 "license": "CC BY 4.0, https://creativecommons.org/licenses/by/4.0/",
 "credit": "US Net Metering, https://usnetmetering.com",
 "rules_checked": "2026-11-16",
 "states": [
  {
   "state": "Alabama",
   "usps": "AL",
   "type": "ac",
   "type_label": "No statewide rule (utility buyback)",
   "program": "No statewide net metering rule",
   "export_credit": "Set by each utility; Alabama Power adds a capacity reservation charge for customer generation",
   "netting": "Set by utility",
   "unused_credits": "Set by utility",
   "instrument": "Alabama Power Rate Rider RGB",
   "in_effect": "April 2022 billings (Rider RGB)",
   "sources": "Alabama Power Rate Rider RGB <https://www.alabamapower.com/content/dam/alabama-power/pdfs-docs/Rates/RGB.pdf>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 93,
   "eia_residential_installations_2025": 87,
   "eia_capacity_mw_2025": 1.458
  },
  {
   "state": "Alaska",
   "usps": "AK",
   "type": "nmx",
   "type_label": "Net metering, excess below retail",
   "program": "Net metering (Regulatory Commission of Alaska rules)",
   "export_credit": "Monthly net exports credited in dollars at the utility's non-firm power rate",
   "netting": "Monthly",
   "unused_credits": "Dollar credits do not expire",
   "instrument": "3 AAC 50.900 et seq.",
   "in_effect": "Current rule",
   "sources": "3 AAC 50.910 Net metering of electric energy <https://www.akleg.gov/basis/aac.asp?media=print&secStart=3.50.910&secEnd=3.50.910> | 3 AAC 50.930 Charges or credits for net electric energy <https://www.akleg.gov/basis/aac.asp?media=print&secStart=3.50.930&secEnd=3.50.930>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 3363,
   "eia_residential_installations_2025": 3070,
   "eia_capacity_mw_2025": 19.916
  },
  {
   "state": "Arizona",
   "usps": "AZ",
   "type": "nb",
   "type_label": "Net billing (export rate)",
   "program": "Resource Comparison Proxy (RCP) export rate",
   "export_credit": "Exports credited at a fixed RCP rate that is reset once a year, may not fall more than 10% a year and is kept for 10 years",
   "netting": "None (exports metered instantaneously)",
   "unused_credits": "Credits roll forward; APS pays balances over $25 after December, TEP balances over $10 each October",
   "instrument": "ACC-approved RCP riders (APS Rider RCP, TEP Rider R-14)",
   "in_effect": "Reset each year (APS September 1, TEP October 1)",
   "sources": "Tucson Electric Power, Resource Comparison Proxy Export Rate <https://www.tep.com/rcp/> | APS, Renewable Energy Riders (RCP Export Rider, EPR-6, Legacy EPR-6) <https://www.aps.com/en/Residential/Service-Plans/Compare-Service-Plans/Renewable-Energy-Riders> | APS Rate Rider RCP – Partial Requirements Service for New On-Site Solar DG, Resource Comparison Proxy Export Rate <https://www.aps.com/-/media/APS/APSCOM-PDFs/Utility/Regulatory-and-Legal/Regulatory-Plan-Details-Tariffs/Residential/Renewable-Plans-and-Riders/rcp_RateSchedule.pdf> | TEP Rider R-14, Resource Comparison Proxy Export Rate (RCP-PRS), Sheet No. 714 <https://docs.tep.com/wp-content/uploads/714-Rider-14-RCP.pdf>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 339582,
   "eia_residential_installations_2025": 334117,
   "eia_capacity_mw_2025": 3151.597
  },
  {
   "state": "Arkansas",
   "usps": "AR",
   "type": "nb",
   "type_label": "Net billing (export rate)",
   "program": "Net billing for new customers; legacy net metering kept until 2040",
   "export_credit": "Legacy customers: kWh netting with net excess credited in the next billing period; new customers: the rate structure their utility elects under Act 278",
   "netting": "Monthly (legacy)",
   "unused_credits": "Legacy: carried to the next billing period",
   "instrument": "APSC Net-Metering Rules; Act 278 of 2023; Entergy Arkansas Rate Schedule 52 LN-M",
   "in_effect": "December 31, 2023 (Entergy Arkansas legacy tariff)",
   "sources": "Entergy Arkansas Rate Schedule No. 52 Legacy Net-Metering Service (LN-M), APSC Docket 23-070-TF <https://www.entergyarkansas.com/wp-content/uploads/2024/11/eal_ln-m.pdf> | Act 278 of 2023 (SB 295), Arkansas General Assembly, Customer Protections for Net-Metering Customers Act <https://arkleg.state.ar.us/Acts/FTPDocument?path=%2FACTS%2F2023R%2FPublic%2F&file=278.pdf&ddBienniumSession=2023%2F2023R>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 21026,
   "eia_residential_installations_2025": 19930,
   "eia_capacity_mw_2025": 374.104
  },
  {
   "state": "California",
   "usps": "CA",
   "type": "nb",
   "type_label": "Net billing (export rate)",
   "program": "Net Billing Tariff (Solar Billing Plan)",
   "export_credit": "Exports valued at hourly Avoided Cost Calculator values; early applicants also get a declining ACC Plus adder",
   "netting": "None (imports and exports metered separately)",
   "unused_credits": "Credits roll to an annual true-up; any net surplus is paid at the Net Surplus Compensation rate",
   "instrument": "CPUC Decision 22-12-056",
   "in_effect": "Interconnection applications from April 15, 2023",
   "sources": "CPUC, Net Energy Metering and Net Billing - Key Information <https://www.cpuc.ca.gov/NEM> | CPUC Decision 22-12-056 (R.20-08-020), Ordering Paragraph 1 <https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M500/K043/500043682.PDF>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 2309938,
   "eia_residential_installations_2025": 2252785,
   "eia_capacity_mw_2025": 20713.413
  },
  {
   "state": "Colorado",
   "usps": "CO",
   "type": "nm",
   "type_label": "Net metering (retail credit)",
   "program": "Net metering (PUC Rule 3664)",
   "export_credit": "Excess kWh carried forward month to month and credited 1:1 against retail consumption",
   "netting": "Monthly",
   "unused_credits": "Investor-owned utilities pay for leftover kWh within 60 days of year end at their average hourly incremental cost",
   "instrument": "4 CCR 723-3, Rule 3664",
   "in_effect": "Current rule",
   "sources": "4 CCR 723-3-3664 Net Metering (Colorado PUC electric rules; text via Cornell LII mirror of the Code of Colorado Regulations) <https://www.law.cornell.edu/regulations/colorado/4-CCR-723-3-3664> | C.R.S. §40-9.5-118 Net metering - rules (cooperatives) (copy hosted by Y-W Electric Association) <https://www.ywelectric.coop/sites/default/files/2025-07/crs_40-9.5-118_net_metering_for_coops.pdf>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 200987,
   "eia_residential_installations_2025": 194671,
   "eia_capacity_mw_2025": 1325.439
  },
  {
   "state": "Connecticut",
   "usps": "CT",
   "type": "nb",
   "type_label": "Net billing (export rate)",
   "program": "Residential Renewable Energy Solutions (RRES): Netting or Buy-All",
   "export_credit": "Netting credits excess at the retail rate (2026 applicants also pay a $0.0402/kWh Solar Energy Adjustment on total production); Buy-All pays a fixed rate for all output, $0.3289/kWh for 2026 applications, for 20 years",
   "netting": "Monthly (Netting option)",
   "unused_credits": "Netting credits are cashed out only when service stops",
   "instrument": "PURA RRES program",
   "in_effect": "2026 application year",
   "sources": "CT PURA, Residential Renewable Energy Solutions Program <https://portal.ct.gov/pura/electric/office-of-technical-and-regulatory-analysis/clean-energy-programs/residential-renewable-energy-solutions-program> | Eversource – Residential Renewable Energy Solutions (Connecticut) program page <https://www.eversource.com/rres>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 123513,
   "eia_residential_installations_2025": 119547,
   "eia_capacity_mw_2025": 1506.383
  },
  {
   "state": "Delaware",
   "usps": "DE",
   "type": "nm",
   "type_label": "Net metering (retail credit)",
   "program": "Net energy metering (26 Del. C. §1014)",
   "export_credit": "Monthly excess kWh valued at the volumetric supply and distribution charges, not including societal-benefit charges",
   "netting": "Monthly",
   "unused_credits": "Excess credits carry over to later annualized billing periods",
   "instrument": "26 Del. C. §1014",
   "in_effect": "January 1, 2024",
   "sources": "26 Del. C. ch. 10 (§1014 net metering provisions) <https://delcode.delaware.gov/title26/c010/index.html>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 16903,
   "eia_residential_installations_2025": 16036,
   "eia_capacity_mw_2025": 187.148
  },
  {
   "state": "District of Columbia",
   "usps": "DC",
   "type": "nm",
   "type_label": "Net metering (retail credit)",
   "program": "Net energy metering (D.C. Code §34-1518)",
   "export_credit": "Monthly excess credited in kWh to the next bill; only kWh usage charges can be offset",
   "netting": "Monthly",
   "unused_credits": "In December, excess beyond 100% of annual use is paid at the generation rate; credits over $25 are refunded",
   "instrument": "D.C. Code §34-1518; 15 DCMR ch. 9",
   "in_effect": "Current rules",
   "sources": "D.C. Code §34-1518 Net metering; community renewable energy facilities <https://code.dccouncil.gov/us/dc/council/code/sections/34-1518> | DC Municipal Regulations, Title 15, Chapter 9: Net Energy Metering (compiled, updated 4-7-25), DC PSC <https://dcpsc.org/getattachment/Orders-and-Regulations/Orders-Rules-and-Regulations/District-of-Columbia-Municipal-Regulations-Title-1/15-9-Compiled-(Updated-4-7-25-)-(1).pdf.aspx?lang=en-US>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 34320,
   "eia_residential_installations_2025": 33118,
   "eia_capacity_mw_2025": 260.976
  },
  {
   "state": "Florida",
   "usps": "FL",
   "type": "nm",
   "type_label": "Net metering (retail credit)",
   "program": "Net metering (Rule 25-6.065, F.A.C.)",
   "export_credit": "Excess generation credited as kWh against usage in later months",
   "netting": "Monthly",
   "unused_credits": "Unused credits are paid at the end of each calendar year at the utility's average annual as-available (COG-1) energy rate",
   "instrument": "Fla. Admin. Code R. 25-6.065",
   "in_effect": "Current rule",
   "sources": "Rule 25-6.065, F.A.C. (Florida PSC), text from flrules.org rule document <https://flrules.org/gateway/ruleNo.asp?id=25-6.065>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 325025,
   "eia_residential_installations_2025": 320220,
   "eia_capacity_mw_2025": 3173.179
  },
  {
   "state": "Georgia",
   "usps": "GA",
   "type": "nb",
   "type_label": "Net billing (export rate)",
   "program": "Georgia Power: instantaneous netting with an avoided-cost credit",
   "export_credit": "Every exported kWh earns the solar avoided energy cost (3.2188¢ for 2026) plus a 4¢ adder (Georgia Power)",
   "netting": "Instantaneous (the monthly-netting pilot is closed)",
   "unused_credits": "Credits are summed against the monthly bill",
   "instrument": "Georgia Power tariff RNR-11",
   "in_effect": "January 2023 bills; 2026 avoided cost",
   "sources": "Georgia Power – Residential Rooftop Solar FAQs <https://www.georgiapower.com/residential/solutions/solar/rooftop-installations/faqs.html> | Georgia Power Electric Service Tariff: Renewable and Nonrenewable Resources, Schedule \"RNR-11\" <https://www.georgiapower.com/content/dam/georgia-power/pdfs/residential-pdfs/residential-rate-plans/RNR-11.pdf>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 25253,
   "eia_residential_installations_2025": 24220,
   "eia_capacity_mw_2025": 222.8
  },
  {
   "state": "Hawaii",
   "usps": "HI",
   "type": "nb",
   "type_label": "Net billing (export rate)",
   "program": "Smart Renewable Energy (SRE) Export (Hawaiian Electric)",
   "export_credit": "Exports credited at time-of-day export rates that differ by island (2024–2026 table)",
   "netting": "By time of day (overnight, daytime, evening peak)",
   "unused_credits": "Annual true-up; leftover credits expire",
   "instrument": "Hawaiian Electric Rule No. 32",
   "in_effect": "February 1, 2025 (Rule No. 32)",
   "sources": "Hawaiian Electric, Smart Renewable Energy Export <https://www.hawaiianelectric.com/products-and-services/smart-renewable-energy-programs/smart-renewable-energy-export> | Hawaiian Electric Rule No. 32 – Smart Renewable Energy Program <https://www.hawaiianelectric.com/documents/billing_and_payment/rates/hawaiian_electric_rules/32.pdf>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 108455,
   "eia_residential_installations_2025": 104288,
   "eia_capacity_mw_2025": 718.551
  },
  {
   "state": "Idaho",
   "usps": "ID",
   "type": "nb",
   "type_label": "Net billing (export rate)",
   "program": "Idaho Power: real-time net billing with an Export Credit Rate",
   "export_credit": "Exports credited at a seasonal, time-differentiated avoided-cost Export Credit Rate, frozen until Idaho Power's April 1, 2028 filing",
   "netting": "Real time (no netting)",
   "unused_credits": "Dollar credits offset monthly charges",
   "instrument": "Idaho PUC Order No. 36785 (Case IPC-E-25-15)",
   "in_effect": "October 1, 2025 (current rates)",
   "sources": "Idaho PUC Final Order No. 36785, Case IPC-E-25-15 <https://puc.idaho.gov/Fileroom/PublicFiles/ELEC/IPC/IPCE2515/OrdNotc/20250930Final_Order_No_36785.pdf> | Idaho PUC Final Order No. 36785, Case No. IPC-E-25-15 (service date Sept 30, 2025) <https://puc.idaho.gov/Fileroom/PublicFiles/ELEC/IPC/IPCE2515/OrdNotc/20250930Final_Order_No_36785.pdf>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 24784,
   "eia_residential_installations_2025": 24015,
   "eia_capacity_mw_2025": 198.305
  },
  {
   "state": "Illinois",
   "usps": "IL",
   "type": "nmx",
   "type_label": "Net metering, excess below retail",
   "program": "Supply-only net metering for new systems",
   "export_credit": "Systems connected from 2025 get credits only against the energy-supply part of the bill; delivery charges apply to all grid use",
   "netting": "Monthly",
   "unused_credits": "ComEd: credits for systems connected from 2025 do not expire",
   "instrument": "220 ILCS 5/16-107.5",
   "in_effect": "January 1, 2025",
   "sources": "Illinois Shines (Illinois Power Agency), FAQs Related to Changes in Net Metering in Illinois - Consumers (26 July 2024) <https://illinoisshines.com/wp-content/uploads/2024/07/FAQs-Related-to-Changes-in-Net-Metering-In-Illinois-Consumers-26July2024.pdf> | ComEd, \"2025 Changes to Net Metering\" (062024) <https://azure-na-assets.contentstack.com/v3/assets/blt3ebb3fed6084be2a/blt81f54d30b184ae59/66630a42613ade000a0858cd/ComEd_2025-Changes-To-NetMetering.pdf> | ComEd Green Power Connection – Net Metering FAQ (2026, doc 20099-1, 0616A) <https://www.comed.com/cdn/assets/v3/assets/blt3ebb3fed6084be2a/bltceb8d9495434223b/6a3eb57c41c29aeee5636a03/20099-1_Net_Metering_FAQ_2026_0616A.pdf>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 193898,
   "eia_residential_installations_2025": 172981,
   "eia_capacity_mw_2025": 2302.625
  },
  {
   "state": "Indiana",
   "usps": "IN",
   "type": "nb",
   "type_label": "Net billing (export rate)",
   "program": "Excess Distributed Generation (EDG)",
   "export_credit": "Exports credited at 1.25 times the supplier's average marginal price of the most recent calendar year",
   "netting": "Instantaneous",
   "unused_credits": "Excess bill credit is carried forward",
   "instrument": "IC 8-1-40",
   "in_effect": "Net metering closed by July 1, 2022",
   "sources": "IURC Technical Conference handout reproducing IC 8-1-40 (P.L. 264-2017) (2017-07-20) <https://secure.in.gov/iurc/files/2017-07-20-IURC-Tech-Conf-Handout-re-IC-8-1-40.pdf>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 12956,
   "eia_residential_installations_2025": 11597,
   "eia_capacity_mw_2025": 278.499
  },
  {
   "state": "Iowa",
   "usps": "IA",
   "type": "nm",
   "type_label": "Net metering (retail credit)",
   "program": "Net billing or inflow-outflow billing (Iowa Code §476.49)",
   "export_credit": "Net billing nets kWh over the month at retail; inflow-outflow billing buys outflow at the retail volumetric rate",
   "netting": "Monthly (net billing) or inflow-outflow",
   "unused_credits": "Net billing: excess left after 12 months is cashed out at the utility's avoided cost, split with low-income assistance",
   "instrument": "Iowa Code §476.49",
   "in_effect": "Current statute",
   "sources": "Iowa Code 2026, §476.49 Distributed generation facilities - billing <https://www.legis.iowa.gov/docs/code/476.49.pdf>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 25988,
   "eia_residential_installations_2025": 21332,
   "eia_capacity_mw_2025": 367.534
  },
  {
   "state": "Kansas",
   "usps": "KS",
   "type": "nmx",
   "type_label": "Net metering, excess below retail",
   "program": "Net metering (Net Metering and Easy Connection Act)",
   "export_credit": "Net excess credited at no less than 100% of the utility's monthly system average cost of energy (post-2014 customers)",
   "netting": "Monthly",
   "unused_credits": "Credit applied to the next billing period",
   "instrument": "K.S.A. 66-1265 to 66-1267",
   "in_effect": "July 1, 2024 amendments",
   "sources": "K.S.A. 66-1265 Utility requirements <https://ksrevisor.gov/statutes/chapters/ch66/066_012_0065.html> | K.S.A. 66-1266 Interconnection agreements; billing; credit for exports <https://ksrevisor.gov/statutes/chapters/ch66/066_012_0066.html>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 11450,
   "eia_residential_installations_2025": 10870,
   "eia_capacity_mw_2025": 110.326
  },
  {
   "state": "Kentucky",
   "usps": "KY",
   "type": "nb",
   "type_label": "Net billing (export rate)",
   "program": "Net metering with a PSC-set export rate",
   "export_credit": "Exports credited in dollars at a rate the Public Service Commission sets for each utility",
   "netting": "Set by utility tariff",
   "unused_credits": "Excess bill credit carries forward",
   "instrument": "KRS 278.466",
   "in_effect": "Utility orders since 2019",
   "sources": "Kentucky PSC Order, Case No. 2023-00413 (Duke Energy Kentucky), 2024-10-11 <https://psc.ky.gov/order_vault/Orders_2024/202300413_10112024.pdf>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 11724,
   "eia_residential_installations_2025": 11061,
   "eia_capacity_mw_2025": 101.315
  },
  {
   "state": "Louisiana",
   "usps": "LA",
   "type": "nb",
   "type_label": "Net billing (export rate)",
   "program": "Net billing at avoided cost (LPSC Distributed Generation Rules)",
   "export_credit": "Exports credited at each utility's annual avoided cost rate (Entergy Louisiana $0.0386407/kWh from April 1, 2026)",
   "netting": "Set by utility tariff",
   "unused_credits": "Set by utility tariff",
   "instrument": "LPSC General Order 09-19-2019",
   "in_effect": "January 1, 2020 (rules); 2026 rates",
   "sources": "Louisiana PSC, Electric Net Metering <https://www.lpsc.louisiana.gov/Utilities_NetMetering> | Louisiana PSC, 2026 Avoided Cost Rate by Electric Utility (docx) <https://www.lpsc.louisiana.gov/docs/utilities/Avoided-Cost-Rates-2026.docx>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 37068,
   "eia_residential_installations_2025": 35972,
   "eia_capacity_mw_2025": 236.444
  },
  {
   "state": "Maine",
   "usps": "ME",
   "type": "nm",
   "type_label": "Net metering (retail credit)",
   "program": "Net energy billing (35-A M.R.S. §3209-A)",
   "export_credit": "kWh credits netted over each billing period, counting unused credits from earlier periods",
   "netting": "Monthly",
   "unused_credits": "Value of expired credits goes to low-income assistance",
   "instrument": "35-A M.R.S. §3209-A",
   "in_effect": "Current statute",
   "sources": "35-A M.R.S. §3209-A Net energy billing (Maine Revisor, data extracted 10/05/2026) <https://legislature.maine.gov/statutes/35-A/title35-Asec3209-A.html>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 90780,
   "eia_residential_installations_2025": 19516,
   "eia_capacity_mw_2025": 1886.183
  },
  {
   "state": "Maryland",
   "usps": "MD",
   "type": "nm",
   "type_label": "Net metering (retail credit)",
   "program": "Net energy metering (PUA §7-306)",
   "export_credit": "Monthly kWh netting at retail",
   "netting": "Monthly",
   "unused_credits": "Excess is paid each spring at the average generation (commodity) rate, or accrued indefinitely",
   "instrument": "Md. Code, Public Utilities §7-306",
   "in_effect": "Open until July 1, 2027 or 3,000 MW",
   "sources": "Md. Code, Public Utilities §7-306 <https://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=gpu&section=7-306&enactments=false>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 133007,
   "eia_residential_installations_2025": 127922,
   "eia_capacity_mw_2025": 1669.951
  },
  {
   "state": "Massachusetts",
   "usps": "MA",
   "type": "nm",
   "type_label": "Net metering (retail credit)",
   "program": "Net metering (220 CMR 18.00)",
   "export_credit": "Net excess kWh credited at the sum of basic service, distribution, transmission and transition charges",
   "netting": "Monthly",
   "unused_credits": "Residential credits carry forward indefinitely (National Grid and Eversource tariffs)",
   "instrument": "220 CMR 18.00",
   "in_effect": "Current rule",
   "sources": "220 CMR 18.04 Calculation of Net Metering Credits (via Cornell LII) <https://www.law.cornell.edu/regulations/massachusetts/220-CMR-18-04> | 220 CMR 18.07 Net Metering Capacity (via Cornell LII) <https://www.law.cornell.edu/regulations/massachusetts/220-CMR-18-07> | Massachusetts Electric Co./Nantucket Electric Co. – Net Metering Provision, M.D.P.U. No. 1625 (cancels No. 1598) <https://www.nationalgridus.com/media/pdfs/billing-payments/tariffs/mae/2026/mdpu-1625-net-metering-provision_03.01.2026.pdf> | NSTAR Electric Company d/b/a Eversource Energy – Net Metering, M.D.P.U. No. 68N (cancels 68M) <https://www.eversource.com/docs/default-source/rates-tariffs/ma-electric/68-tariff-ma.pdf>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 217813,
   "eia_residential_installations_2025": 210230,
   "eia_capacity_mw_2025": 3152.797
  },
  {
   "state": "Michigan",
   "usps": "MI",
   "type": "nb",
   "type_label": "Net billing (export rate)",
   "program": "Distributed Generation program (inflow/outflow)",
   "export_credit": "Outflow (exports) credited at the power-supply rate of the customer’s rate schedule (DTE, Consumers Energy)",
   "netting": "Inflow/outflow (no netting)",
   "unused_credits": "DTE: excess credit goes to an Excess Generation Bank and does not expire",
   "instrument": "DTE Rider 18; Consumers Energy DG tariff",
   "in_effect": "Current tariffs",
   "sources": "DTE Energy, welcome letter \"Distributed Generation Rider 18 program\" (PA235LetterRooftopSolar.pdf) <https://www.dteenergy.com/content/dam/dteenergy/deg/website/common/service-and-request/interconnection-process/PA235LetterRooftopSolar.pdf> | Consumers Energy – Distributed Generation (residential) page <https://www.consumersenergy.com/residential/renewable-energy/distributed-generation>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 31851,
   "eia_residential_installations_2025": 29923,
   "eia_capacity_mw_2025": 283.414
  },
  {
   "state": "Minnesota",
   "usps": "MN",
   "type": "nmx",
   "type_label": "Net metering, excess below retail",
   "program": "Net metering (Minn. Stat. §216B.164)",
   "export_credit": "Systems under 40 kW may be paid for monthly net input at the average retail utility energy rate",
   "netting": "Monthly",
   "unused_credits": "Paid or credited each month",
   "instrument": "Minn. Stat. §216B.164",
   "in_effect": "Current statute",
   "sources": "Minn. Stat. §216B.164 <https://www.revisor.mn.gov/statutes/cite/216B.164>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 30713,
   "eia_residential_installations_2025": 27948,
   "eia_capacity_mw_2025": 369.229
  },
  {
   "state": "Mississippi",
   "usps": "MS",
   "type": "nb",
   "type_label": "Net billing (export rate)",
   "program": "Net renewable generation (avoided cost plus adder)",
   "export_credit": "Exports credited at the basic avoided energy cost plus a 2.5¢/kWh distributed generation value, fixed for 25 years",
   "netting": "Set by tariff option",
   "unused_credits": "Set by tariff option",
   "instrument": "Mississippi Power Rate Schedule RENM-3",
   "in_effect": "May 27, 2025 (RENM-3)",
   "sources": "Mississippi Power, Renewable Energy Net Metering Rate Schedule RENM-3 (MPSC Schedule No. 59) <https://www.mississippipower.com/content/dam/mississippi-power/business/pricing-and-rates/2025/special-application-rates/RENM-3.pdf>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 2154,
   "eia_residential_installations_2025": 2030,
   "eia_capacity_mw_2025": 17.469
  },
  {
   "state": "Missouri",
   "usps": "MO",
   "type": "nmx",
   "type_label": "Net metering, excess below retail",
   "program": "Net metering (RSMo 386.890)",
   "export_credit": "Monthly excess credited at no less than the utility's avoided fuel cost",
   "netting": "Monthly",
   "unused_credits": "Credits expire 12 months after they are issued",
   "instrument": "RSMo 386.890",
   "in_effect": "Current statute",
   "sources": "RSMo 386.890 Net metering and easy connection act <https://revisor.mo.gov/main/OneSection.aspx?section=386.890>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 38762,
   "eia_residential_installations_2025": 34041,
   "eia_capacity_mw_2025": 484.42
  },
  {
   "state": "Montana",
   "usps": "MT",
   "type": "nm",
   "type_label": "Net metering (retail credit)",
   "program": "Net metering (MCA 69-8-601 et seq.)",
   "export_credit": "Excess kWh credited kWh for kWh on the next bill",
   "netting": "Monthly",
   "unused_credits": "Unused credit at the end of the customer's 12-month period goes to the utility without compensation",
   "instrument": "MCA 69-8-603",
   "in_effect": "Current statute",
   "sources": "MCA 69-8-603 Net energy measurement calculation (Montana Code Annotated 2025) <https://mca.legmt.gov/bills/mca/title_0690/chapter_0080/part_0060/section_0030/0690-0080-0060-0030.html> | MCA 69-8-611 Classification of service -- net metering customers <https://mca.legmt.gov/bills/mca/title_0690/chapter_0080/part_0060/section_0110/0690-0080-0060-0110.html>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 14071,
   "eia_residential_installations_2025": 13121,
   "eia_capacity_mw_2025": 111.944
  },
  {
   "state": "Nebraska",
   "usps": "NE",
   "type": "nmx",
   "type_label": "Net metering, excess below retail",
   "program": "Net metering (Neb. Rev. Stat. §70-2003)",
   "export_credit": "Usage is offset at the retail rate within the billing period; net excess is credited at the utility's avoided cost of electric supply",
   "netting": "Billing period",
   "unused_credits": "Monetary credits carry forward and are paid out at the end of each annualized period",
   "instrument": "Neb. Rev. Stat. §§70-2001 to 70-2005",
   "in_effect": "Laws 2009, LB436 (current text)",
   "sources": "Neb. Rev. Stat. §70-2002 (Nebraska Legislature) <https://nebraskalegislature.gov/laws/statutes.php?statute=70-2002> | Neb. Rev. Stat. §70-2003 (Nebraska Legislature) <https://nebraskalegislature.gov/laws/statutes.php?statute=70-2003> | Legislative Bill 20 (2025), slip law (Nebraska Legislature) <https://nebraskalegislature.gov/FloorDocs/109/PDF/Slip/LB20.pdf>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 4595,
   "eia_residential_installations_2025": 4180,
   "eia_capacity_mw_2025": 44.917
  },
  {
   "state": "Nevada",
   "usps": "NV",
   "type": "nmx",
   "type_label": "Net metering, excess below retail",
   "program": "Net metering with a tiered excess credit (NV Energy Rider NMR-405)",
   "export_credit": "Excess energy credited at 75% of the base retail rate in Tier 4, the open tier: $0.08717/kWh for Nevada Power single-family homes from July 1, 2026",
   "netting": "Set by tariff",
   "unused_credits": "Set by tariff",
   "instrument": "NV Energy Net Metering Rider NMR-405",
   "in_effect": "July 1, 2026 (current rates)",
   "sources": "NV Energy (Nevada Power) – Electric Rate Schedules for Residential and General Service Customer Generation, effective July 1, 2026 (bill insert np_netmetering_rates-7_1_30) <https://www.nvenergy.com/publish/content/dam/nvenergy/bill_inserts/2026/07_jul/np_netmetering_rates-7_1_30.pdf>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 143932,
   "eia_residential_installations_2025": 142565,
   "eia_capacity_mw_2025": 1235.656
  },
  {
   "state": "New Hampshire",
   "usps": "NH",
   "type": "nmx",
   "type_label": "Net metering, excess below retail",
   "program": "Net metering (NEM 2.0, RSA 362-A:9)",
   "export_credit": "Monthly net exports credited at 100% of default energy service and transmission charges and 25% of distribution charges",
   "netting": "Monthly",
   "unused_credits": "Monetary credits carry forward; balances over $100 can be cashed out after the March billing cycle",
   "instrument": "PUC Order No. 27,074 (Docket DE 22-060); Eversource NHPUC No. 10",
   "in_effect": "November 18, 2024 (order); January 1, 2025 (tariff pages)",
   "sources": "RSA 362-A:9, Net Energy Metering (New Hampshire General Court) <https://gc.nh.gov/rsa/html/XXXIV/362-A/362-A-9.htm> | NH PUC Order No. 27,074, Docket DE 22-060, Order on Net Metering (November 18, 2024) <https://www.puc.nh.gov/regulatory/Orders/2024orders/documents/22-060-2024-11-18-nhpuc-order-27074.pdf> | Eversource (Public Service Company of New Hampshire) NHPUC No. 10, Terms and Conditions, Net Metering, 1st Revised Pages 24A-24C <https://www.puc.nh.gov/Regulatory/Tariffs/Eversource-PSNH-Electric-Tariff.pdf>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 26762,
   "eia_residential_installations_2025": 25295,
   "eia_capacity_mw_2025": 360.053
  },
  {
   "state": "New Jersey",
   "usps": "NJ",
   "type": "nm",
   "type_label": "Net metering (retail credit)",
   "program": "Net metering (N.J.A.C. 14:8-4)",
   "export_credit": "Credits carry through a 12-month annualized period",
   "netting": "Annualized period",
   "unused_credits": "Credits left at the end of the annualized period are paid at the avoided cost of wholesale power",
   "instrument": "N.J.A.C. 14:8-4",
   "in_effect": "Current rule",
   "sources": "NJ BPU, Net metering technical conference slides, Docket QO24090723 (2025-02-10) <https://www.nj.gov/bpu/pdf/publicnotice/Net%20metering%20technical%20conference%20slides.pdf> | NJ BPU Order, Novitium Energy / Edgewater Borough remote net metering, BPU Docket No. QO22100635 (Agenda 11/9/22, Item 8D) <https://nj.gov/bpu/pdf/boardorders/2022/20221109/8D%20ORDER%20Remote%20Net%20Metering%20Application%20Novitium%20Energy%20Edgewater%20Borough.pdf> | NJ BPU, N.J.A.C. 14:8 readoption proposal (courtesy copy, April 21, 2011) — definition of \"annualized period\" <https://www.nj.gov/bpu/bpu/pdf/rules/Chapter%208%20Readoption%20Proposal%20_21%20April%202011_%20-%20COURTESY%20C.pdf>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 229667,
   "eia_residential_installations_2025": 220059,
   "eia_capacity_mw_2025": 3089.078
  },
  {
   "state": "New Mexico",
   "usps": "NM",
   "type": "nmx",
   "type_label": "Net metering, excess below retail",
   "program": "Net metering (17.9.570 NMAC)",
   "export_credit": "Excess kWh credited on the next bill, either as kWh or at the utility's energy rate (utility's choice)",
   "netting": "Monthly",
   "unused_credits": "Credits carried forward month to month",
   "instrument": "17.9.570.14 NMAC",
   "in_effect": "May 24, 2022 (rule)",
   "sources": "17.9.570.14 NMAC (Governing cogeneration and small power production), New Mexico Administrative Code <https://www.srca.nm.gov/parts/title17/17.009.0570.html>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 67353,
   "eia_residential_installations_2025": 65424,
   "eia_capacity_mw_2025": 449.283
  },
  {
   "state": "New York",
   "usps": "NY",
   "type": "nm",
   "type_label": "Net metering (retail credit)",
   "program": "Phase One net energy metering (VDER) with a Customer Benefit Contribution",
   "export_credit": "kWh net metering similar to the earlier tariff, with a 20-year term; systems connected since 2022 pay a monthly charge per kW-DC",
   "netting": "Monthly",
   "unused_credits": "No payout: credits roll forward until the 20-year term ends",
   "instrument": "NY PSC VDER Phase One Order (Case 15-E-0751)",
   "in_effect": "Charge for systems connected from January 1, 2022",
   "sources": "NYSERDA, \"Value of Distributed Energy Resources – Phase 1 Order: Highlights for Mass Market and Residential\" <https://www.nyserda.ny.gov/-/media/Project/Nyserda/Files/Programs/NY-Sun/VDER-mass-market.pdf> | NYSERDA, VDER Frequently Asked Questions <https://www.nyserda.ny.gov/-/media/Project/Nyserda/Files/Programs/NY-Sun/VDER-Frequently-Asked-Questions.pdf> | NYSERDA NY-Sun, \"2026 Utility Published Customer Benefit Contribution Rates\" (SUN-RSC-cbc-fs-1-v8, 4/26) <https://www.nyserda.ny.gov/-/media/Project/Nyserda/Files/Programs/NY-Sun/2026-Utility-Published-Customer-Benefit-Contribution-Rates.pdf>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 266059,
   "eia_residential_installations_2025": 252632,
   "eia_capacity_mw_2025": 6195.132
  },
  {
   "state": "North Carolina",
   "usps": "NC",
   "type": "tou",
   "type_label": "Successor net metering (time-of-use, minimum bill)",
   "program": "Duke Energy: Residential Solar Choice and Net Metering Bridge riders",
   "export_credit": "Net monthly exports credited at the Net Excess Energy Credit, based on the utility's avoided cost",
   "netting": "Monthly",
   "unused_credits": "Minimum monthly bill and non-bypassable charges apply",
   "instrument": "NCUC Docket E-100, Sub 180",
   "in_effect": "October 1, 2023; legacy customers move to Rider NMB on December 31, 2026",
   "sources": "NC Utilities Commission Public Staff, Net Metering <https://publicstaff.nc.gov/electric/net-metering> | NC Public Staff – Net Metering (summary of NCUC Order Approving Revised Net Metering Tariffs, Docket E-100, Sub 180, March 23, 2023, and Order Granting Extension of Time, May 17, 2023) <https://publicstaff.nc.gov/electric/net-metering>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 67383,
   "eia_residential_installations_2025": 65186,
   "eia_capacity_mw_2025": 585.724
  },
  {
   "state": "North Dakota",
   "usps": "ND",
   "type": "nmx",
   "type_label": "Net metering, excess below retail",
   "program": "Net energy billing (N.D. Admin. Code 69-09-07)",
   "export_credit": "Output offsets usage within the billing period; net excess is bought at the utility's avoided cost",
   "netting": "Billing period",
   "unused_credits": "Set by utility tariff",
   "instrument": "N.D. Admin. Code ch. 69-09-07",
   "in_effect": "Current rule",
   "sources": "N.D. Admin. Code chapter 69-09-07 (Public Service Commission, cogeneration and small power production) <https://www.ndlegis.gov/information/acdata/pdf/69-09-07.pdf>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 253,
   "eia_residential_installations_2025": 241,
   "eia_capacity_mw_2025": 1.952
  },
  {
   "state": "Ohio",
   "usps": "OH",
   "type": "nmx",
   "type_label": "Net metering, excess below retail",
   "program": "Net metering (R.C. 4928.67)",
   "export_credit": "Exports offset delivered energy 1:1 up to usage; excess credited at the generation component of the rate (FirstEnergy Ohio)",
   "netting": "Billing period",
   "unused_credits": "Credited to the account",
   "instrument": "R.C. 4928.67; OAC 4901:1-10-28",
   "in_effect": "Current tariffs",
   "sources": "FirstEnergy, Ohio interconnection & net metering FAQ <https://www.firstenergycorp.com/feconnect/ohio-interconnection/OH-retail-interconnection/frequentlyaskedquestions.html>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 35206,
   "eia_residential_installations_2025": 33496,
   "eia_capacity_mw_2025": 548.568
  },
  {
   "state": "Oklahoma",
   "usps": "OK",
   "type": "nmx",
   "type_label": "Net metering, excess below retail",
   "program": "Net metering (17 O.S. §156; OAC 165:40-9)",
   "export_credit": "Excess production bought at the utility's avoided energy cost",
   "netting": "Set by tariff",
   "unused_credits": "Paid or credited in the next billing cycle",
   "instrument": "17 O.S. §156; OAC 165:40-9",
   "in_effect": "Current rule",
   "sources": "Oklahoma Corporation Commission, Net Metering <https://oklahoma.gov/occ/divisions/public-utility/energy/electric-utility/netmetering.html>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 23476,
   "eia_residential_installations_2025": 21251,
   "eia_capacity_mw_2025": 191.854
  },
  {
   "state": "Oregon",
   "usps": "OR",
   "type": "nm",
   "type_label": "Net metering (retail credit)",
   "program": "Net metering (ORS 757.300)",
   "export_credit": "Excess kWh must be credited to later bills; a utility may instead value it at avoided cost",
   "netting": "Monthly",
   "unused_credits": "Unused credits after the March billing cycle go to low-income assistance",
   "instrument": "ORS 757.300",
   "in_effect": "Current statute",
   "sources": "ORS 757.300 Requirement to provide net metering (text via oregon.public.law) <https://oregon.public.law/statutes/ors_757.300>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 65253,
   "eia_residential_installations_2025": 61926,
   "eia_capacity_mw_2025": 542.352
  },
  {
   "state": "Pennsylvania",
   "usps": "PA",
   "type": "nm",
   "type_label": "Net metering (retail credit)",
   "program": "Net metering (52 Pa. Code §75.13)",
   "export_credit": "Credited at the full retail kWh rate, including generation, transmission and distribution charges",
   "netting": "Monthly",
   "unused_credits": "Excess left at year end is paid at the default service provider's price to compare",
   "instrument": "52 Pa. Code §75.13",
   "in_effect": "Current rule",
   "sources": "52 Pa. Code §75.13 General provisions (net metering) - via Cornell LII mirror of the Pennsylvania Code <https://www.law.cornell.edu/regulations/pennsylvania/52-Pa-Code-SS-75-13>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 98677,
   "eia_residential_installations_2025": 94860,
   "eia_capacity_mw_2025": 1343.348
  },
  {
   "state": "Rhode Island",
   "usps": "RI",
   "type": "nm",
   "type_label": "Net metering (retail credit)",
   "program": "Net metering (Rhode Island Energy Net Metering Provision)",
   "export_credit": "Production up to 100% of the customer's use is credited at the Last Resort Service rate (without the Renewable Energy Standard charge) plus distribution, transmission and transition charges; production from 100% to 125% at the Last Resort Service rate",
   "netting": "Billing period",
   "unused_credits": "Residential systems of 25 kW or less may carry unused credits forward; remaining balances can be cashed out once a year",
   "instrument": "R.I. Gen. Laws § 39-26.4; RIPUC No. 2279",
   "in_effect": "May 12, 2026",
   "sources": "Rhode Island Energy (The Narragansett Electric Company), Net Metering Provision, RIPUC No. 2279 <https://rienergy.com/site/-/media/rie-jss-app/home/ways-to-save/rates-and-shopping/service-rates/residential-rates/tariff-provisions/Net-Metering-Provision-RIPUC-2274-061826.pdf>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 20719,
   "eia_residential_installations_2025": 20006,
   "eia_capacity_mw_2025": 627.574
  },
  {
   "state": "South Carolina",
   "usps": "SC",
   "type": "tou",
   "type_label": "Successor net metering (time-of-use, minimum bill)",
   "program": "Solar choice metering (S.C. Code §58-40-20)",
   "export_credit": "Set in each utility's solar choice tariff under a Commission-approved methodology",
   "netting": "Set by utility tariff",
   "unused_credits": "Set by utility tariff",
   "instrument": "S.C. Code §58-40-20",
   "in_effect": "Legacy net metering continues until May 31, 2029",
   "sources": "S.C. Code §58-40-20 Net energy metering; solar choice metering <https://www.scstatehouse.gov/code/t58c040.php>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 42578,
   "eia_residential_installations_2025": 41617,
   "eia_capacity_mw_2025": 386.295
  },
  {
   "state": "South Dakota",
   "usps": "SD",
   "type": "ac",
   "type_label": "No statewide rule (utility buyback)",
   "program": "No net metering: utilities buy exports at avoided cost",
   "export_credit": "PUC-regulated utilities must buy power from small solar facilities at no less than their avoided cost; each utility files its purchase rates for facilities of 100 kW or less",
   "netting": "Set by utility",
   "unused_credits": "Set by utility",
   "instrument": "SDCL 49-34A-108",
   "in_effect": "SL 2010, ch 224 (statute)",
   "sources": "South Dakota Public Utilities Commission, Frequently Asked Questions about Solar Energy (Oct. 10, 2024) <https://puc.sd.gov/Publications/solarfaq.aspx> | South Dakota Public Utilities Commission, Compensation (net metering) page <https://puc.sd.gov/energy/wind/compensation.aspx> | SDCL 49-34A-108 (South Dakota Legislature) <https://sdlegislature.gov/Statutes/49-34A-108>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 647,
   "eia_residential_installations_2025": 588,
   "eia_capacity_mw_2025": 5.127
  },
  {
   "state": "Tennessee",
   "usps": "TN",
   "type": "ac",
   "type_label": "No statewide rule (utility buyback)",
   "program": "No statewide net metering: TVA Dispersed Power Production",
   "export_credit": "TVA buys output from qualifying facilities, including homes, at its avoided cost: 3.373¢/kWh for all kWh in November 2026",
   "netting": "Set by TVA and the local power company",
   "unused_credits": "Paid monthly under a power purchase agreement",
   "instrument": "TVA Dispersed Power Price Schedule CSPP",
   "in_effect": "November 1, 2026",
   "sources": "Tennessee Valley Authority, Dispersed Power Production Guidelines and Dispersed Power Price Schedule CSPP (effective November 1, 2026) <https://energyright.com/wp-content/uploads/2026/11/November-2026-DPP-Guidelines-for-Publish.pdf> | Tennessee Valley Authority, Valley Renewable Energy <https://www.tva.com/energy/valley-renewable-energy>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 110,
   "eia_residential_installations_2025": 98,
   "eia_capacity_mw_2025": 1.107
  },
  {
   "state": "Texas",
   "usps": "TX",
   "type": "ac",
   "type_label": "No statewide rule (utility buyback)",
   "program": "No statewide net metering: buyback is set by your retail provider or utility",
   "export_credit": "Where you can choose a retail electric provider, the buyback rate is part of your plan contract; elsewhere your utility sets it",
   "netting": "Set by plan or utility",
   "unused_credits": "Set by plan or utility",
   "instrument": "PUCT Solar Guide for Consumers",
   "in_effect": "March 2026 (guide)",
   "sources": "PUCT 'Solar Guide for Consumers' (March 2026) - PUCT publication, copy hosted by City of Bellville <https://www.cityofbellville.com/upload/page/0201/PUC%20Solar%20Guide%20for%20Consumers_March%202026.pdf>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 145645,
   "eia_residential_installations_2025": 143553,
   "eia_capacity_mw_2025": 1191.527
  },
  {
   "state": "Utah",
   "usps": "UT",
   "type": "nb",
   "type_label": "Net billing (export rate)",
   "program": "Net billing (Rocky Mountain Power Schedule 137)",
   "export_credit": "Exports credited at 4.855¢/kWh in June–September bills and 4.033¢/kWh in October–May bills",
   "netting": "None",
   "unused_credits": "Unused credits expire at the end of the annual period (March); no cash-out",
   "instrument": "Rocky Mountain Power Schedule No. 137",
   "in_effect": "March 1, 2026 (current rates)",
   "sources": "Rocky Mountain Power Utah Electric Service Schedule No. 137 Net Billing Service (P.S.C.U. No. 52) <https://www.rockymountainpower.net/content/dam/pcorp/documents/en/rockymountainpower/rates-regulation/utah/rates/137_Net_Billing_Service.pdf> | Rocky Mountain Power Utah Electric Service Schedule No. 137 – Net Billing Service <https://www.rockymountainpower.net/content/dam/pcorp/documents/en/rockymountainpower/rates-regulation/utah/rates/137_Net_Billing_Service.pdf>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 88360,
   "eia_residential_installations_2025": 86415,
   "eia_capacity_mw_2025": 635.882
  },
  {
   "state": "Vermont",
   "usps": "VT",
   "type": "nm",
   "type_label": "Net metering (retail credit)",
   "program": "Net-metering (30 V.S.A. §8010; PUC Rule 5.100)",
   "export_credit": "Monthly excess credited at the blended residential rate, adjusted by siting and REC adjustors",
   "netting": "Monthly",
   "unused_credits": "Bill credits",
   "instrument": "30 V.S.A. §8010; Rule 5.100",
   "in_effect": "August 1, 2026 (biennial update)",
   "sources": "Vermont PUC, 2026 Biennial Update of the Net-Metering Program, Order, Case No. 26-0291-INV (2026-05-29) <https://puc.vermont.gov/sites/psbnew/files/documents/2026-biennial-final.pdf> | Vermont PUC, Net-Metering page <https://puc.vermont.gov/electric/net-metering>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 10477,
   "eia_residential_installations_2025": 9676,
   "eia_capacity_mw_2025": 199.831
  },
  {
   "state": "Virginia",
   "usps": "VA",
   "type": "nm",
   "type_label": "Net metering (retail credit)",
   "program": "Net energy metering (Va. Code §56-594)",
   "export_credit": "kWh netting at retail over a 12-month net metering period",
   "netting": "12-month period",
   "unused_credits": "Excess left at the end of the period is bought at a rate the SCC sets",
   "instrument": "Va. Code §56-594",
   "in_effect": "Current statute; Dominion's successor tariff was approved April 30, 2026",
   "sources": "Va. Code §56-594 Net energy metering provisions (both versions: until and from Jan 1, 2027) <https://law.lis.virginia.gov/vacode/title56/chapter23/section56-594/> | Virginia SCC, Order on Clarification, Case No. PUR-2025-00079 (May 20, 2026), Doc. Con. Cen. No. 260550045 (copy hosted by Piedmont Environmental Council) <https://www.pecva.org/wp-content/uploads/PUR-2025-00079-Clairification_5-20-26.pdf>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 76426,
   "eia_residential_installations_2025": 74597,
   "eia_capacity_mw_2025": 728.504
  },
  {
   "state": "Washington",
   "usps": "WA",
   "type": "nm",
   "type_label": "Net metering (retail credit)",
   "program": "Net metering (RCW 80.60)",
   "export_credit": "Excess kWh carried to the next billing period, kWh for kWh",
   "netting": "Monthly",
   "unused_credits": "Unused credits go to the utility on March 31 each year",
   "instrument": "RCW 80.60.020–.030",
   "in_effect": "Mandatory offering until June 30, 2029 or a capacity limit",
   "sources": "RCW 80.60.030 <https://app.leg.wa.gov/RCW/default.aspx?cite=80.60.030> | RCW 80.60.020 <https://app.leg.wa.gov/RCW/default.aspx?cite=80.60.020>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 71870,
   "eia_residential_installations_2025": 68605,
   "eia_capacity_mw_2025": 567.576
  },
  {
   "state": "West Virginia",
   "usps": "WV",
   "type": "nb",
   "type_label": "Net billing (export rate)",
   "program": "Net metering under utility tariffs (W. Va. Code §24-2F-8)",
   "export_credit": "Set by the Public Service Commission for each utility",
   "netting": "Set by utility tariff",
   "unused_credits": "Set by utility tariff",
   "instrument": "W. Va. Code §24-2F-8",
   "in_effect": "Current statute",
   "sources": "W. Va. Code §24-2F-8 Net metering and interconnection standards <https://code.wvlegislature.gov/24-2F-8/>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 5360,
   "eia_residential_installations_2025": 4986,
   "eia_capacity_mw_2025": 62.454
  },
  {
   "state": "Wisconsin",
   "usps": "WI",
   "type": "nmx",
   "type_label": "Net metering, excess below retail",
   "program": "Net metering under utility buyback tariffs (PSC-approved)",
   "export_credit": "Set by each utility; We Energies credits monthly net excess at an avoided energy cost of $0.03636/kWh in 2026",
   "netting": "Monthly (We Energies)",
   "unused_credits": "We Energies pays accumulated credits by check once they exceed $100",
   "instrument": "Utility parallel generation tariffs; Wis. Admin. Code ch. PSC 119 (interconnection)",
   "in_effect": "2026 rates (We Energies; updated every January 1)",
   "sources": "Public Service Commission of Wisconsin, Customer-Owned Electrical Generation <https://psc.wi.gov/Pages/ForConsumers/MoreResources/CustomerOwnedGeneration.aspx> | We Energies (Wisconsin Electric Power Company), 2026 Customer generation rates (CGS NM, as authorized by the PSCW) <https://www.we-energies.com/olb/26/2026-01-we-customer-generation-rates.pdf>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 24726,
   "eia_residential_installations_2025": 22149,
   "eia_capacity_mw_2025": 341.551
  },
  {
   "state": "Wyoming",
   "usps": "WY",
   "type": "nm",
   "type_label": "Net metering (retail credit)",
   "program": "Net metering (W.S. 37-16-101 et seq.)",
   "export_credit": "Excess kWh credited or compensated on the following month's bill",
   "netting": "Monthly",
   "unused_credits": "Unused credit at the start of each calendar year is sold to the utility at its filed avoided cost",
   "instrument": "W.S. 37-16-101 to -104",
   "in_effect": "Current statute",
   "sources": "Wyoming Statutes Title 37, Chapter 16, Article 1 (W.S. 37-16-101 to -104), compiled PDF <https://wyoleg.gov/statutes/compress/title37.pdf>",
   "rules_checked": "2026-11-16",
   "eia_net_metering_customers_2025": 3981,
   "eia_residential_installations_2025": 3752,
   "eia_capacity_mw_2025": 27.685
  }
 ]
}