National Grid net metering: one brand, two rulebooks

Published November 16, 2026. Rules checked November 16, 2026.

  • Net metering Massachusetts: Net Metering Provision (M.D.P.U. No. 1625). Standard Net Metering Credit: excess kWh times basic service, distribution, transmission and transition charges.1
  • Net metering New York: VDER Phase One net energy metering. kWh net metering with a 20-year term; Customer Benefit Contribution of $0.97 per kW-DC a month in 2026.234

EIA counted 142,396 residential net-metering installations at National Grid at the end of 2025, 112 of them with a paired battery.5

Tariffs checked November 16, 2026; EIA-861 2025 final data, released October 7, 2026.

Where National Grid serves net-metered customers
States where National Grid reports net-metering customers

Source: Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data; Census Bureau, Cartographic boundary files, states. States shaded by their program type; EIA-861 2025 rows of the utility.

Show the numbers
StateResidential installations
Massachusetts (Massachusetts Electric Co)114,598
New York (Niagara Mohawk Power Corp.)27,798

National Grid does not pay cash for the solar power a home exports. It credits the bill. In Massachusetts the credit is a dollar amount, priced at four of the customer's own per-kWh charges, and any balance carries forward from bill to bill;1 in New York, credits are kilowatt-hours that roll forward for a 20-year term and are never paid out.3

What National Grid credits for exported solar

National Grid's two residential solar territories sit under different regulators and different rules. Massachusetts Electric (with Nantucket Electric) follows its Net Metering Provision, M.D.P.U. No. 1625, effective March 1, 2026.1 Niagara Mohawk, National Grid's New York company, follows the Public Service Commission's VDER Phase One net energy metering.2 Both are net metering in the strict sense: an exported kilowatt-hour is credited at retail-level prices, not at a separate export rate. What differs is the unit of the credit, how long it lasts and what a new system pays to join.

Massachusetts (Massachusetts Electric, Nantucket Electric)New York (Niagara Mohawk)
RuleNet Metering Provision, M.D.P.U. No. 1625, effective March 1, 2026VDER Phase One NEM, Case 15-E-0751
Credit for excess energyA dollar credit: excess kWh × basic service + distribution + transmission + transition chargeskWh carried to later bills
NettingEach billing periodMonth to month and year to year
Unused creditCarried forward from billing period to billing period1Carried over until the 20-year term ends; never paid out3
How long the terms lastMarket Net Metering Credits after 25 years from authorization to interconnect720-year term2
Customer Benefit ContributionNot applicable (a New York charge)Customer Benefit Contribution, $0.97 per kW-DC a month in 2026, for systems from January 1, 20224

Retail prices are high in both states, which is what makes a retail-level credit worth tracking. Massachusetts homes paid an average of 30.39¢ per kWh and New York homes 28.60¢ per kWh over the 12 months to August 2026, 3rd highest and 6th highest8 among the states. These are averages of all residential revenue per kWh, fixed charges included, not National Grid tariff rates.

Massachusetts: a credit priced at four charges

The Standard Net Metering Credit is calculated for each billing period as 100% of the excess kilowatt-hours, by time of use where the rate has periods, multiplied by the sum of four National Grid charges for the customer's rate class: basic service, distribution, transmission and transition.1 The tariff follows the state formula in 220 CMR 18.04.7

On a National Grid bill that has three practical effects.

  • Only the net excess earns a credit. Production used in the house never reaches the meter as an export, and within a billing period exports first offset what the home bought.
  • The credit is in dollars, not kWh. It is valued at the per-kWh charges of the period in which the excess occurred. The monthly customer charge is not a kWh charge and is not in the formula, and per-kWh charges outside the four named ones do not count either.
  • The balance does not expire. The company "shall carry forward, from Billing Period to Billing Period, any remaining Net Metering Credit balance".1 The provision sets no annual true-up date and no cash-out, so a summer surplus waits on the account for winter bills.
National Grid in Massachusetts: solar export rules
RuleWhat applies
Program typeNet metering
ProgramNet Metering Provision (M.D.P.U. No. 1625)
Export creditStandard Net Metering Credit: excess kWh times basic service, distribution, transmission and transition charges1
Netting intervalMonthly
Unused credits and chargesCredits carry forward indefinitely

The 25 kW AC line and the cap

Searches for a "National Grid net metering cap" usually concern Massachusetts, where caps exist but most home systems are outside them. The tariff defines a "Nameplate Cap Exempt Facility" as an eligible Class I facility with a nameplate capacity of 25 kilowatts AC or less, and such a facility receives the Standard Net Metering Credit.1

Above that line, two things change. Facilities that are not exempt count against the state's aggregate limits: 7% of the distribution company's highest historical peak load for private facilities and 8% for municipal and other governmental ones.97 And new solar facilities that are not exempt receive Market Net Metering Credits, a "Net Metering Credit based on 60% of net excess generation" at the same four charges. The 25 kW threshold is measured in kilowatts AC, not in the DC rating of the panels.1

The 25-year switch

The full credit does not last for the life of the panels. Under 220 CMR 18.04, a Class I solar net metering facility receives Market Net Metering Credits after 25 years from the date on which it was first authorized to interconnect.7 The date that counts is National Grid's authorization, so the interconnection approval letter is the document that fixes when a system's credit basis changes, including for a later buyer of the house.

Massachusetts Electric's place in the state

Massachusetts Electric reported 114,598 residential net-metering installations to EIA for 2025, 55% of the state's total and more than any other Massachusetts utility. Only 112 of them were reported with a paired battery, against 2,6745 statewide.

Residential net-metering installations by utility, Massachusetts, 2025
Fitchburg Gas & Elec Light Co4,045
City of Taunton - (MA)485
Town of Reading - (MA)339
Nantucket Electric Co313

Source: Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data. EIA-861 utility rows, all technologies; utility names as reported to EIA.

Show the numbers
UtilityResidential installations
Massachusetts Electric Co114,598
NSTAR Electric Company89,526
Fitchburg Gas & Elec Light Co4,045
City of Taunton - (MA)485
Town of Reading - (MA)339
Nantucket Electric Co313
Town of Shrewsbury - (MA)173
Town of Wellesley - (MA)164
Town of Middleborough - (MA)125
Town of Littleton - (MA)121
Town of Danvers70
City of Chicopee - (MA)54
Town of Mansfield - (MA)49
City of Peabody - (MA)48
Town of North Attleborough - (MA)45
Town of Braintree - (MA)44
City of Westfield - (MA)19
City of Holyoke - (MA)12

The state rules, Eversource's tariff and the municipal light plants that set their own terms are covered on the Massachusetts net metering page.

New York: kilowatt-hours on a 20-year term

Niagara Mohawk is one of the six investor-owned utilities whose residential solar customers are compensated under Phase One net energy metering. NYSERDA's summary of the Phase One order describes it as similar to earlier net metering, except that projects are subject to a 20-year term and credits carry over from month to month and year to year.2

Because the credit is in kilowatt-hours, an exported kWh later cancels a purchased kWh. There is no cash at the end: VDER Phase One does not permit the payout of credits at any time, including at the end of a project's annual period, and carryover continues only until the 20-year compensation term ends.3 A system sized well beyond the home's use builds a bank of credits that National Grid never pays for.

National Grid in New York: solar export rules
RuleWhat applies
Program typeNet metering
ProgramVDER Phase One net energy metering
Export creditkWh net metering with a 20-year term; Customer Benefit Contribution of $0.97 per kW-DC a month in 2026234
Netting intervalMonthly
Unused credits and chargesNo payout; credits roll forward for the 20-year term

The Customer Benefit Contribution

New York's change for new systems is a charge, not a lower credit. Residential and small commercial customers who interconnect solar on or after January 1, 2022 pay a Customer Benefit Contribution (CBC), a billing item calculated on the system's DC size; systems interconnected earlier do not pay it.4

National Grid's 2026 residential rate for net-metered systems is $0.97 per kW-DC per month, the lowest of the rates NYSERDA published for the state's utilities, against $1.29 at Con Edison and $1.67 at Central Hudson. The monthly amount is that rate times the array's kilowatts of DC panel capacity, so it is the same in a cloudy month as in a sunny one. CBC rates change annually and customers do not lock in a rate when they connect, so the 2026 figure is not a promise for later years.4

What changed and when
DateWhereWhat changed
January 1, 2022New YorkNew York adds a Customer Benefit Contribution for new solar. Residential solar interconnected on or after January 1, 2022 pays a monthly charge per kW-DC that changes every year.4

Niagara Mohawk's place in the state

National Grid reported 27,798 residential net-metering installations in New York for 2025, 11%5 of the state's total. Long Island's utility and Con Edison have the larger counts; the New York net metering page compares the utilities, and Con Edison has its own page.

New York also has a state income tax credit for solar equipment, equal to 25% of qualified expenditures and limited to $5,000; it is not refundable, but an amount above the tax due can be carried over for up to five years.10

Before applying: size, dates and the tariff text

The verified rules point to three things to settle before a National Grid application.

  1. In Massachusetts, the AC rating. A system of 25 kilowatts AC or less is cap-exempt and earns the Standard credit; a larger new solar system faces the cap and the 60% Market credit.1
  2. In New York, the DC rating. The CBC is billed per kW-DC, so DC panel capacity, not the AC rating, sets the monthly charge for a system interconnected on or after January 1, 2022.
  3. The interconnection date. It starts the 25-year clock in Massachusetts and decides whether the CBC applies in New York.74

The Massachusetts terms are in National Grid's Net Metering Provision, M.D.P.U. No. 1625.1 New York's CBC rates for every utility are on NYSERDA's 2026 rate sheet.4

National Grid solar by the numbers

The brand's solar base is mostly a Massachusetts story. Of 142,396 residential installations (984 MW) at the end of 2025, four in five are on Massachusetts Electric's system, which on its own ranks 8th5 among US utility-state counts; upstate New York accounts for the rest.

Federal tax credit

New York's state credit (above) remains; the federal homeowner credit does not. Section 25D ended for expenditures made after December 31, 2025, and the completion of installation, not payment, dates the expenditure, so a National Grid system finished in 2026 is outside it in either state. Unused federal credit from a system completed in 2025 rolls into the next tax year.11

Leased and PPA systems are common in Massachusetts: third-party owners reported 98,147 residential customers there, about 47%5 of residential net-metered solar. The §48E business credit for those systems is the solar company's, never the household's, and once construction starts after July 4, 2026 it depends on the system being in service by December 31, 2027.1213 The lease or PPA decides whether any of it shows up in the price. See the federal solar tax credit page.

Questions and answers

Does National Grid buy back solar power?

Not for cash in either state. In Massachusetts the company carries forward any remaining Net Metering Credit balance from billing period to billing period.1 In New York, VDER Phase One does not permit the payout of credits at any time, including at the end of a project's annual period.3

How much does National Grid pay for solar electricity in Massachusetts?

For a home system, each excess kWh in a billing period is credited at the sum of the customer's basic service, distribution, transmission and transition kWh charges, under the Standard Net Metering Credit in M.D.P.U. No. 1625.1

Is there a National Grid net metering cap?

A Class I facility of 25 kilowatts AC or less is a Nameplate Cap Exempt Facility, outside the caps.1 Facilities that are not exempt count against limits of 7% (private) and 8% (public) of the distribution company's highest historical peak load.97

How does National Grid net metering work in New York?

Homes are on Phase One net energy metering: kWh netting like earlier net metering, but with a 20-year term and credits that carry over from month to month and year to year.2

What is the solar charge on a National Grid New York bill?

The Customer Benefit Contribution. For systems interconnected on or after January 1, 2022, National Grid's 2026 residential rate is $0.97 per kW-DC a month; the rate changes every year.4

Related pages

Sources

  1. Massachusetts Electric Co./Nantucket Electric Co. – Net Metering Provision, M.D.P.U. No. 1625 (cancels No. 1598), M.D.P.U. No. 1625, issued Jan 15, 2026, effective March 1, 2026; D.P.U. 23-140-B (cap-exempt transition). Nameplate Cap Exempt Facility means a Class I Net Metering Facility that is an eligible Renewable Energy Generating Facility pursuant to M.G.L. c. 164 § 138 ... and has a nameplate capacity rating equal to or less than 25 kilowatts AC. … The Standard Net Metering Credit shall be calculated for each … Checked November 16, 2026. nationalgridus.com
  2. NYSERDA, "Value of Distributed Energy Resources – Phase 1 Order: Highlights for Mass Market and Residential", NY PSC VDER Phase One Order, Case 15-E-0751 (March 9, 2017). Phase One NEM is similar to NEM compensation except: − Phase One NEM projects are subject to a 20-year term − Credits will carry over from month to month and year to year − After a 20-year peri[od] ... Checked November 16, 2026. nyserda.ny.gov
  3. NYSERDA, VDER Frequently Asked Questions, NYSERDA FAQ. VDER Phase One does not permit the payout of credits at any time including at the end of a project’s annual period. Annual carryover of credits under VDER Phase One is permitted until the end of the project’s Phase One compensation term of 20 years for Phase One NEM and 25 years for Phase One Value Stack. Checked November 16, 2026. nyserda.ny.gov
  4. NYSERDA NY-Sun, "2026 Utility Published Customer Benefit Contribution Rates" (SUN-RSC-cbc-fs-1-v8, 4/26), NY PSC Order Addressing Customer Benefit Contribution Charges (Case 15-E-0751); utility statements filed with DPS. Utility 2026 Final Residential CBC Rate $/kW-mo. ... Central Hudson $1.67 ... Con Edison $1.29 ... LIPA $1.13 ... National Grid $0.97 ... NYSEG $1.19 ... Orange & Rockland $1.00 ... RG&E $1.31 … Residential and small commercial customers who interconnect solar PV at their site on or after January … Checked November 16, 2026. nyserda.ny.gov
  5. Energy Information Administration, Form EIA-861 Annual Electric Power Industry Report, 2025 final data, Net_Metering_2025.xlsx (f8612025.zip), released October 7, 2026. eia.gov
  6. Census Bureau, Cartographic boundary files, states, cb_2025_us_state_20m. census.gov
  7. 220 CMR 18.04 Calculation of Net Metering Credits (via Cornell LII). each Distribution Company shall calculate for each Billing Period a Net Metering Credit equal to: (a) 100% of the net excess kilowatt-hours, by time of use, if applicable, multiplied by the sum of the following Distribution Company charges ...: 1. basic service kilowatt-hour charge ... 2. … Checked November 16, 2026. law.cornell.edu
  8. Energy Information Administration, Electricity retail sales, residential average price, electricity/retail-sales, sector RES, released October 23, 2026. eia.gov
  9. 220 CMR 18.07 Net Metering Capacity (via Cornell LII). (a) Net Metering facilities that are not Net Metering Facilities of a Municipality or Other Governmental Entity does not exceed 7% of the Distribution Company's highest historical peak load; and (b) Net Metering Facilities of a Municipality or Other Governmental Entity does not exceed 8% Checked November 16, 2026. law.cornell.edu
  10. NYS Dept. of Taxation and Finance, Solar energy system equipment credit. Effective: page updated 2019-12-16. The credit is equal to 25% of your qualified solar energy system equipment expenditures and is limited to $5,000. The solar energy system equipment credit is not refundable. However, any credit amount in excess of the tax due can be carried over for up to five years. Checked November 16, 2026. tax.ny.gov
  11. 26 U.S.C. §25D, Residential clean energy credit, Text current through Public Law 119-142 (November 10, 2026). in the case of property placed in service after December 31, 2021, 30 percent … The credit allowed under this section shall not apply with respect to any expenditures made after December 31, 2025. … an expenditure with respect to an item shall be treated as made when the original installation of … Checked November 16, 2026. uscode.house.gov
  12. Public Law 119-21 (July 4, 2025), sections 70506 and 70513, 139 Stat. 72. Section 25D(h) is amended by striking ``to property placed in service after December 31, 2034'' and inserting ``with respect to any expenditures made after December 31, 2025'' … shall apply to facilities the construction of which begins after the date which is 12 months after the date of enactment of this Act Checked November 16, 2026. govinfo.gov
  13. 26 U.S.C. §48E, Clean electricity investment credit, Text current through Public Law 119-142 (November 10, 2026). with a maximum net output of less than 1 megawatt (as measured in alternating current) … This section shall not apply to any qualified property placed in service by the taxpayer after December 31, 2027, which is part of an applicable facility. … This paragraph shall not apply with respect to any … Checked November 16, 2026. uscode.house.gov

Rules are quoted from the official text and dated; how we check them: methodology. Not legal or tax advice. Found an error? Write to [email protected]; corrections are listed on the updates page.