Where a utility credits exported solar at its own export rate, flat rates for new customers at the utilities we track run from $0.0187 per kWh at SRP to $0.0960 at SMUD.314 The number is only half the answer: the date you apply decides which rate you get and for how long, and the tariff decides what the credit can pay for. The table gives each utility's credit with the tariff and effective date behind it.

Published November 16, 2026. Rules checked November 16, 2026.

Export credits utility by utility

Each row is the rule for a new residential customer, footnoted to the tariff, commission order or official utility page we read, with its effective date. The "Type" column separates net billing (each exported kWh earns a separate export rate) from net metering (exported kWh cancel kWh bought at the retail rate) and the variants in between. Sort by state or type; select a utility for its full page.

Solar export credits at large US utilities
APSArizonaNet billingRate Rider RCP (Resource Comparison Proxy export rate)$0.05554/kWh for the 2026 tranche, locked for 10 years12None (instantaneous)
SRPArizonaNet billingSolar export-rate price plans (such as Conserve 6-9 p.m. and Save)$0.0187/kWh from the May 2026 billing cycle, recalculated each May34None on export-rate plans
TEPArizonaNet billingRider R-14 (Resource Comparison Proxy export rate)$0.0462/kWh for applications from October 1, 2026, locked for 10 years56None (instantaneous)
LADWPCaliforniaNet meteringService Rider NEM (Net Energy Metering)Excess credited at the customer's own rate-schedule energy price7Monthly
PG&ECaliforniaNet billingNet Billing Tariff (Schedule NBT, "Solar Billing Plan")Hourly Avoided Cost Calculator export values; ACC Plus adder of $0.0088/kWh for 2026 applications8None
SCECaliforniaNet billingNet Billing Tariff (Schedule NBT)Hourly Energy Export Credit prices from the Avoided Cost Calculator; ACC Plus adder of $0.016/kWh for the 2026 vintage9None
SDG&ECaliforniaNet billingNet Billing Tariff (Schedule NBT, "Solar Billing Plan")Hourly Avoided Cost Calculator export values; no ACC Plus adder for residential customers10111213None
SMUDCaliforniaNet billingRate Schedule SSR (Solar and Storage Rate)$0.0960/kWh flat from June 1, 2026, updated every four years14None
Xcel EnergyColoradoNet meteringNet Metering Service, Schedule NMExcess kWh carried month to month at retail1516Monthly (by time-of-use period on TOU rates)
EversourceConnecticutNet billingResidential Renewable Energy Solutions (RRES): Netting or Buy-AllBuy-All $0.3289/kWh for 2026 applications for 20 years; Netting at retail minus a $0.0402/kWh Solar Energy Adjustment on total production17Monthly (Netting)
PepcoDistrict of ColumbiaNet meteringNet energy metering (15 DCMR ch. 9)Monthly excess credited in kWh to the next bill18Monthly
Duke EnergyFloridaNet meteringFlorida net metering rule (Rule 25-6.065, F.A.C.)Excess generation credited as kWh against later usage1920Monthly
FPLFloridaNet meteringNet Metering of Customer-Owned Renewable Generation (Tariff Sheet No. 10.010)Excess kWh credited 1:1 to the next month2122Monthly
Georgia PowerGeorgiaNet billingTariff RNR-11, Instantaneous NettingSolar avoided energy cost of 3.2188¢/kWh for 2026 plus a 4¢/kWh adder2324Instantaneous
Hawaiian ElectricHawaiiNet billingSmart Renewable Energy (SRE) Export, Rule No. 32Time-of-day export rates by island; Oahu 18.9¢ overnight, 13.5¢ daytime, 32.9¢ evening peak (2024–2026)2526By time of day
Idaho PowerIdahoNet billingSchedule 6 on-site generation: real-time net billing with an Export Credit RateSummer on-peak 15.6836¢, summer off-peak 3.3920¢, non-summer 2.9019¢ per kWh (from October 1, 2025)2728Real time
ComEdIllinoisNet metering, reduced excessNet metering under Rider POGNM (supply-only for systems from 2025)Credits only against the energy-supply section of the bill2930Monthly (hourly for hourly-pricing customers)
Duke EnergyIndianaNet billingExcess Distributed Generation (IC 8-1-40)1.25 times the supplier's average marginal price of the prior calendar year31Instantaneous
Duke EnergyKentuckyNet billingNet metering under KRS 278.466 (Rider NM II)Every exported kWh earns the Avoided Cost Excess Generation Credit of $0.074805/kWh, from July 10, 2026 (Kentucky PSC Case No. 2025-00258)3233Dollar values netted each billing period
PepcoMarylandNet meteringNet energy metering (PUA §7-306)Billing-cycle kWh netting at retail34Monthly
EversourceMassachusettsNet meteringNet Metering tariff (M.D.P.U. No. 68N)Excess kWh times basic service, distribution, transmission and transition charges35Monthly
National GridMassachusettsNet meteringNet Metering Provision (M.D.P.U. No. 1625)Standard Net Metering Credit: excess kWh times basic service, distribution, transmission and transition charges36Monthly
Xcel EnergyMinnesotaNet metering, reduced excessRate Code A50 (systems under 40 kW AC)Monthly net excess paid at the average retail utility energy rate3738Monthly
NV EnergyNevadaNet metering, reduced excessNet Metering Rider NMR-405 (Tier 4 Excess Energy Credit)$0.08717/kWh for Nevada Power single-family homes (75% of the $0.11622 base rate) from July 1, 202639Set by tariff
EversourceNew HampshireNet metering, reduced excessAlternative Net Metering Tariff (NEM 2.0), NHPUC No. 10Net monthly exports credited at the Default Energy Service rate plus transmission charges plus 25% of distribution charges40Monthly
PSE&GNew JerseyNet meteringNet metering (N.J.A.C. 14:8-4)Credits carried through a 12-month annualized period41424344Annualized period
Con EdisonNew YorkNet meteringVDER Phase One net energy meteringkWh net metering with a 20-year term; Customer Benefit Contribution of $1.29 per kW-DC a month in 2026454647Monthly
National GridNew YorkNet meteringVDER Phase One net energy meteringkWh net metering with a 20-year term; Customer Benefit Contribution of $0.97 per kW-DC a month in 2026454647Monthly
PSEG Long IslandNew YorkNet meteringPhase One net metering (LIPA Tariff for Electric Service)Net monthly exports credited at the full per-kWh rate of the service class4849Monthly (TOU periods banked separately)
Duke EnergyNorth CarolinaSuccessor nettingResidential Solar Choice (Rider RSC) and Net Metering Bridge (Rider NMB)Net monthly exports credited at the Net Excess Energy Credit, based on avoided cost: 4.53¢/kWh (Duke Energy Carolinas) or 3.94¢/kWh (Duke Energy Progress)505152Monthly, by time-of-use period
Rocky Mountain PowerOregonNet meteringPacific Power Schedule 135 Net Metering ServiceMonthly net excess becomes a kWh credit at the full retail rate5354Monthly
Duke EnergySouth CarolinaSuccessor nettingSolar choice metering (S.C. Code §58-40-20): Riders RNM, IRSC, RSC and NSCSet in the utility's solar choice tariff5556Set by tariff
Rocky Mountain PowerUtahNet billingSchedule No. 137 Net Billing Service4.855¢/kWh June–September, 4.033¢/kWh October–May (from March 1, 2026)57None
Dominion EnergyVirginiaNet meteringNet energy metering (Va. Code §56-594); successor "NEM 2.0" approved April 30, 2026Current: kWh netting at retail over the year; NEM 2.0: annual net excess at $0.05829/kWh, 30-minute interval, $1.00 monthly charge585912-month period

Checked November 16, 2026; each credit is footnoted to the tariff, order or official page with its effective date.

Read the export credit column together with the netting column. A rate of a few cents means little if the utility first nets your exports against what you use in the month or year; it means a lot if every exported kWh is counted separately, as under Rocky Mountain Power's Schedule 137 in Utah, where energy charges apply to all purchased energy and exports are credited only at the export rate.57

Flat export credits against the price of power

Export credits per kWh compared with the average residential price
SMUD (California): Solar and Storage Rate9.60¢
California average residential price32.34¢
Nevada Power (NV Energy): Tier 4, from July 1, 20268.72¢
Nevada average residential price13.45¢
Georgia Power: instantaneous netting, 20267.22¢
Georgia average residential price15.17¢
Dominion Energy Virginia: NEM 2.0 (from about May 2027)5.83¢
Virginia average residential price16.64¢
APS (Arizona): RCP, 2026 tranche5.55¢
Arizona average residential price15.39¢
TEP (Arizona): RCP from October 1, 20264.62¢
Arizona average residential price15.39¢
Rocky Mountain Power (Utah): Schedule 1374.31¢ (year average)
Utah average residential price13.26¢
SRP (Arizona): export-rate plans from May 20261.87¢
Arizona average residential price15.39¢

Source: Energy Information Administration, Electricity retail sales, residential average price. Export credits from the utility tariffs cited on this page; seasonal credits shown as a 12-month average. Average price: revenue divided by kWh, 12 months to August 2026, all charges included.

Show the numbers
TariffExport credit (¢/kWh)State average price (¢/kWh)
SMUD (California): Solar and Storage Rate9.60032.34
Nevada Power (NV Energy): Tier 4, from July 1, 20268.71713.45
Georgia Power: instantaneous netting, 20267.21915.17
Dominion Energy Virginia: NEM 2.0 (from about May 2027)5.82916.64
APS (Arizona): RCP, 2026 tranche5.55415.39
TEP (Arizona): RCP from October 1, 20264.62015.39
Rocky Mountain Power (Utah): Schedule 1374.30713.26
SRP (Arizona): export-rate plans from May 20261.87015.39

Every flat credit in the chart is below its state's average residential price. Two cautions apply. The average price is revenue divided by kWh sold and includes fixed charges, so it is higher than the energy charge a credit actually displaces. And Dominion Energy's figure applies only to annual net excess under its approved NEM 2.0 tariff: kWh netting over a one-year period stays, so most exports there still cancel purchases kilowatt-hour for kilowatt-hour.59

One Connecticut figure is left out of the chart because it is not an export rate. Eversource's Buy-All option in Connecticut pays $0.3289 per kWh for 2026 applications, locked for 20 years, but for all of a system's output, and the rate includes the value of the renewable energy certificates.17 The household then buys all its electricity at retail.

Where the rate comes from

Export rates look alike on a bill but are built from different formulas, set by different bodies:

  • Avoided cost. Georgia Power credits each excess kWh at its annual Solar Avoided Energy Cost, 3.2188¢ per kWh for 2026, plus a Renewable Generation Adder of 4¢.23 The Louisiana Public Service Commission publishes a rate for each utility; Entergy Louisiana's is $0.0386407 per kWh from April 1, 2026.61
  • Hourly avoided cost. PG&E, SCE and SDG&E credit exports at values from the CPUC's Avoided Cost Calculator, which change by hour. PG&E and SCE add an "ACC Plus" adder for early applicants: $0.0088 per kWh at PG&E and $0.016 at SCE for 2026.89 SDG&E residential customers get no adder.11
  • A solar market proxy. Arizona's Resource Comparison Proxy (RCP) is reset each year and may not fall more than 10% a year; APS's 2026 tranche is $0.05554 per kWh.1
  • A share of the retail rate. Nevada Power's open Tier 4 credit for single-family homes is $0.08717 per kWh from July 1, 2026, 75% of the $0.11622 energy rate.39
  • A statutory formula. Indiana credits excess distributed generation at 1.25 times the supplier's average marginal price of the most recent calendar year.31 Mississippi Power adds a 2.5¢ per kWh distributed generation value to its avoided energy cost.62
  • A utility board. SMUD, a municipal utility, set its Export Compensation Rate at $0.0960 per kWh from June 1, 2026.14

Our guide to export credit methods explains each method in more depth.

Locked, reset or frozen: when your rate is decided

For anyone comparing offers, this is the column the table cannot show. Some utilities fix the export rate a household starts with for years; others change it for everyone on a schedule.

Locked at application. APS customers keep the RCP rate in effect when they submitted the interconnection application, if installation is approved within 180 days. The rate stays fixed for 10 years from interconnection and then floats with the current annual RCP rate.12 TEP works the same way, with its new rate each October 1; applications from October 1, 2026 get $0.0462 per kWh.6 TEP's rate history shows why the application date matters: the rate was $0.0964 per kWh for applications from September 21, 2018.5

Locked by vintage. PG&E customers who apply from April 15, 2023 through December 31, 2027 lock a nine-year schedule of Avoided Cost Calculator values from the vintage in force on January 1 of their application year.8 Eversource's Connecticut Buy-All rate is locked for 20 years, and Mississippi Power's distributed generation value stays in place for 25 years from installation.1762

Reset on a calendar. SRP recalculates its export rate each May; it became $0.0187 per kWh from the May 2026 billing cycle.3 Rocky Mountain Power's Utah export credits changed on March 1, 2026, to 4.855¢ per kWh for June–September bills and 4.033¢ for October–May bills.57 SMUD updates its rate every four years, with a cap on how far each update can move it.14 Hawaiian Electric's export rates are set for three years at a time; the 2024–2026 table is due for an update for 2027.63

Frozen. The Idaho Public Utilities Commission capped the drop in Idaho Power's avoided-energy value at 40% and suspended annual updates of the Export Credit Rate until the company's April 1, 2028 filing.27

Dates ahead
DateWhereWhat changed
December 31, 2026North CarolinaLegacy Duke net metering customers move to the Net Metering Bridge. Residential customers still on Rider NM are moved automatically to Rider NMB.5064
January 1, 2027North CarolinaDuke Energy Progress closes the Net Metering Bridge to new participants. Rider NMB closes to new participants on January 1, 2027; those who applied before then keep it for up to 15 calendar years from their interconnection application.65
January 1, 2027New HampshireNew Hampshire rule on exports from storage takes effect. Paragraph XXV of RSA 362-A:9, on exports from storage, takes effect January 1, 2027.6667
January 1, 2027ColoradoColorado HOA rules can no longer bar portable-scale solar. Under HB 26-1007, homeowners association restrictions cannot bar portable-scale solar generation devices on and after January 1, 2027.68
February 1, 2027MarylandDeadline for Maryland’s successor to net metering. The PSC must approve a successor framework, to begin July 1, 2027.69
July 1, 2027MarylandMaryland’s current net metering closes. The standard tariff is offered until the earlier of 3,000 MW statewide or July 1, 2027.3470

Time of day can matter more than the headline rate

A single number hides the spread within a day or a year. On Oahu, Hawaiian Electric's Smart Renewable Energy export rate is 13.5¢ per kWh in the daytime, from 9 a.m. to 5 p.m., and 32.9¢ in the 5 p.m. to 9 p.m. evening peak.26 Idaho Power's Export Credit Rate is 15.6836¢ per kWh in summer on-peak hours and 2.9019¢ outside summer.28 In California, the exported kWh is valued hour by hour.9

Panels produce most at midday, which on Oahu is when the export rate is lowest. Under a tariff like that, a battery that shifts exports into the evening changes the value of the same kWh, while a flat rate such as SMUD's, which does not vary by time, is easier to estimate.14 Our guide to batteries and export rules covers how each tariff treats stored energy.

Two households, one rate apart

The same illustrative household, with the same usage, production and energy price, under two flat export rates: SRP's $0.0187 per kWh and SMUD's $0.0960.314 The inputs are printed on each figure, and the energy price is set to the same illustrative value in both, so only the export rate differs. Neither figure models fixed charges, minimum bills or time-of-use prices, and SRP's solar price plans carry other terms not shown here.4

Illustration: flat export rate of SRP

Inputs: 900 kWh a month of use; 9,000 kWh a year of solar output spread over the months as PVWatts models for Arizona; 40% of output used at home as it is produced; energy price 16.00¢ per kWh.

Solar production in a year9,000 kWh
Used at home as it is produced3,600 kWh
Sent to the grid (exports)5,400 kWh
Bought from the grid (imports)7,200 kWh
Value of solar used at home, at your energy price$576
Value of exports under this tariff$101
Average credit per exported kWh1.87¢
Energy charges for a year without solar$1,728
Energy charges for a year with solar, before fixed charges$1,051

Source: National Laboratory of the Rockies (formerly NREL), PVWatts v8 model estimates; Energy Information Administration, Electricity retail sales, residential average price. Export treatment from the tariff cited in the text. An illustration of the crediting rule, not a quote or a savings estimate: fixed charges, minimum bills, taxes and time-of-use prices are not modelled. Try your own numbers in the export credit calculator.

Illustration: flat export rate of SMUD

Inputs: 900 kWh a month of use; 9,000 kWh a year of solar output spread over the months as PVWatts models for California; 40% of output used at home as it is produced; energy price 16.00¢ per kWh.

Solar production in a year9,000 kWh
Used at home as it is produced3,600 kWh
Sent to the grid (exports)5,400 kWh
Bought from the grid (imports)7,200 kWh
Value of solar used at home, at your energy price$576
Value of exports under this tariff$518
Average credit per exported kWh9.6¢
Energy charges for a year without solar$1,728
Energy charges for a year with solar, before fixed charges$634

Source: National Laboratory of the Rockies (formerly NREL), PVWatts v8 model estimates; Energy Information Administration, Electricity retail sales, residential average price. Export treatment from the tariff cited in the text. An illustration of the crediting rule, not a quote or a savings estimate: fixed charges, minimum bills, taxes and time-of-use prices are not modelled. Try your own numbers in the export credit calculator.

The difference comes entirely from the exported kWh; the solar used at home as it is produced is worth the same in both. You can enter your own utility's rate in the export credit calculator.

What a credit can pay for, and when it expires

The export rate sets the size of a credit; other tariff terms decide whether it is used.

  • Energy charges only. SCE's Energy Export Credits offset energy charges, never non-bypassable, minimum, demand or fixed charges.9 SMUD's export credits offset only usage charges; fixed charges, fees and taxes are due every month.14
  • Credits that expire. Rocky Mountain Power's Utah credits carry over until the annualized billing period ends with the March meter read, then expire without payment.57 Hawaiian Electric's leftover export credits expire at year end, except BYOD Plus credits.26
  • Small annual checks. After the December bill, APS pays remaining RCP credits over $25 by check.1 TEP pays a remaining RCP credit balance over $10 once a year, on October bills.6
  • A charge on production. Eversource Connecticut customers who choose Netting and apply in 2026 pay a $0.0402 per kWh Solar Energy Adjustment on total solar production, not just exports.17

Where no export rate applies

Many households never see an export rate. In retail net metering states, exported kWh cancel kWh bought. Pennsylvania's rule credits each kWh at the full retail rate, including generation, transmission and distribution charges, up to the customer's use in the billing period, with excess carried forward.72 Florida carries excess generation forward as kWh to offset usage in later months.19 PSEG Long Island credits net monthly exports to the next bill at the full per-kWh rate of the service class.48 The net metering by state table shows which states follow this model.

Texas is the opposite case. Oncor, CenterPoint, AEP Texas and TNMP deliver power and meter solar systems but do not buy exports. Where customers can choose a retail electric provider, the buyback rate is part of the plan contract, and the Public Utility Commission of Texas notes it is usually lower than the retail price.73 Our page on Texas solar buyback plans explains how to read those terms on an Electricity Facts Label.

Export credits and the federal tax credit

A high or low export rate changes nothing on a federal return. Since the end of §25D for expenditures made after December 31, 2025, a household that buys a system finished now has no federal credit to claim whichever utility it is on.74 Leased and PPA systems are the owner's business: the owner may claim §48E, and whether any of it shows up in the lease price is a contract question.75 Dates, carryforwards and third-party ownership are on the federal credit page.

How we check these rates

Each export credit comes from the utility's tariff, the commission order that set it or the utility's official program page, and the footnote gives the document, its effective date and the date we checked it. Rates move on different calendars: SRP in May, APS in September and TEP in October.316 We review the tariffs on that schedule and record every change, with its source, in the change log.

Questions and answers

How much do utilities pay for solar?

It depends on the tariff. Under net billing, flat export rates for new customers range from $0.0187 per kWh at SRP to $0.0960 per kWh at SMUD.314 Under retail net metering, as in Pennsylvania, exported kWh are credited at the full retail kilowatt-hour rate instead.72 Most of these are bill credits, not cash.

Does Oncor buy back solar?

No. Oncor and the other Texas wires utilities connect and meter solar systems but do not buy exports. In areas with retail choice, the Public Utility Commission of Texas says the buyback rate is part of your contract with your retail electric provider.73

Why is my export credit lower than what I pay for electricity?

Many export rates are based on the utility's avoided cost, what it would otherwise spend to produce or buy that energy, rather than on the retail price. Georgia Power, for example, credits its annual solar avoided energy cost of 3.2188¢ per kWh for 2026 plus a 4¢ adder.23

Will my export rate change after I install solar?

That depends on the utility. APS keeps the rate in effect when you applied for 10 years from interconnection, then it floats with the current annual rate.12 SRP recalculates its export rate each May.3

Sources

  1. APS Rate Rider RCP – Partial Requirements Service for New On-Site Solar DG, Resource Comparison Proxy Export Rate, A.C.C. No. 6248, Revision No. 11, effective September 1, 2026 in ACC Decision No. 82122. The Company will meter this Export Energy on an instantaneous basis and provide a monthly bill credit based on the purchase rate in this schedule. … Tranche 2025 September 1, 2025 through August 31, 2026 $0.06171 per kWh Tranche 2026 September 1, 2026 through August 31, 2027 $0.05554 per kWh … An … Checked November 16, 2026. aps.com
  2. APS Rate Rider EPR-6 Legacy (Frozen) – Net Metering, A.C.C. No. 6194, Revision No. 2, effective March 8, 2024 in Decision No. 79293. Each Customer’s initial RCP rate will be applicable for 10 years from the time of their interconnection. ... A residential Customer may remain on this rate rider for up to 20 years from the date their solar generator was interconnected … After the December billing cycle, any export energy that has … Checked November 16, 2026. aps.com
  3. SRP – Conserve 6-9 p.m. and Save (solar price plan) page, SRP web page, checked 2026-11-16. As of the May 2026 billing cycle, the export rate is $0.0187/kWh. The export rate is recalculated annually, with adjustments taking effect each May billing cycle. … The amount of energy used in your home is instantaneously monitored and recorded by your meter. ... This is different from net … Checked November 16, 2026. srpnet.com
  4. SRP – Compare Solar Price Plans, SRP web page, checked 2026-11-16. SRP offers demand- and export-based plans for customers with on-site generation (e.g., rooftop solar systems) and battery energy storage systems. There are also options available to shift from a fixed price for each kilowatt-hour you send back to the grid (e.g., SRP’s export rate) to market-based … Checked November 16, 2026. srpnet.com
  5. TEP Statement of Charges (Sheet 801 series), Rider R-14 RCP rate history with ACC Decision numbers; Oct 1, 2026 rate per Decision No. 82172. Rider R-14 – Resource Comparison Proxy (RCP) $0.0964 per kWh $0.0868 per kWh $0.0868 per kWh $0.0781 per kWh $0.0703 per kWh $0.0633 per kWh $0.0570 per kWh $0.0513 per kWh $0.0462 per kWh September 21, 2018 October 1, 2019 October 1, 2020 October 1, 2021 October 1, 2022 October 1, 2023 October 1, … Checked November 16, 2026. docs.tep.com
  6. TEP Rider R-14, Resource Comparison Proxy Export Rate (RCP-PRS), Sheet No. 714, Original Sheet 714-0/714-1, effective September 1, 2023, ACC Decision No. 79065. The Company will meter this export power on an instantaneous basis and provide a monthly bill credit based on the purchase rate in this schedule. ... 3. Each Customer’s initial RCP rate will be applicable for 10 years from the time of their interconnection. … Each calendar year, for the customer … Checked November 16, 2026. docs.tep.com
  7. LADWP Electric Rates (rate ordinance, consolidated PDF hosted by LADWP), Service Rider NEM, "Rate Effective September 1, 2008" (ordinance adopting Resolution No. 009-009 of July 2, 2008); later ordinances may have amended rates — check current ordinance. Customer owns and operates a permanent solar or wind turbine electrical generating facility or a hybrid system with a capacity of not more than one megawatt that is located on the customers premises … A credit for the energy received will be calculated using the applicable Rate Schedule energy … Checked November 16, 2026. ladwp.com
  8. PG&E Electric Schedule NBT – Net Billing Tariff (NBT) Service, Cal. P.U.C. Sheets 55440-E et seq.; Advice 6848-E (eff. 2023-03-01), Advice 7174-E (eff. 2024-02-15); CPUC D.22-12-056, D.23-11-068. The NBT schedule may also be referred to as the Solar Billing Plan in customer-facing communications. Residential customers, including Load Aggregation Generating/Aggregated Accounts, taking service on NBT must take service on the E-ELEC (ELECTRIC HOME) rate schedule … For both residential and … Checked November 16, 2026. pge.com
  9. SCE Schedule NBT – Net Billing Tariff, Cal. PUC Sheets 85375-E et seq. (e.g., Sheet 30 = 87700-E); Advice 4961-E/4961-E-A (eff. 2023-03-01), 5170-E-A (eff. 2023-12-14), 5228-E (eff. 2024-02-15), 5533-E (eff. 2025-04-23); D.22-12-056; D.23-11-068. Residential Customers taking service under this Schedule must be on the Prime Option of Schedule TOU-D. … multiplying the hourly-differentiated Customer’s Energy Export (channel 2) in kWh by the applicable Energy Export Credit Price (EEC Price), as defined below, derived from the approved Avoided … Checked November 16, 2026. sce.com
  10. CPUC – Net Billing Tariff page, CPUC web page. The NBT will apply to customers who submit an interconnection application on or after April 15, 2023. Checked November 16, 2026. cpuc.ca.gov
  11. CPUC Decision 22-12-056, Decision Revising Net Energy Metering Tariff and Subtariffs (R.20-08-020), issued Dec. 19, 2022, D.22-12-056, Table 7 and §8. Table 7. Adopted Initial ACC Plus Adders by Utility ($/kWh) Customer Segment PG&E SDG&E SCE Residential Non-CARE $0.022 $0.000 $0.040 Residential CARE $0.090 $0.000 $0.093 … Because SDG&E net billing tariff customers will have payback periods of less than nine years, the graph does not indicate a glide path. Checked November 16, 2026. docs.cpuc.ca.gov
  12. SDG&E, Solar Billing Plan Export Pricing, page captured May 16, 2026 (2026 export pricing files). The Energy Export Credits for a given installation vintage of customers in a given calendar year are based on the applicable vintage of Avoided Cost Calculator (ACC) forecast of values for that year. ... Take the straight-average ACC value across the Climate Zones for each hour. ... For each hour … Checked November 16, 2026. sdge.com
  13. CPUC, Net Energy Metering and Net Billing - Key Information. Effective: 2023-04-15. Since April 15, 2023, customers applying for interconnection have taken service on the new net billing tariff (NBT) pursuant to D.22-12-056 . ... The IOUs refer to the NBT as the “Solar Billing Plan.” ... Pursuant to D.14-03-041 , customer-generators are allowed to remain on the NEM 2.0 tariff for … Checked November 16, 2026. cpuc.ca.gov
  14. SMUD Rate Schedule SSR – Solar and Storage Rate, Sheets SSR-1 to SSR-3; Resolution No. 21-09-07 (Sept 16, 2021) as amended by Resolution No. 26-04-04 (April 16, 2026); effective June 1, 2026. This Rate Schedule SSR applies to residential, commercial/industrial, and agricultural customers who establish service at a premises that has an electrical generation facility that is fueled by a renewable fuel source on or after March 1, 2022 … The Export Compensation Rate effective June 1, 2026 … Checked November 16, 2026. smud.org
  15. PSCo Colo. PUC No. 8 Electric tariff – Net Metering Service, Schedule NM (in "Entire Tariff" PDF), Sheets 112, 112B, 112C – Advice Letter 1760, issued Feb 7, 2018, effective Mar 10, 2018. that is no larger than one hundred and twenty percent (120%) of the average annual consumption of electricity by the Customer at that site, and that has a rated capacity that does not exceed the Customers service entrance capacity. … Inside of a billing period, excess On Peak energy may be utilized … Checked November 16, 2026. xcelenergy.com
  16. 4 CCR 723-3-3664 Net Metering (Colorado PUC electric rules; text via Cornell LII mirror of the Code of Colorado Regulations). Effective: rule notes list amendments effective 9/30/2015 onward. (I) the retail renewable distributed generation shall be sized to supply no more than 120 percent of the customer's average annual electricity consumption at that site ... (b) ... the excess kWh shall be carried forward from month to month and credited at a ratio of 1:1 against the customer's … Checked November 16, 2026. law.cornell.edu
  17. Eversource – Residential Renewable Energy Solutions (Connecticut) program page, Eversource web page, checked 2026-11-16 (rates approved by PURA). You'll be able to select from two incentive compensation options: Buy-all and Netting. … The Buy-All rate for approved applications submitting in 2025 is $0.3195 per kWh, and the Buy-All rate for approved applications submitting in 2026 is $0.3289 per kWh. This rate includes the REC value. Once … Checked November 16, 2026. eversource.com
  18. DC Municipal Regulations, Title 15, Chapter 9: Net Energy Metering (compiled, updated 4-7-25), DC PSC, 15 DCMR §§ 902–903 (compiled April 7, 2025). Net energy billing applies only to kilowatt-hour usage charges. Net energy billing customers are responsible for all other charges applicable to the customer’s rate class and recovered through fixed amounts or over units other than kilowatt-hours … At the end of the calendar year (December), excess … Checked November 16, 2026. dcpsc.org
  19. Rule 25-6.065, F.A.C. (Florida PSC), text from flrules.org rule document. (e) During any billing cycle, excess customer-owned renewable generation delivered to the investor-owned utility’s electric grid shall be credited to the customer’s [next] billing cycle. (f) Energy credits produced pursuant to paragraph (8)(e) shall accumulate and be used to offset the customer’s … Checked November 16, 2026. flrules.org
  20. Duke Energy Florida, Rate Schedule RS-1, Sheet Nos. 6.120-6.121, Sheet No. 6.120 effective October 1, 2026; Sheet No. 6.121 effective January 1, 2022. EFFECTIVE: October 1, 2026 ... Customer Charge: $ 14.43 ... The Minimum Monthly Bill shall be $30. Checked November 16, 2026. duke-energy.com
  21. FPL Electric Tariff Section 10 – Eighteenth Revised Sheet No. 10.010 "Contract Provisions – Various" (Net Metering of Customer-Owned Renewable Generation), Sheet No. 10.010, effective January 1, 2026. For Customers with renewable generation equipment up to a maximum of 2 MW that have executed an Interconnection Agreement for Customer-Owned Renewable Generation with the Company, the following billing parameters will apply. … If any excess customer-owned renewable generation is delivered to the … Checked November 16, 2026. fpl.com
  22. FPL Electric Tariff Section 8 – Sixty-Third Revised Sheet No. 8.201, Rate Schedule RS-1, Sheet No. 8.201, effective January 1, 2026. MONTHLY RATE: Base Charge: $10.52 ... Minimum: $30.00 Checked November 16, 2026. fpl.com
  23. Georgia Power – Residential Rooftop Solar FAQs, Georgia Power web page, checked 2026-11-16. excess energy generated by a customer's solar panels are credited at the annual Solar Avoided Cost Rate per kilowatt hour (kWh), which is 3.2188 ¢/kWh for the year 2026. During the 2022 rate case, the Public Service Commission approved an additional 4¢/kWh that will be added to the annual solar … Checked November 16, 2026. georgiapower.com
  24. Georgia Power Electric Service Tariff: Renewable and Nonrenewable Resources, Schedule "RNR-11", Schedule RNR-11, Original 11.00, effective with bills rendered for the billing month of January 2023; avoided costs per GPSC Dockets 4822 and 16573. “Excess Energy” is electricity delivered to the grid by a Customer’s generation resource at any time, which exceeds the electricity supplied by the Company to the Customer. … Excess Energy that exceeds the customers total monthly usage, will be credited at the Solar Avoided Energy cost rate. Checked November 16, 2026. georgiapower.com
  25. Hawaiian Electric Rule No. 32 – Smart Renewable Energy Program, Revised Sheets 49.40-A/B, effective Feb 1, 2025; Docket No. 2019-0323, Order No. 41153 (Oct 31, 2024); Transmittal Letter Nov 8, 2024. The Smart Renewable Energy Program (also known as the Smart DER Program), is available to customers of Hawaiian Electric Company, Inc. ("Company") who meet the ... Effective February 1, 2025, new Smart Renewable Energy Program Eligible Customer-Generators will be served on the Eligible … Checked November 16, 2026. hawaiianelectric.com
  26. Hawaiian Electric – Smart Renewable Energy Export program page, Hawaiian Electric web page, checked 2026-11-16. Smart Renewable Energy (SRE) - Export rates for 2024-2026 Island Overnight (9pm - 9am) Daytime (9am - 5pm) Evening Peak (5pm - 9pm) Oahu 18.9 cents/kWh* 13.5 cents/kWh* 32.9 cents/kWh* Maui 13.1 cents/kWh* 6.6 cents/kWh* 18.2 cents/kWh* … Export credits will be trued-up on an annual basis and any … Checked November 16, 2026. hawaiianelectric.com
  27. Idaho PUC Final Order No. 36785, Case No. IPC-E-25-15 (service date Sept 30, 2025), Order No. 36785; builds on Order No. 36048 (Case IPC-E-23-14). The Company stated the Order approved changes to its on-site generation service offerings including implementing, effective January 1, 2024, a seasonal and time-variant ECR with avoided cost-based value considerations for excess energy exported to the C[ompany] … an ECR update where the change in … Checked November 16, 2026. puc.idaho.gov
  28. Idaho Power, "Important Reminder For Your Renewable Energy System 2026" (customer generation brochure, 31180-I-0391), Idaho Power brochure (2026). Export Credit Rate Summer On-Peak ..... 15.6836 per kilowatt-hour (kWh) Off-Peak ..... 3.3920 per kWh Non-Summer On-Peak ..... N/A Off-Peak ..... 2.9019 per kWh ... These rates are effective as of Oct. 1, 2025. … A Net Billing customer shall receive a credit for Exported Energy at the applicable … Checked November 16, 2026. docs.idahopower.com
  29. ComEd, "2025 Changes to Net Metering" (062024), ComEd customer document, 2024; implements CEJA (P.A. 102-0662). Full retail rate net metering will no longer be available to customers interconnecting renewable energy systems after December 31, 2024. Customers receiving permission to operate after such date will be eligible to receive only energy supply credits for their excess energy sent back to the grid. … … Checked November 16, 2026. azure-na-assets.contentstack.com
  30. ComEd Green Power Connection – Net Metering FAQ (2026, doc 20099-1, 0616A), ComEd FAQ, June 2026. Customers purchasing energy from ComEd at hourly prices receive net metering credits based on the price of power during the hours excess energy is produced and are reflected as a monetary credit on their energy bill. … Net metering credits, whether kWh or monetary, do not expire for customers who … Checked November 16, 2026. comed.com
  31. IURC Technical Conference handout reproducing IC 8-1-40 (P.L. 264-2017) (2017-07-20). Effective: P.L. 264-2017; EDG from 2022-07-01 at latest. equals the product of: (1) the average marginal price of electricity paid by the electricity supplier during the most recent calendar year; multiplied by (2) one and twenty-five hundredths (1.25). ... IC 8-1-40-18 ... Any excess credit shall be carried forward and applied against fu[ture charges] … Checked November 16, 2026. secure.in.gov
  32. Kentucky PSC Order, Case No. 2023-00413 (Duke Energy Kentucky), 2024-10-11. Effective: SB 100 (2019); order 2024-10-11. Pursuant to KRS 278.466(3), customers taking service under Rider NM -2 will be compensated for electricity fed into the grid over a billing period at a rate set by the Commission using ratemaking processes ... KRS 278.466(4) provides that compensation: [S]hall be in the form of a dollar-denominated … Checked November 16, 2026. psc.ky.gov
  33. Duke Energy Kentucky, KY P.S.C. Electric No. 2, First Revised Sheet No. 84, Rider NM II (Net Metering II Rider), issued and effective July 10, 2026; Kentucky PSC Order of June 1, 2026, Case No. 2025-00258. Issued by authority of an Order of the Kentucky Public Service Commission dated June 1, 2026 in Case No. 2025-00258. ... Effective: July 10, 2026 ... Energy $0.056893 ... TOTAL $0.074805 … The dollar-denominated bill credit will be applied only to per kWh charges of the customer's electric bill. … Checked November 16, 2026. psc.ky.gov
  34. Md. Code Ann., Public Utilities § 7-306 (Maryland General Assembly statute text), PUA § 7-306 (current text as served 2026-11-16). make it available to eligible customer–generators on a first–come, first–served basis until the earlier of: (i) the date on which the rated generating capacity owned and operated by eligible customer–generators in the State reaches 3,000 megawatts; or (ii) July 1, 2027. … “Net excess generation” … Checked November 16, 2026. mgaleg.maryland.gov
  35. NSTAR Electric Company d/b/a Eversource Energy – Net Metering, M.D.P.U. No. 68N (cancels 68M), M.D.P.U. No. 68N, filed Oct 31, 2025, effective January 1, 2026. Nameplate Cap Exempt Facility means a Class I Net Metering Facility that is an eligible Renewable Energy Generating Facility pursuant to M.G.L. c. 164, § 138 … a. the basic service charge (in the ISO-NE load zone where the Host Customer is located); b. the distribution charge; c. the transmission … Checked November 16, 2026. eversource.com
  36. Massachusetts Electric Co./Nantucket Electric Co. – Net Metering Provision, M.D.P.U. No. 1625 (cancels No. 1598), M.D.P.U. No. 1625, issued Jan 15, 2026, effective March 1, 2026; D.P.U. 23-140-B (cap-exempt transition). Nameplate Cap Exempt Facility means a Class I Net Metering Facility that is an eligible Renewable Energy Generating Facility pursuant to M.G.L. c. 164 § 138 ... and has a nameplate capacity rating equal to or less than 25 kilowatts AC. … The Standard Net Metering Credit shall be calculated for each … Checked November 16, 2026. nationalgridus.com
  37. Xcel Energy (NSP-Minnesota) Minnesota Electric Rate Book – MPUC No. 2, Section 9, Rate Code A50, 28th Revised Sheet No. 9-2, Sheet 9-2, filed 07-17-20, effective 12-24-20, Docket No. E002/M-20-606 (Order 11-24-20). Available to any qualifying facility (QF) of less than 40 kW AC capacity who receives non-time of day retail electric service from Company and offsets energy delivered by Company. The A50 Rate Code applies to the extent the energy delivered by the customer exceeds that supplied by the Company … Checked November 16, 2026. xcelenergy.com
  38. Minn. Stat. §216B.164. A cooperative electric association or municipal utility may charge an additional fee to recover the fixed costs not already paid for by the customer through the customer's existing billing arrangement. ... a qualifying facility having less than 40-kilowatt capacity may elect that the compensation … Checked November 16, 2026. revisor.mn.gov
  39. NV Energy (Nevada Power) – Electric Rate Schedules for Residential and General Service Customer Generation, effective July 1, 2026 (bill insert np_netmetering_rates-7_1_30), PUCN-authorized rates effective 2026-07-01. The Public Utilities Commission of Nevada has authorized changes to Nevada Power Company d/b/a NV Energy rates effective July 1, 2026. … Basic Service Charge, per month ........... $ 18.00 Electric Consumption (BTGR + BTER) ... All kWh, per kWh ....................... $ 0.11622 ... NMR-405 (Tier 1) … Checked November 16, 2026. nvenergy.com
  40. Eversource (Public Service Company of New Hampshire) NHPUC No. 10, Terms and Conditions, Net Metering, 1st Revised Pages 24A-24C, issued November 27, 2024, effective January 1, 2025; authorized by NHPUC Order No. 27,074. Customers receiving a net metering capacity allocation while this Alternative Net Metering Tariff is in effect will be entitled to the net metering design and structure then in effect through December 31, 2040. … If such net energy usage is less than zero, customers that receive Default Energy … Checked November 16, 2026. puc.nh.gov
  41. PSE&G Tariff for Electric Service, B.P.U.N.J. No. 17 Electric, Standard Terms and Conditions Section 15, Net Metering Installations (Original Sheet Nos. 38-40), sheets effective October 15, 2024; tariff compilation effective October 1, 2026. the Qualified Customer-Generator shall be credited for the excess kilowatt-hours to the next billing period. At the end of the annualized period the Qualified Customer-Generator will be compensated for any remaining credits by the Qualified Customer-Generator's electric supplier or basic generation … Checked November 16, 2026. nj.pseg.com
  42. NJ BPU Order, Novitium Energy / Edgewater Borough remote net metering, BPU Docket No. QO22100635 (Agenda 11/9/22, Item 8D), cites N.J.A.C. 14:8-4.2 and 14:8-4.3(e). Consistent with current net metering practice and N.J.A.C. 14:8-4.3(e), any individual receiving account holding credits at the end of an annualized period shall be trued up at the avoided cost of wholesale power as defined at N.J.A.C. 14:8-4.2. Checked November 16, 2026. nj.gov
  43. NJ BPU, N.J.A.C. 14:8 readoption proposal (courtesy copy, April 21, 2011) — definition of "annualized period", N.J.A.C. 14:8-4.2, 14:8-4.3 (proposal text; current codified text not checked). "Annualized period" means a period of 12 consecutive monthly billing periods. Checked November 16, 2026. nj.gov
  44. NJ BPU, Net metering technical conference slides, Docket QO24090723 (2025-02-10). Effective: 2025-02-10. the board may authorize an electric power supplier or basic generation service provider to cease offering net metering to customers that are not already net metered whenever the total rated generating capacity owned and operated by net metering customer -generators Statewide equals 5.8 percent of … Checked November 16, 2026. nj.gov
  45. NYSERDA, "Value of Distributed Energy Resources – Phase 1 Order: Highlights for Mass Market and Residential", NY PSC VDER Phase One Order, Case 15-E-0751 (March 9, 2017). Phase One NEM is similar to NEM compensation except: − Phase One NEM projects are subject to a 20-year term − Credits will carry over from month to month and year to year − After a 20-year peri[od] ... Checked November 16, 2026. nyserda.ny.gov
  46. NYSERDA, VDER Frequently Asked Questions, NYSERDA FAQ. VDER Phase One does not permit the payout of credits at any time including at the end of a project’s annual period. Annual carryover of credits under VDER Phase One is permitted until the end of the project’s Phase One compensation term of 20 years for Phase One NEM and 25 years for Phase One Value Stack. Checked November 16, 2026. nyserda.ny.gov
  47. NYSERDA NY-Sun, "2026 Utility Published Customer Benefit Contribution Rates" (SUN-RSC-cbc-fs-1-v8, 4/26), NY PSC Order Addressing Customer Benefit Contribution Charges (Case 15-E-0751); utility statements filed with DPS. Utility 2026 Final Residential CBC Rate $/kW-mo. ... Central Hudson $1.67 ... Con Edison $1.29 ... LIPA $1.13 ... National Grid $0.97 ... NYSEG $1.19 ... Orange & Rockland $1.00 ... RG&E $1.31 … Residential and small commercial customers who interconnect solar PV at their site on or after January … Checked November 16, 2026. nyserda.ny.gov
  48. LIPA Tariff for Electric Service (June 2026 compiled PDF), Net Metering, Section I.C.15.h — Leaf 34F-1 (Sixth Revised, eff. June 1, 2024) and Leaf 34F-2 (Third Revised, eff. April 1, 2023). For Mass Market Projects and Commercial Demand NEM Projects served under a rate code with multiple rate periods, peak and off-peak periods will be treated separately when calculating and applying any credits. … In the event that the amount of electricity provided to the Authority by an eligible … Checked November 16, 2026. lipower.org
  49. LIPA Statement No. 5 – Customer Benefit Contribution (CBC) Charge, Statement No. 5, effective January 1, 2026. Daily Customer Benefit Contribution Rate ($/kW DC installed capacity) ... Residential $0.0372 Checked November 16, 2026. lipower.org
  50. NC Public Staff – Net Metering (summary of NCUC Order Approving Revised Net Metering Tariffs, Docket E-100, Sub 180, March 23, 2023, and Order Granting Extension of Time, May 17, 2023), NCUC Docket No. E-100, Sub 180. The current residential net metering rider (Rider NM) is closed to new customers as of September 30, 2023. The revised Net Metering riders (Residential Solar Choice (Rider RSC) and Net Metering Bridge (Rider NMB)) are effective October 1, 2023 for residential customers. … the excess energy you … Checked November 16, 2026. publicstaff.nc.gov
  51. Duke Energy Carolinas, Residential Solar Choice Rider RSC, NC Third Revised Leaf No. 141, effective January 1, 2025; NCUC Docket No. E-100, Sub 180. Net Excess Energy Credit per month, per kWh 4.53¢ ... Effective for service rendered on and after January 1, 2025 ... Net Excess Energy Credit per month, per kWh 3.94¢ ... Effective for service rendered on and after April 1, 2026 … There shall be a monthly minimum bill of $22 specific to the … Checked November 16, 2026. duke-energy.com
  52. Duke Energy Progress, Residential Solar Choice Rider RSC, NC Fourth Revised Leaf No. 670, effective April 1, 2026; NCUC Docket No. E-2, Sub 1396, Order dated March 16, 2026. Net Excess Energy Credit per month, per kWh 4.53¢ ... Effective for service rendered on and after January 1, 2025 ... Net Excess Energy Credit per month, per kWh 3.94¢ ... Effective for service rendered on and after April 1, 2026 … There shall be a monthly minimum bill of $22 specific to the … Checked November 16, 2026. duke-energy.com
  53. Pacific Power Oregon Schedule 135 – Net Metering Service Optional for Qualifying Customers, P.U.C. OR No. 36, Second Revision of Sheet 135-1 (Advice 25-013, effective Aug 1, 2025); Sheet 135-3 (Advice 11-015, effective Nov 1, 2011). with a capacity of not more than twenty-five (25) kilowatts for residential customers and two (2) megawatts for non-residential customers that is located on the Customers’ premises … shall be credited for such Net Metering Energy with a cumulative kilowatt-hour credit to be applied at the full … Checked November 16, 2026. pacificpower.net
  54. ORS 757.300 Requirement to provide net metering (text via oregon.public.law). An electric utility may value the excess kilowatt-hours at the avoided cost of the utility ... (d) For the billing cycle ending in March of each year ... any remaining unused kilowatt-hour credit accumulated during the previous year shall be granted to the electric utility for distribution to … Checked November 16, 2026. oregon.public.law
  55. S.C. Code §58-40-20 Net energy metering; solar choice metering. Effective: 2019-05-16; amended 2025-05-12. (B) An electrical utility shall make net energy metering available to all customer-generators who apply before June 1, 2021, according to the terms and conditions provided to all parties in Commission Order No. 2015-194. Customer-generators who apply for net metering after the effective date of … Checked November 16, 2026. scstatehouse.gov
  56. Duke Energy Carolinas (South Carolina), Service Regulations, SC Original Leaf No. 401, effective August 1, 2024; PSCSC Docket No. 2023-388-E, Order No. 2024-445. Net metering is available under Riders RNM, IRSC, RSC and NSC for installed customer generation systems and equipment that comply with the provisions outlined in the South Carolina Standard for Interconnecting Small Generation 100 kW or Less ... Effective August 1, 2024 Checked November 16, 2026. duke-energy.com
  57. Rocky Mountain Power Utah Electric Service Schedule No. 137 – Net Billing Service, P.S.C.U. No. 52; Sheet 137.1 & 137.4 (Docket 24-035-04, eff. Apr 25, 2025); First Revision Sheet 137.3 (Docket 26-035-T03, filed Jan 26, 2026, eff. Mar 1, 2026). with a capacity of not more than twenty-five (25) kilowatts for a residential facility or two (2) megawatts for a non-residential facility … Billing Months – June through September inclusive 4.855¢ per kWh for all exported kWh Billing Months – October through May inclusive 4.033¢ per kWh for all … Checked November 16, 2026. rockymountainpower.net
  58. Va. Code §56-594 Net energy metering provisions (both versions: until and from Jan 1, 2027). (i) has a capacity of not more than 25 kilowatts for residential customers and not more than three megawatts for nonresidential customers ... "Net metering period" means the 12-month period following the date of final interconnection ... until the rated generating capacity ... reaches six percent, … Checked November 16, 2026. law.lis.virginia.gov
  59. Virginia SCC, Order on Clarification, Case No. PUR-2025-00079 (May 20, 2026), Doc. Con. Cen. No. 260550045 (copy hosted by Piedmont Environmental Council), SCC Case PUR-2025-00079; Final Order April 30, 2026; Order on Clarification May 20, 2026. With respect to Dominion’s NEM 2.0 tariff, the April 30 Final Order did the following, among other things: (i) it maintained the existing energy-based accounting for netting imported and exported electricity over the net metering period; (ii) it set the export credit rate paid to … Checked November 16, 2026. pecva.org
  60. Energy Information Administration, Electricity retail sales, residential average price, electricity/retail-sales, sector RES, released October 23, 2026. eia.gov
  61. Louisiana PSC, 2026 Avoided Cost Rate by Electric Utility (docx). Effective: 2026. Entergy Louisiana, LLC | $0.0386407 per kWh Effective April 1, 2026 ... Cleco Power, LLC | $0.03854 per kWh Effective March 1, 2026 ... Southwestern Electric Power Company | $0.03656 per kWh Effective April 1, 2026 Checked November 16, 2026. lpsc.louisiana.gov
  62. Mississippi Power, Renewable Energy Net Metering Rate Schedule RENM-3 (MPSC Schedule No. 59). Effective: 2025-05-27. EFFECTIVE DATE May 27, 2025 ... adjusted upward to include the Distributed Generation Value, as defined in the MDGR, in the amount of 2.5 ¢/kWh for all participants. This 2.5 ¢/kWh adder will remain in place for twenty-five (25) years from the date of installation ... For customers qualifying as … Checked November 16, 2026. mississippipower.com
  63. Hawaiian Electric, Smart Renewable Energy Export. Effective: 2024-2026 rate period. Export Rates will be updated every 3 years. ... There is no capacity limit for this program ... System size limit will be governed by Rule 14H. ... Starting on Oct. 1, 2024, Customer Grid-Supply, Customer Grid-Supply Plus and Smart Export will be transitioned to the Smart Renewable Energy Export … Checked November 16, 2026. hawaiianelectric.com
  64. NC Utilities Commission Public Staff, Net Metering. Effective: 2023-10-01. On March 23, 2023, in Docket No. E-100, Sub 180 , the Commission issued its Order Approving Revised Net Metering Tariffs ... The current residential net metering rider (Rider NM) is closed to new customers as of September 30, 2023. The revised Net Metering riders (Residential Solar Choice (Rider … Checked November 16, 2026. publicstaff.nc.gov
  65. Duke Energy Progress, Net Metering Bridge Rider NMB, NC Fourth Revised Leaf No. 605, effective April 1, 2026; NCUC Docket No. E-2, Sub 1396. This Rider will be closed to new participants on and after January 1, 2027. ... shall remain eligible for service under this Rider for up to 15 calendar years from the submission date of the applicable interconnection application ... 2026 43,500 Checked November 16, 2026. duke-energy.com
  66. RSA 362-A:9, Net Energy Metering (New Hampshire General Court). XV. Standard tariffs that are available to eligible customer-generators under this section shall terminate on December 31, 2040 and such customer-generators shall transition to tariffs that are in effect at that time. ... may elect to receive a payment from the distribution utility either on an … Checked November 16, 2026. gc.nh.gov
  67. NH PUC Order No. 27,074, Docket DE 22-060, Order on Net Metering (November 18, 2024). Effective: November 18, 2024. Retain the existing compensation levels for all net-metered customer- generators in the Alternative Net Energy Metering Tariff approved in Order No. 26,029 (NEM 2.0); ... receive compensation for each exported kWh of electricity at a rate of 100 percent of the default service (energy) charge, 100 … Checked November 16, 2026. puc.nh.gov
  68. Colorado Session Laws 2026, Ch. 127, House Bill 26-1007. Effective: ~2026-08-12 (90 days after adjournment). (1.3) ON OR BEFORE DECEMBER 31, 2026, THE COMMISSION SHALL REVISE EXISTING RULES TO: (a) REQUIRE A QUALIFYING RETAIL UTILITY TO POST AND MAINTAIN ON ITS WEBSITE A PUBLIC LIST OF AT LEAST ONE METER COLLAR ADAPTER ... (VII) ON AND AFTER JANUARY 1, 2027, A PORTABLE-SCALE SOLAR GENERATION DEVICE, AS … Checked November 16, 2026. leg.colorado.gov
  69. Md. Code, Public Utilities §7-306.4. Effective: successor to begin 2027-07-01. (c) On or before February 1, 2027, the Commission, by order or regulation, shall approve, as a successor program to the net energy metering program under § 7–306 of this subtitle, a framework for a net energy metering program to begin July 1, 2027, that: (1) provides incentives for the development … Checked November 16, 2026. mgaleg.maryland.gov
  70. Md. Code, Public Utilities §7-306. on a first–come, first–served basis until the earlier of: (i) the date on which the rated generating capacity owned and operated by eligible customer–generators in the State reaches 3,000 megawatts; or (ii) July 1, 2027. ... the dollar value of net excess generation shall be equal to the generation … Checked November 16, 2026. mgaleg.maryland.gov
  71. National Laboratory of the Rockies (formerly NREL), PVWatts v8 model estimates, Typical-year weather (NSRDB), state mean center of population. pvwatts.nlr.gov
  72. 52 Pa. Code §75.13 General provisions (net metering) - via Cornell LII mirror of the Pennsylvania Code. (d) An EDC and DSP shall credit a customer-generator at the full retail kilowatt-hour rate, which shall include generation, transmission and distribution charges ... Any excess kilowatt hours that are not offset by electricity used by the customer in subsequent billing periods shall continue to … Checked November 16, 2026. law.cornell.edu
  73. PUCT 'Solar Guide for Consumers' (March 2026) - PUCT publication, copy hosted by City of Bellville. Effective: March 2026. Buyback rate is the price you are paid for any electricity you put back onto the grid. • Rules for the buyback rate depend on what kind of provider you have. • In areas where you can shop for your retail electric plan, you can shop for a plan with a buyback rate and other features. ... The buyback … Checked November 16, 2026. cityofbellville.com
  74. 26 U.S.C. §25D, Residential clean energy credit, Text current through Public Law 119-142 (November 10, 2026). in the case of property placed in service after December 31, 2021, 30 percent … The credit allowed under this section shall not apply with respect to any expenditures made after December 31, 2025. … an expenditure with respect to an item shall be treated as made when the original installation of … Checked November 16, 2026. uscode.house.gov
  75. 26 U.S.C. §48E, Clean electricity investment credit, Text current through Public Law 119-142 (November 10, 2026). with a maximum net output of less than 1 megawatt (as measured in alternating current) … This section shall not apply to any qualified property placed in service by the taxpayer after December 31, 2027, which is part of an applicable facility. … This paragraph shall not apply with respect to any … Checked November 16, 2026. uscode.house.gov

Rules are quoted from the official text and dated; how we check them: methodology. Not legal or tax advice. Found an error? Write to [email protected]; corrections are listed on the updates page.