured in alternating current) … This section shall not apply to any qualified property placed in service by the taxpayer after December 31, 2027, which is part of an applicable facility. … This paragraph shall not apply with respect to any … Checked November 16, 2026. uscode.house.gov

Rules are quoted from the official text and dated; how we check them: methodology. Not legal or tax advice. Found an error? Write to [email protected]; corrections are listed on the updates page.